ML19318D067

From kanterella
Jump to navigation Jump to search
RO 80-12:during Liquid Penetrant Examinations of Piping,Two Linear Indications Were Found on Weld Used to Join Valve to Schedule 10 Coupling.Valve Will Be Removed & Examined
ML19318D067
Person / Time
Site: Yankee Rowe
Issue date: 06/27/1980
From: Autio H
YANKEE ATOMIC ELECTRIC CO.
To:
References
IEB-79-17, NUDOCS 8007070284
Download: ML19318D067 (1)


Text

_ _ _

2J, m

THIS DOCUMEtiT CO.1TAlits $

P00R QUALITY PAGES

L j YANKEE AT0El0 ELECTRIC COMPANY Aowe,Mossochusett: Of 3d7 Jtme 27,1980 thited States Nuclear Regulatory Comunission Office of T*wtion and Ertforcement Region I 631 Park Avenus King of Prussia, Pennsylvania 19406 Attantion: Mr. B. H. Brier Dost Mr. Grier:

Pursuant to the requirements of E Bulletin 79-17, " Pipe Cracks In Star =*

Borsted Mater Systems At PMR Plants", paragraph 4 page 4, the following is reported as Reportable Occurrence 50-29/80-12.

During ligM penetrant examinations of piping associated with the boric acid system. two linear indications were foted on a weld used to, join a 2-1/2" valve o a 2-1/2" schedule 10 coupling.

Die valve will be removed and en d en the interior weld surface. Should there ba no tiuQ the wall penetration, this un will be cancelled.

A more detailed report will be made in 14 days if the requirements of E Bulletin 79-17 syn 2y.

Very truly yours, rbert A. Astio Plant Steerintendent hO) i g

/

5

........Ih........

seg 8 007 0'10 Q g t

.