'At, tach ;nt 2 to TXX-89693

~

iS;ptember:15, 1989

CPSES.TRM REVISION.1

}Paga1,'of3 DETAILED DESCRIPTION TRM-Page tas' amended)

Group Description Table 1.4.1. 1.4.2 3

See Sheet No(s):1-17 & 1-18

. Adds control room. indication to " Seismic Trigger-Fuel 4"

. Building,"

Correction:

" Seismic Trigger-Fuel Building" also has control room indication.

TRM Change Request Number: TR-89-6 Related'SER Section: 3.7.4 SER/SSER Impact: No

.l Table 4.1.1-4 See Page No(s): 4-8 Corrects title and associated breakers for relays.

l Correction:

Corrects transpositional error on page 4-8 by moving associated circuit breaker (s) shown in parentheses and 62X relay from "Long Time Delay Relay" to " Time Delay Relays". Adds "and Instantaneous" to title, since'the 62X relay does not have a time delay in this application.

TRM Change Request Number: TR-89-5.1 Related SER Section:

8. 4.1 SER/SSER Impact: No Table 4.1.1 3

See Page No(s): 4-14 Deletes details on surveillance test settings for

. breakers on panelboards for pressurizer heaters.

Revision:

Deletes excess details on surveillance test settings for these breakers from table. These details are appropriately covered in the surveillance procedure.

TRM Change Request Number: TR-89-5.2 Related SER Section: 8.4.1 SER/SSER Impact: No l

' Table 4.1.1 4

See Page No(s): 4-17 Clarifies XD2-3 CKT 17 by revising nomenclature to TBX-WPX1LP-01 for 125V DC Control Power.

Clarification:

Panelboard No. TBX-WPX1LP-01, circuit no. Main (LBK3) is a clearer description of XD2-3 CKT 17.

XD2-3 CKT 17 is deleted and TBX-WPX1LP-01 is added to list. This circuit has fuse-breaker protection and is added based l

on the latest revision to the design calculation and as-built plant.

TRM Change Request Number: TR-89-5.3 Related SER Section: 8.4.1 SER/SSER Impact: No 8909190126 890915 PDR ADOCK 0500044b_

A FDC j

s Attach 2:nt 2-to TXX-89693 CPSES TRH REVISION 1 5:ptorber 15. 1989 DETAILED DESCRIPTION Pago 2 of.'3

'TRM-Page

(as amended)

Group Description Table 4.1.1 3

See Page No(s): 4-17 Deletes 118V AC Instrument Distribution Panel Board' 1C3-3 and adds 120V AC Control Power from Isolation Transformers TXEC3 and TXEC4 as new item 7.

Revision:

118V AC Instrument Panel Board IC3-3 is deleted since it has no containment penetration circuits based on latest revision to the design calculation and.cs-built plant. Adds 120V AC Control Power _ for Isolation Transformers TXEC3 and TXEC4 since they have penetration circuits and use breaker as part of protection based on the latest revision to the' design calculation and as-built plant.

TRH Change Request Number: TR-89-5.4 Related SER Section: 8.4.1 SER/SSER Impact: No Table 4.1.1 3

See Page No(s): 4-17 & 4-18 Deletes 1C3 CKT 14 and IPC2-1 CKT 4 from item 9 and XEC4 CKT 3 from item 10.

Revision:

IC3 Circuit 14, IPC2-l' Circuit 4 and XEC4 Circuit 3 are deleted as they either use fuses for both primary and backup protection or have no containment penetration circuits based on the latest revision to the design calculation, approved design changes and the as-built plant.

TRH Change Request Number: TR-89-5.5 Related SER Section: 8.4.1 SER/SSER Impact: No Table 4.1.1 3

See Page No(s): 4-18 & 4-19 Adds item 12. " Containment Door Position Limit i

Switches", and item 13 " Fire Protection System".

Addition:

Adds item 12, " Containment Door Position Limit Switches", and item 13. " Fire Protection System",

consistent with FSAR Amendment 77 and latest revision i

of design calculation and as-built plant.

TRM Change Request Number: TR-89-5.6 Related SER Section: 8.4.1 SER/SSER Impact: No Change conforms TRM to information provided in FSAR Amendment 77 and advance letter TXX-89637 dated August 31, 1989, which is under review by NRC.

Table 4.1.1 3

See Page No(s): 4-18 Corrects Emergency Evacuation System Lights Power j

breaker panelboard and circuit numbers.

