Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245K677 + (05:52:25, 2 December 2024)
- ML20245K675 + (05:52:26, 2 December 2024)
- ML20245K673 + (05:52:27, 2 December 2024)
- ML20245K670 + (05:52:28, 2 December 2024)
- 05000373/LER-1989-020, :on 890529,unit 250 Volt Dc Main Feed Circuit Breaker to Bus 121Y Failed During Manual Closure Attempt, Rendering RCIC Sys Inoperable.Caused by Failure of Main Feed Circuit Breaker.Closing Mechanism Repaired + (05:52:30, 2 December 2024)
- ML20245K662 + (05:52:31, 2 December 2024)
- ML20245K654 + (05:52:32, 2 December 2024)
- ML20245K652 + (05:52:33, 2 December 2024)
- ML20245K649 + (05:52:34, 2 December 2024)
- ML20245K648 + (05:52:35, 2 December 2024)
- PY-CEI-NRR-1025, Forwards Evaluation of Containment Airborne Contamination Levels & Benefit of Purge Operations,Per 850326 Commitment & Recommends Rev of Tech Spec as Shown on Attached Page 3/4 6-12 + (05:52:36, 2 December 2024)
- ML20245K642 + (05:52:37, 2 December 2024)
- ML20245K645 + (05:52:37, 2 December 2024)
- ML20245K641 + (05:52:38, 2 December 2024)
- ML20245K640 + (05:52:39, 2 December 2024)
- ML20245K638 + (05:52:40, 2 December 2024)
- ML20245K636 + (05:52:40, 2 December 2024)
- ML20245K635 + (05:52:41, 2 December 2024)
- ML20245K633 + (05:52:42, 2 December 2024)
- IR 05000313/1989026 + (05:52:44, 2 December 2024)
- ML20245K626 + (05:52:45, 2 December 2024)
- ML20245K625 + (05:52:46, 2 December 2024)
- ML20245K623 + (05:52:46, 2 December 2024)
- ML20245K621 + (05:52:47, 2 December 2024)
- ML20245K620 + (05:52:48, 2 December 2024)
- ML20245K614 + (05:52:49, 2 December 2024)
- ML20245K612 + (05:52:50, 2 December 2024)
- ML20245K611 + (05:52:51, 2 December 2024)
- 05000325/LER-1988-034, :on 881216,clearance Hug on Drywell Instrument Air Sys Which Could Have Prevented Secondary Containment Isolation Dampers from Operating as Required.Caused by Design Deficiency.Standing Instruction Issued + (05:52:53, 2 December 2024)
- ML20245K597 + (05:52:55, 2 December 2024)
- ML20245K595 + (05:52:56, 2 December 2024)
- ML20245K591 + (05:52:57, 2 December 2024)
- ML20245K594 + (05:52:57, 2 December 2024)
- ML20245K589 + (05:52:58, 2 December 2024)
- ML20245K582 + (05:52:59, 2 December 2024)
- ML20245K575 + (05:53:00, 2 December 2024)
- ML20245K571 + (05:53:01, 2 December 2024)
- ML20245K570 + (05:53:02, 2 December 2024)
- ML20245K568 + (05:53:03, 2 December 2024)
- U-601513, Forwards Rept of 890720 Spare Transformer Oil Spill Per App B of Environ Protection Plan.Caused by Pressure Buildup in Atmoseal Tank Resulting in Three Inch Crack.Floating Booms Placed in Lake to Contain Spill + (05:53:03, 2 December 2024)
- ML20245K567 + (05:53:05, 2 December 2024)
- ML20245K561 + (05:53:06, 2 December 2024)
- ML20245K564 + (05:53:06, 2 December 2024)
- ML20245K558 + (05:53:07, 2 December 2024)
- ML20245K556 + (05:53:08, 2 December 2024)
- ML20245K557 + (05:53:08, 2 December 2024)
- ML20245K554 + (05:53:09, 2 December 2024)
- NRC-89-0165, Responds to NRC Concern Re Ability of Employees & Contractors to Raise Safety Issues to Licensee Mgt & Nrc. Licensee Understands & Endorses Importance of Maintaining Pathway Unrestricted + (05:53:10, 2 December 2024)
- ML20245K551 + (05:53:11, 2 December 2024)
- ML20245K550 + (05:53:12, 2 December 2024)
- ST-HL-AE-3132, Application for Amends to Licenses NPF-76 & NPF-80,allowing +/- Six Month Tolerance on First Three Surveillances on post-tensioning Tendons & +/- One Yr Tolerance on All Other Surveillances + (05:53:12, 2 December 2024)