Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247R409 + (00:04:05, 2 December 2024)
- ML20247R408 + (00:04:05, 2 December 2024)
- ML20247R407 + (00:04:06, 2 December 2024)
- ML20247R402 + (00:04:07, 2 December 2024)
- ML20247R403 + (00:04:07, 2 December 2024)
- ML20247R400 + (00:04:08, 2 December 2024)
- ML20247R394 + (00:04:09, 2 December 2024)
- RBG-31314, Responds to Violations Noted in Insp Rept 50-458/89-24. Corrective Actions:Operations Personnel Secured Div II Standby Svc Water Sys to Isolate Leak & Reactor Protection Sys Power Supply Transferred to Alternate Power Supply + (00:04:09, 2 December 2024)
- ML20247R389 + (00:04:10, 2 December 2024)
- ML20247R387 + (00:04:11, 2 December 2024)
- ML20247R388 + (00:04:11, 2 December 2024)
- ML20247R385 + (00:04:12, 2 December 2024)
- ML20247R383 + (00:04:12, 2 December 2024)
- ML20247R382 + (00:04:13, 2 December 2024)
- ML20247R381 + (00:04:14, 2 December 2024)
- ML20247R378 + (00:04:15, 2 December 2024)
- ML20247R375 + (00:04:16, 2 December 2024)
- ML20247R374 + (00:04:16, 2 December 2024)
- ML20247R371 + (00:04:17, 2 December 2024)
- ML20247R370 + (00:04:18, 2 December 2024)
- ML20247R369 + (00:04:19, 2 December 2024)
- ML20247R368 + (00:04:23, 2 December 2024)
- ML20247R367 + (00:04:23, 2 December 2024)
- 05000302/LER-1989-009, Submits Justification for Restart of Plant as Committed to in LER 89-009.Based on Test & Insp Data,Util Has Determined That Continued Operation W/Existing DHR Pumps Will Not Pose Unresolved Safety Concerns + (00:04:25, 2 December 2024)
- ML20247R358 + (00:04:26, 2 December 2024)
- ML20247R360 + (00:04:26, 2 December 2024)
- ML20247R356 + (00:04:27, 2 December 2024)
- ML20247R357 + (00:04:27, 2 December 2024)
- IR 05000445/1989035 + (00:04:28, 2 December 2024)
- ML20247R353 + (00:04:29, 2 December 2024)
- IR 05000298/1989020 + (00:04:30, 2 December 2024)
- ML20247R343 + (00:04:31, 2 December 2024)
- ML20247R346 + (00:04:31, 2 December 2024)
- ML20247R340 + (00:04:32, 2 December 2024)
- ML20247R339 + (00:04:33, 2 December 2024)
- ML20247R338 + (00:04:34, 2 December 2024)
- ML20247R337 + (00:04:34, 2 December 2024)
- ML20247R336 + (00:04:35, 2 December 2024)
- ML20247R333 + (00:04:35, 2 December 2024)
- ML20247R332 + (00:04:36, 2 December 2024)
- ML20247R331 + (00:04:37, 2 December 2024)
- ML20247R329 + (00:04:37, 2 December 2024)
- IR 05000498/1989037 + (00:04:39, 2 December 2024)
- ML20247R325 + (00:04:43, 2 December 2024)
- 05000413/LER-1989-007, :on 890127,turbine Driven Auxiliary Feedwater Pump Failed.Caused by Stress Corrosion Cracking at Key Slot of Final Stage Shaft Sleeve.Shaft Replaced & Feedwater Pump Returned to Svc + (00:04:49, 2 December 2024)
- ML20247R323 + (00:04:50, 2 December 2024)
- 05000368/LER-1989-003-01, :on 890216,personnel Determined That Valve Associated W/Train a Hydrogen Analyzer Exceeded Environ Qualification Parts Replacement Interval Since 1983.Caused by Personnel Error.Components Replaced + (00:04:52, 2 December 2024)
- ML20247R321 + (00:04:52, 2 December 2024)
- ML20247R320 + (00:04:53, 2 December 2024)
- 0CAN058909, Requests 30 Day Extension to Respond to 890424 Notice of Violation & Proposed Imposition of Civil Penalty Re Certain Environ Qualification Activities + (00:04:54, 2 December 2024)
- ML20247R319 + (00:04:54, 2 December 2024)
- 05000260/LER-1989-020, :on 890702,logic Circuit Deenergized During Replacement of Fuse Resulting in Isolation of Reactor Zone Ventilation.Caused by Electricians Incorrectly Jumpering Fuse Prior to Removal.Instruction Revised + (00:04:56, 2 December 2024)