I i

I

,. _ _ -,,. _ _ -, - - - - - - -, -, - - - - ' - - - - - - ~ - " - - ~ ' ' - ~ ' ' - -

p<

I dttach2ent'2'to TXX-89693: CPSES-TRM REVIS' ION 1-Srptember 15, 1989 DETAILED. DESCRIPTION

/ :Page :3 of 3 ~

u TRM' 'Page (as amended)

Group Description Correction:

Corrects panelboard and circuit numbers for breaker-I' used for' protection for Emergency Evacuation System Warning Lights from XEC3 CKT 3 to XEC3-3 CKTs 9 and 10 based on the latest revision to the design calculation

~

.and as-built plant.

TRM Change Request Number:.TR 89-5,7 Related SER Section: 8,4.1 SER/SSER Impact: No l+

l

CPSES/TRM

(

)

COMANCHE PEAK STEAM ELECTRIC STATION TECHNICAL' REQUIREMENTS MANUAL' INSTRUCTION SHEET The following instructional-information and' check list is to assist in the insertion of Revision 1 into the Comanche Peak Steam Electric Station Technical Requirements Manual. A description for this revision is provided in TXX-89693 dated September 15, 1989.

Discard the old sheets and insert the new sheets, as listed below.

Insert this instruction sheet at the end of the Technical Requirements Manual to serve as a record of changes.

Remove' Insert Section 1 1-3 1-3 1-17 1-17 1 1-18 Section 4 4-8 4-8 4-14 4-14 4-15 4-15 4 17 4-17 thru 4-18 4-19 O

Page 1 of I L__-_____________-__--_______--__-____-____-_-_

TECHNICAL REQUIREMENT 1.1 Table 1.1.1 REACTOR FRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME 1.

Manual Reactor Trip N.A.

2.

Power Range, Neutron Flux' 1 0.5 second*

3.

Power Range', Neutron Flux High Positive Rate N.A.

4.

Power. Range, Neutron Flux High Negative Rate 1 0.5 second*

5.

Intermediate Range, Neutron Flux N.A.

6.

' Source Range, Neutron Flux 1 0.5 second*

7.

Overtemperature N-16 i 7 seconds *#

8.

Overpower N-16 1 7 seconds *#

9.

Pressurizer Pressure-Low 1 2 seconds

't

10. Pressurizer-Pressure-High 1 2 seconds
11. Pressurizer Water Level-High N.A.
  • Neutron / gamma detectors are exempt from response time testing.

Response time of the neutron / gamma flux signal portion of the channel shall be measured from detector output or input of first electronic

component in a channel.
  1. Response time includes the thermal well response time.

COMANCHE PEAK - UNIT 1 1-3 SEPTEMBER 15,1989

o.

n

TECHNICAL RE0VIREMENT 1.4 (continued).

TABLE 1.4.1

.pl SEISMIC MONITORING INSTRUMENTATION MINIMUM INSTRUMENTS INSTRUMENTS AND SENSOR LOCATIONS OPERABLE

'1 Triaxial Time-History Accelerographs a.

Accelerometer-Fuel Building 1

b.. Accelerometer-Containment I

c.

Accelerometer-Electrical Manhole 1

d.

Seismic Trigger-Fuel Building 1*

1 e.

Recorder Unit. SMA-3 1

f.

Playback. Unit, SMP-1 1

2.

Triaxial Peak Accelerographs 5

a.

Pressurizer Lifting Trunion 1

b.

React r Coolant Piping I

c.

CCW Heat Exchanger 1

3. Triaxial Seismic Switch Fuel Building 1*
4. Triaxial Response-Spectrum Recorders a.

Fuel Building 1

b.

Reactor Bldg. Internal Structure 1

I-c.

Safeguards Building 1

5. Response Spectrum Annunciator 1*

l

  • With control room indication.

O COMANCHE PEAK - UNIT 1 1-17 REVISION 1 SEPTEMBER 15,1989 r : \\. /

i.

TECHNICAL REQUIREMENT 1.4 (continued) 1 l

TABLE 1.4.2 l

SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS ANALOG

  • I CHANNEL CHANNEL CHANNEL OPERATIONAL INSTRUMENTS AND SENSOR LOCATIONS CHECK CALIBRATION TEST 1.

Triaxial-Time-History l.

Accelerographs

.s.

a.

Accelerometer-Fuel Building M

R SA b.

Accelerometer-Contain-ment M

'R SA c.

Accelerometer-Elec-trical Manhole

.M R

SA

'd.

