Forwards Rev 26,changes 1 & 2 to EPIP EP-002-100, Technical Support Ctr (TSC) Activation,Operation & Deactivation. Change Reviewed IAW 10CFR50.54 Requirements & Determined Not to Decrease Effectiveness of Emergency Plan
ML20247G654
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/14/1998
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247G658 List:
References
W3F1-98-0087, W3F1-98-87, NUDOCS 9805200315
Download: ML20247G654 (2)


Text

- - _ - _ _ _ _ _ _ _ _ - _ - _ - - _ _ _ _ _ _ _ - _ _ - _ - _ - _ _

l 1 -

=Entergy Entergy Oper tions,Inc.

x1_

Tel 504 739 6242 Early C. Ewing, Ill l Director Nu ar Safety & Regulatory Affairs W3F1-98-0087 A4.05 PR May 14,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Emergency Plan Implementing Procedure Gentlemen:

Enclosed is the latest issue of one recently changed Waterford 3 Emergency Plan implementing Procedure. This submittalis being made in accordance with Appendix E of 10CFR50. This change was reviewed in accordance with 10CFR50.54 requirements and was determined not to decrease the effectiveness of the emergency plan.

Included in this submittal is the following procedure:

1. EP-002-100 (Revision 26, Change 2), Technical Support Center (TSC)

Activation, Operation and Deactivation - This change does not alter the Emergency Plan. It allows for closure of Safety injection System Sump Isolation Valves SI-602A(B) in the event closure is required to prevent leakage from Emergency Cooling Systems.

This is an interim change and will be removed from this procedure and incorporated into an Emergency Operating Procedure (EOP). EOPs are i currently undergoing extensive revisions to meet the guidance of CEN-152, J Combustion Engineering Emergency Procedure Guidelines. Plans are to have this incorporated in the EOP by June 30,1998. i i

1

,m 9805200315 98b514 PDR F

ADOCK 05000382 PDR

\\g

\

\f

i

)

i Emergency Plan implementing Procedure l W3F1-98'-0087 l Page 2 May 14,1998  ;

Should you have any questions concerning this procedure, please contact J.J. Lewis, Emergency Planning Manager, at (504) 739-6624.

Very truly yours, i

r '

l

/

E.C. bwing Director Nuclear Safety & Regulatory AWairs ECFJGCS/rtk Enclosure cc: (w/ Enclosure)

E.W. Merschoff, NRC Region IV (2 copies)

(w/o Enclosure)

C.P. Patel (NRC-NRR)

G.M. Good (NRC Region IV)

J. Smith N.S. Reynolds NRC Resident inspectors Office I

_ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ - .___ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ ___-______ -_______ _ _____________________