Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246A866 + (05:29:13, 2 December 2024)
- ML20246A865 + (05:29:14, 2 December 2024)
- B13290, Responds to NRC 890519 Denial of GE Request for Withholding from Public Disclosure GE Proprietary Info Presented in Util .Requests That Be Withheld from Disclosure,Per 10CFR2.790 + (05:29:15, 2 December 2024)
- ML20246A859 + (05:29:16, 2 December 2024)
- ML20246A860 + (05:29:16, 2 December 2024)
- ML20246A858 + (05:29:17, 2 December 2024)
- ML20246A857 + (05:29:18, 2 December 2024)
- PNO-IV-89-043, on 890626,licensed Operator Radiologically Contaminated When Valve Packing Blew Out While Operator Operating Valve.Approx 2,000 Square Ft of Turbine Bldg Contaminated.Valve Repacked & Returned to Normal Position + (05:29:18, 2 December 2024)
- ML20246A854 + (05:29:19, 2 December 2024)
- ML20246A851 + (05:29:20, 2 December 2024)
- ML20246A850 + (05:29:21, 2 December 2024)
- 05000368/LER-1989-012-01, :on 890626,RCS Backleakage Through Safety Injection Sys Check Valve Occurred Three Times.Caused by Missing Internal Parts.Cause of Missing Rollpins Could Not Be Determined.Rollpins Replaced + (05:29:22, 2 December 2024)
- ML20246A847 + (05:29:24, 2 December 2024)
- ML20246A842 + (05:29:25, 2 December 2024)
- ML20246A844 + (05:29:25, 2 December 2024)
- ML20246A837 + (05:29:26, 2 December 2024)
- ML20246A833 + (05:29:27, 2 December 2024)
- ML20246A831 + (05:29:27, 2 December 2024)
- ML20246A827 + (05:29:28, 2 December 2024)
- ML20246A829 + (05:29:28, 2 December 2024)
- ML20246A824 + (05:29:29, 2 December 2024)
- ML20246A820 + (05:29:30, 2 December 2024)
- ML20246A821 + (05:29:30, 2 December 2024)
- IR 05000382/1989009 + (05:29:31, 2 December 2024)
- ML20246A816 + (05:29:32, 2 December 2024)
- ML20246A817 + (05:29:32, 2 December 2024)
- ML20246A812 + (05:29:33, 2 December 2024)
- ML20246A810 + (05:29:33, 2 December 2024)
- ML20246A808 + (05:29:34, 2 December 2024)
- ML20246A804 + (05:29:35, 2 December 2024)
- ML20246A805 + (05:29:35, 2 December 2024)
- IR 05000445/1989056 + (05:29:36, 2 December 2024)
- 05000483/LER-1989-006, :on 890529,reactor Trip Occurred on Power Range Neutron Flux Rate Trip Signal.Caused by Lack of Detail Provided in Plant Procedures.Procedure ESP-ZZ-00006, Incore /Excore Calibr Revised + (05:29:38, 2 December 2024)
- ML20246A797 + (05:29:39, 2 December 2024)
- ML20246A796 + (05:29:40, 2 December 2024)
- 3F0689-15, Commits to Propose Appropriate Reactor Coolant Inventory Tracking Sys & Core Exit Thermocouple Tech Specs,Per TMI Item II.F.2,by End of Jul 1989,in Response to NRC + (05:29:42, 2 December 2024)
- ML20246A793 + (05:29:42, 2 December 2024)
- ML20246A788 + (05:29:43, 2 December 2024)
- 05000260/LER-1989-017, :on 890607,intermediate Range Monitors C,G & H of Neutron Monitoring Sys Received hi-hi Signal.Caused by Failure to Implement Action to Disable Tungsten Inert Gas Auto Start Function.Memo Issued to Managers + (05:29:45, 2 December 2024)
- ML20246A782 + (05:29:46, 2 December 2024)
- ML20246A778 + (05:29:47, 2 December 2024)
- ML20246A776 + (05:29:48, 2 December 2024)
- ML20246A775 + (05:29:49, 2 December 2024)
- PNO-IV-89-040, from 890622-23,power Exceeded 82% & Secondary Heat Balance Indication in Control Room Read Approx 79.2%.On 890623,discovered Incorrect Input Into Secondary Heat Balance Calculation.Power Reduced to 65% Pending Evaluation + (05:29:49, 2 December 2024)
- PNO-IV-89-042, on 890623,plant Shutdown Commenced Due to Increased RCS Leakage.Caused by Fatigue in Vent Line on Reactor Coolant Pump C Seal Pressure Sensing Line.Plant Heatup Expected to Begin on 890626 + (05:29:50, 2 December 2024)
- ML20246A767 + (05:29:51, 2 December 2024)
- ML20246A766 + (05:29:52, 2 December 2024)
- ML20246A762 + (05:29:54, 2 December 2024)
- PNO-IV-89-041, on 890623,licensee Synchronized Main Generator to Grid,Completing 101 Day Outage.Refueling Outage Consisted of Replacing Approx One Third of Fuel Elements in Core & Repairs to Svc Water Sys Due to Failed Transformer + (05:29:54, 2 December 2024)
- CEO-89-198, Responds to NRC Re Violations Noted in Insp Rept 50-312/89-04.Corrective Actions:Procedures Revised to Remove Inconsistencies & Provide Clear Guidance on When Drawing Change Package Required + (05:29:55, 2 December 2024)
- ML20246A756 + (05:29:56, 2 December 2024)
- ML20246A749 + (05:29:57, 2 December 2024)