Seismic Trigger-Fuel Building **

M R

SA 1

e.

Recorder Unit, SHA-3 M

R SA f.

Playback Unit, SMP-1 M

R SA 2.

Triaxial Peak Accelerographs a.

Pressurizer Lifting Trunion N.A.

R N.A.

b.

Reactor Coolant' Piping N.A.

R N.A.

c.

CCW Heat Exchanger N.A.

R N.A.

3.

Triaxial Seismic Switch fuel Building **

M R

SA

  • Setpoint verification is not applicable.
    • With control room indication.

COMANCHE PEAK - UNIT 1 1-18 REVISION 1 SEPTEMBER 15,1989

, +

1 TECHNICAL REQUIREMENT 4.1 (continued)

/ ~N~

TABLE 4.1.1 (Continued) kY '

CONTAINMENT PENETRATION CONDUCTOR QyERCURRENT PROTECTIVE DEVICES DEVICE NUMBER SYSTEM-AND LOCATION POWERED

- 2.2 - Device Location - 480V Containment Switchgear IEB4 Polar Crane a.

' Primary Breaker - ISCCPI b.

Backup Breaker'IEB4-1 and-BT-1EB24

1) Lp,no Time Delay Relay 1

51 1

ISCCPI 1

2) Time Delay and Instantaneous' Relays
  • 1 62 (IEB4-1 and 62X (ISCCPI) 1 ISCCP1 BT-1EB24) 1SCCP1 1

3.

480VAC from Motor Control Centers r\\

3.1 Device Location

- HCC 1EB1-2 Containment Numbers

( _,f listed below.

Primary and Backup

- Both primary and backup breakers Breakers have identical trip ratings and are in the same MCC Compt. These breakers are General Electric type THED or THFK with thermal-magnetic. trip elements.

I l

Associated circuit breaker (s) shown in parentheses: e.g. 1EB4-1 and BT-1EB24 are backup breakers for ISCCPl.

COMANCHE PEAK - UNIT 1 4-8 REVISION 1 SEPTEMBER 15,1989

' 9 e

TECHNICAL RE0VIREMENT'4.1'(continued)

' /}

TABLE 4.1.1 (Continued)

NJ CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER SYSTEM AND LOCATION POWERED 4.

480VAC From Pane 1 boards For Pressurizer Pressurizer Heaters Heaters-(1) groups A,B, & D i

a.

Primary Breakers - General Electric Type TJJ Thermal Magnetic breakers.

Breaker No. & Location - Ckt. Nos. 2 thru 4 of Pane 1 boards IEB2-2, IEB3-2, IEB4-1, IEB4-2 and Ckt. Nos. 2 thru 5 of Pane 1 boards 1EB2-1 and IEB3-1.

b.

Backup Breakers - General Electric Type THJS with longtime and insts. solid state trip devices with 400 Amp sensor.

f-~-

Breaker No. & Lccation - Ckt. No. 1 of Pane 1 boards IEB2-1, t

IEB2-2, IEB3-1, IEB3-2, 1EB4-1 and IEB4-2.

I (2) group C a.

Primary Breakers - General Electric Type THED breakers.

Breaker No, and Location - For both IEB1-1 & IEB1-2 are located at Ckt. Nos. 2 thru 4.

b.

Backup Breakers - General Electric Type TJJ. Thermal Magnetic breakers.

Breaker No. and Location - Ckt No. 1 of Switch-boards 1EB1-1 & IEB1-2.

5.

120V Space Heater Circuits Containment Recirc.

from 480V Switchgears Fan and CRDM Vent.

Fan Motor Space Heaters

)

COMANCHE PEAK - UNIT 1 4-14 FtEVISIC>N 1 SEPTEMBER 15,1989 i

J

e 7

N TECHNICAL RE00IREMENT 4.1 (continued) l

(

TABLE 4.1.1 (Continued)

. CONTAINMENT PENETRATION CONDUCTOR OVERCVRRENT PROTECTIVE DEVICES tv

5. 120V Space Heater Circuits from 480V Switchgears (Continued) a.

Primary Breakers BKR. LOCATION WESTINGHOUSE

& NUMBER

.BKR. TYPE

.Swgr. 1EB1, EB1010 Cubicle.3B

' CPI-VAFNAV-01 Space. Heater Bkr.

Swgr. IEB2,.

EB1010 Cubicle,3B CP1-VAFNAV-02 Space Heater Bkr.

