ML19318D101

From kanterella
Jump to navigation Jump to search
Informs That Due to Relationship of Tests to Crystal River 3 Event & IE Bulletin 79-27 Response,Tests Verifying Effects of Combination of Power Loss on Instruments & Control Functions Will Be Provided by 800930
ML19318D101
Person / Time
Site: Crane, Crystal River  Constellation icon.png
Issue date: 06/30/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
TLL-309, NUDOCS 8007070343
Download: ML19318D101 (1)


Text

Metropolitan Edison Company Post Office Box 480 g

Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Number June 30,1980 TLL 309 Office of Nuclear Reactor Regulation Attn: Harold R. Denton U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Corrective Actions in Response to the Crystal River Incident In our letter of May 29, 1980, (TLL 245) we indicated that a description of the tests verifying the effects of the combination of power loss on instruments and control functions would be provided by June 30, 1980. Due to the relationship of these tests to the CR-3 event and IE Bulletin 79-27 response, these tests will be provided on September 30, 1980.

Sincerely i

J. G. Herbein Vice President TMI-I JGH:LWH:1ma cc:

D. DiIanni H. Silver R. Reid J. T. Collins 3

5 i/o

?

Metr litan Ed: son Company is a Member of the General Pubbc Ut:hties System 8Wgdg