Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245C085 + (08:14:42, 2 December 2024)
- ML20245C080 + (08:14:43, 2 December 2024)
- ST-HL-AE-2279, Forwards Revised Pages 3.6.A-1,3.6.A-2,9.2.9 & 9.2.10 from FSAR Amend 61.Pages Revised to Correct Misprinting of Obverse Pages.Replacement Pages Will Be Included in Future Amend + (08:14:44, 2 December 2024)
- ML20245C077 + (08:14:45, 2 December 2024)
- ML20245C074 + (08:14:47, 2 December 2024)
- ML20245C069 + (08:14:47, 2 December 2024)
- ML20245C067 + (08:14:48, 2 December 2024)
- ML20245C065 + (08:14:50, 2 December 2024)
- ML20245C062 + (08:14:51, 2 December 2024)
- ST-HL-AE-2266, Responds to NRC Re Violations Noted in Insp Repts 50-498/87-08 & 50-499-87-08.Corrective Actions: Nonconformance Rept Issued Following Discovery of Missing Screen Matl from RCS Temporary Full Flow Filters + (08:14:51, 2 December 2024)
- ML20245C059 + (08:14:54, 2 December 2024)
- ML20245C054 + (08:14:55, 2 December 2024)
- ML20245C050 + (08:14:55, 2 December 2024)
- ML20245C049 + (08:14:56, 2 December 2024)
- ML20245C047 + (08:14:56, 2 December 2024)
- ML20245C037 + (08:14:58, 2 December 2024)
- 05000259/LER-1989-010, :on 890323,ESF Actuations Occurred.Caused by Output Voltage of Reactor Protection Sys Motor Generator Set 1B Rising Above Circuit Protector Overvoltage Relay Setpoint.Actuation Logic Reset + (08:15:00, 2 December 2024)
- NLS8900162, Responds to NRC Re Violations Noted in Insp Rept 50-298/89-07.Corrective Action:Div Manager Counseled on Importance of Meeting Assigned Response Times Re NRC Correspondence + (08:15:01, 2 December 2024)
- ML20245C027 + (08:15:02, 2 December 2024)
- ML20245C025 + (08:15:03, 2 December 2024)
- PNO-V-87-047A, on 870621,interruption in Power to Phase B of non-1E Uninterruptible Power Supply Caused Sharp Reduction in Feedwater Control Valve for Steam Generator 88,causing Reactor Trip.Update Confirms Operation of Safety Functions + (08:15:03, 2 December 2024)
- ML20245C022 + (08:15:04, 2 December 2024)
- ML20245C018 + (08:15:05, 2 December 2024)
- ML20245C014 + (08:15:06, 2 December 2024)
- ML20245C017 + (08:15:06, 2 December 2024)
- ML20245C012 + (08:15:07, 2 December 2024)
- ML20245C007 + (08:15:08, 2 December 2024)
- ML20245C006 + (08:15:08, 2 December 2024)
- ML20245C005 + (08:15:09, 2 December 2024)
- ML20245C003 + (08:15:09, 2 December 2024)
- ML20245C002 + (08:15:10, 2 December 2024)
- ML20245B995 + (08:15:11, 2 December 2024)
- ML20245B992 + (08:15:12, 2 December 2024)
- ML20245B993 + (08:15:12, 2 December 2024)
- SNRC-1588, Discusses Implementation Status of TMI Action Plan Items at Facility.Util Will Submit Modified Core Damage Procedure,Per Item II.B.3,that Includes Estimation of Cladding Failure Due to Fuel Overheating + (08:15:13, 2 December 2024)
- ML20245B985 + (08:15:14, 2 December 2024)
- ML20245B988 + (08:15:14, 2 December 2024)
- ML20245B978 + (08:15:15, 2 December 2024)
- ML20245B980 + (08:15:15, 2 December 2024)
- ML20245B976 + (08:15:17, 2 December 2024)
- ML20245B977 + (08:15:17, 2 December 2024)
- IR 05000134/1987002 + (08:15:20, 2 December 2024)
- 05000245/LER-1987-013-01, :on 870527,standby Gas Treatment Sys Automatically Initiated & Reactor Bldg Ventilation Sys Isolated.Caused by Underwater Vacuum Canisters Floating to Surface of Fuel Pool.Procedures Revised + (08:15:22, 2 December 2024)
- ML20245B964 + (08:15:23, 2 December 2024)
- ML20245B963 + (08:15:23, 2 December 2024)
- ML20245B959 + (08:15:24, 2 December 2024)
- ML20245B956 + (08:15:25, 2 December 2024)
- ML20245B955 + (08:15:25, 2 December 2024)
- ML20245B952 + (08:15:26, 2 December 2024)
- ML20245B953 + (08:15:26, 2 December 2024)
- IR 05000271/1989003 + (08:15:27, 2 December 2024)
- 3F0489-13, Forwards Summary Re Status of Implementation of TMI Action Plan Items at Facility.W/O Encl + (08:15:28, 2 December 2024)