Swgr. IEB3, EB1010 Cubicle 9B CP1-VAFNAV-03 Space Heater Bkr.

Swgr. IEB4, EB1010 Cubicle.9B CP1-VAFNAV-04 Space Heater Bkr.

Swgr. 1EB3, EB1010 Cubicle 88, CP1-VAFNCB-01 Space Heater Bkr.

Swgr. IEB4, EB1010 Cubicle 88, i

l CPI-VAFNCB-02 Space Heater Bkr.

l O

COMANCHE PEAK - UNIT 1 4-15 SEPTEMBER 15,1989

\\

TECHNICAL' REQUIREMENT 4.1 (continued) h=

-TABLE 4.1.1 (Continued)

[9NTAINMENT PENETRATION CONDUCTOR

.0VERCURRENT PROTECTIVE DEVICES

- DEVICE NUMBER SYSTEM AND LOCATION POWERED 6.

125V.DC Control Power Various-a.

Primary Devices - N/A (Fuse) b.

Backup Breakers GENERAL ELECTRIC PANELBOARD NO.

CKT. NO.

BREAKER TYPE XED1-1 1,6 TED XED2-1 1,3,6 TED l1 XD2-3 8

TED IED2-1 14,17 TED IED1-1 14.17 TED 102-3 7,10 TED 102-2 9

TED 1ED2-2 12 TED O~

IED3-1 5

TED 1EDI-2 7,8 TED TBX-WPX1LP-01 Main (LBK3).

FB(Westinghouse) l1 7.

120 V AC Control Power from Isolation XFMR TXEC3 & TXEC4 l1 a.

Prir;ary Devices - N/A (Fuse)

I b.

Backup Breaker - Square D Type 01L located in 1

Miscellaneous Signal Control Cabinet.

1 8.

120V AC Power for Personnel and Emergency Airlocks a.

Primary Devices - N/A (Fuse) b.

Backup Breakers GENERAL ELECTRIC PANELB0ARD NO.

CKT. NO.

BREAKER TYPE XEC2 34 TED XECl-2 2

TED O

COMANCHE PEAK - UNIT 1 4-17 REVISION 1 SEPTEMBER 15,1989

~

TECHNICAL REQUIREMENT 4.1 (continued) 7-k TABLE 4.1.1 (Continued)

CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES DEVICE NUMBER AND LOCATION 9.

118V AC Control Power a.

Primary Devices - N/A (Fuse) b.

Backup Breakers-

. GENERAL ELECTRIC PANELBOARD NO.

CKT. NO.

BREAKER TYPE 102 22 TED 1

1PCI 10.13 TED IPC4 6,10 TED

'1EC1 4,7 TED 1EC2 4,7 TED 1ECS 8

TED 1EC6 3,8 TED 1

10. Emergency Evacuation System Warning Lights Power a.

Primary Devices - N/A (Fuse) b.

Backup Breakers SQUARE D PANELBOARD N0.

CKT. NO.

BREAKER TYPE XEC3-3 9, 10 FAL-12020 1

1

11. DRPI Data Cabinet Power Supplies a.

Primary Devices - N/A (Fuse) b.

Backup Breakers i

SOUARE D PANELBOARD NO.

CKT. N0 BREAKER TYPE t

1C14 1,2 FA-14050A l

12. Containment Door Position Limit Switches 1

i l

1 l

Primary Breaker - Wood Electric Corp. single pole breaker.

1 a.

l Breaker No. & location - 285M in Breaker Panel B in Computer 1

Cabinet 02 (TBX-PCC0CP-03).

)

Backup Device - N/A (48 VDC current limiting power supply) 1 b.

COMANCHE PEAK - UNIT 1 4-18 REVISION 1 SEPTEMBER 15,1989

t; TECHNICAL REQUIREMENT 4.1 (continued) t TABLE 4.1.1'(Continued)-

CONTAINMENT PENETRATION CONDUCT 0_B OVERCURRENT PROTECTIVE DEVICES l

DEVICE NUMBER AND LOCATION

13. Fire Detection System-1 a.

Primary. Devices - N/A (Fuse) 1 l

~

l

b.. Backup Breaker - Potter Brumfield single pole breaker.

1 Breaker No. & Location - circuit breaker CB2 in DC power l'

supply'in Fire Protection Panel CPI-EIPRLV-28A.

i o

1 l

i i

1 I

i l

)

O 4-19 COMANCHE PEAK - UNIT 1 REVISION 1 SEPTEMBER 15,1989