Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247G763 + (01:34:44, 2 December 2024)
- ML20247G760 + (01:34:45, 2 December 2024)
- ML20247G759 + (01:34:46, 2 December 2024)
- IR 05000413/1989024 + (01:34:46, 2 December 2024)
- ML20247G757 + (01:34:48, 2 December 2024)
- ML20247G756 + (01:34:49, 2 December 2024)
- ML20247G751 + (01:34:50, 2 December 2024)
- ML20247G753 + (01:34:50, 2 December 2024)
- ML20247G743 + (01:34:55, 2 December 2024)
- ML20247G744 + (01:34:55, 2 December 2024)
- ML20247G741 + (01:34:56, 2 December 2024)
- ML20247G742 + (01:34:56, 2 December 2024)
- ML20247G734 + (01:34:57, 2 December 2024)
- ML20247G731 + (01:34:59, 2 December 2024)
- 05000414/LER-1988-018, :on 880427,feedwater Isolation Occurred While Cycling Steam Generator power-operated Relief Valve.Caused by Receipt of 2 Out of 4 Channels Indicating Hi Hi Level. Affected Valves Realigned + (01:35:03, 2 December 2024)
- TXX-8924, Affirms & Certifies That Tech Specs Accurately Reflect as-built Plant & FSAR Per .Exceptions Listed, Including Accident Monitoring Instrumentation + (01:35:05, 2 December 2024)
- ML20247G721 + (01:35:06, 2 December 2024)
- ML20247G720 + (01:35:06, 2 December 2024)
- PNO-I-89-079, on 890911,unplanned Reactor Shutdown for Greater than 48 H Due to Problems W/Emergency Diesel Generator.Drywell Entered,Leaking Feedwater Check Valve Repaired & Minor Maint Performed + (01:35:08, 2 December 2024)
- ML20247G719 + (01:35:08, 2 December 2024)
- ML20247G715 + (01:35:09, 2 December 2024)
- NRC-89-0100, Forwards Preliminary Final Decommissioning Plan for Plant, Per P Erickson 890222 Request + (01:35:10, 2 December 2024)
- AECM-89-0164, Forwards Results of Liquid Samples Received on 890717 for Concentrations of tritium,Sr-89,Sr-90 & Fe-55,in Response to 890613 Request + (01:35:11, 2 December 2024)
- ML20247G710 + (01:35:12, 2 December 2024)
- 05000336/LER-1988-006, :on 880218,local Leak Rate Testing Determined Combined Bypass Leakage Exceeded Tech Spec 3.6.1.2.C Limit. Caused by Debris Being Lodged in Seat Area of Valve.Duplex Strainer Installed in Piping Sys + (01:35:17, 2 December 2024)
- 05000325/LER-1998-001-02, :on 980416,RB Roof Vent Ng Activity Monitor Surveillance Deficiency Was Noted.Caused by Procedure Deficiency.Counseled Individuals Responsible for Development of Defective Procedure + (01:35:20, 2 December 2024)
- ML20247G705 + (01:35:21, 2 December 2024)
- ML20247G704 + (01:35:21, 2 December 2024)
- ML20247G703 + (01:35:22, 2 December 2024)
- ML20247G694 + (01:35:32, 2 December 2024)
- ML20247G693 + (01:35:33, 2 December 2024)
- B13174, Annual Radioactive Effluents Dose Rept 1988 + (01:35:34, 2 December 2024)
- ML20247G690 + (01:35:34, 2 December 2024)
- ML20247G688 + (01:35:35, 2 December 2024)
- ML20247G686 + (01:35:36, 2 December 2024)
- ML20247G684 + (01:35:37, 2 December 2024)
- ML20247G679 + (01:35:38, 2 December 2024)
- ML20247G681 + (01:35:38, 2 December 2024)
- ML20247G677 + (01:35:39, 2 December 2024)
- ML20247G678 + (01:35:39, 2 December 2024)
- ML20247G674 + (01:35:40, 2 December 2024)
- ML20247G672 + (01:35:40, 2 December 2024)
- ML20247G668 + (01:35:41, 2 December 2024)
- B16186, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time + (01:35:42, 2 December 2024)
- ML20247G665 + (01:35:42, 2 December 2024)
- ML20247G661 + (01:35:43, 2 December 2024)
- IR 05000445/1989024 + (01:35:52, 2 December 2024)
- ML20247G655 + (01:35:53, 2 December 2024)
- ML20247G657 + (01:35:53, 2 December 2024)
- ML20247G654 + (01:35:54, 2 December 2024)
- HL-5630, Ei Hatch Nuclear Plant Radiological Environ Operating Rept for 1997 + (01:35:55, 2 December 2024)
- ML20247G652 + (01:35:55, 2 December 2024)