ML19318D101
| ML19318D101 | |
| Person / Time | |
|---|---|
| Site: | Crane, Crystal River |
| Issue date: | 06/30/1980 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| TLL-309, NUDOCS 8007070343 | |
| Download: ML19318D101 (1) | |
Text
Metropolitan Edison Company Post Office Box 480 g
Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Number June 30,1980 TLL 309 Office of Nuclear Reactor Regulation Attn: Harold R. Denton U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Corrective Actions in Response to the Crystal River Incident In our letter of May 29, 1980, (TLL 245) we indicated that a description of the tests verifying the effects of the combination of power loss on instruments and control functions would be provided by June 30, 1980. Due to the relationship of these tests to the CR-3 event and IE Bulletin 79-27 response, these tests will be provided on September 30, 1980.
Sincerely i
J. G. Herbein Vice President TMI-I JGH:LWH:1ma cc:
D. DiIanni H. Silver R. Reid J. T. Collins 3
5 i/o
?
Metr litan Ed: son Company is a Member of the General Pubbc Ut:hties System 8Wgdg