Text
.
..
.-
'.
JUN 2 21989
-
1
In Reply Refer To:
Dockets: 50-313/89-26
50-368/89-26
Arkansas Power & Light Company
ATTH: Mr. Gene Campbell
Vice President, Nuclear
i
Operations
P.O. Box 551
i
.
Little Rock, Arkansas 72203
Gentlemen:
h
This refers to the inspection conducted by Mr. A. Singh of this' office during
'
'
the period June 5-9, 1989, of act19jties authorized by NRC Operating
-,
Licenses DPR-51 and NPF-6 for the Arkensas Nuclear One, Units 1 and 2, and to
i
the discussion of our findings with the other members of your staff at the
j
conclusion of the inspection
i
f
Areas examined during the inspection included a review of your Technical
Specification (TS) required calibration program..and your program for the.
.
j
calibration of components associated with-safety-related systems not specifically
addressed in your TS. Within these areas, the inspection consisted of selected
.
examination of procedures and representative records, interviews with personnel,
and observations by the NRC~ inspector. 'The inspection findings are documented
in the enclosed inspection report.
During this inspection, it was.found that certain of your ~ activities were in
violation of NRC requirements. However, the violation had little safety
l
significance and appeared to be a few isolated instances within the context of
^
a generally effective program. Accordingly, in accordance with 10 CFR Part 2,.
1
Appendix C of the NRC Enforcement Policy, a Notice of Violation has not been
attached and no response is required.
Also during this inspection, it was found that certain of your activities
,
appeared to deviate from commitment made to the NRC. This item and reference
to the commitment is identified in the enclosed Notice of Deviation." You are
requested to respond to this deviation in writing. Your response'should be,
based on the specifics contained in the Notice of Deviation. enclosed with this
letter,
,
,
!
'(f
h
l
g8hq'
JLMil o/ "
!
.
D:DRP
RIV:RI:PSS *
C:PS
D:DRP
-
ASingh/tw
TFSte a
LJC44
an
!
y p
.( / M 89
6 /pg/89
(p
8.t
'
(//12/89
- previously concurred
'
g70gy 8h
3
\\
-
o
.
.. _. .. .
..
. ..
.
.
. , . . ..
..
.
,
..
7
,.
.
.
',
-
.
Arkansas Power & t.ight Company.'
-2-
..
,
1
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.--
Sincerely,
x
/s/
aac dahu>
j
Jarres L. Milhoan. Director
Division of. Reactor Projects
Enclosures:
.
!
1.
Appendix A - Notice of Deviation
.
2.
Appendix B - NRC Inspection Report
.
50-313/89-26
<
50-368/89-26
cc w/ enclosures:
Arkansas Nuclear One-
ATTN:
N. S. Carns. Director
.
Nuclear Operations'
l
P.O. Box 608
Russellville Arkansas 72801
Arkansas Radiation Control Program Director
bcctoDMB(IE01)
bcc distrib. by RIV:
- RRI
- R. D. Martin, RA
- RPB-DRSS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
'
i
- RSTS Operator
- ProjectEngineer(DRP/A)
l
l
- DRS(2 copies)
- A. Singh
I
- T. Stetka
- C. Harbuck, NRR Project Manager (MS:
13-D-18)
- C. Poslusny, NRR Project Manager (MS:
13-D-18)
- w/766
-
- - - .--