Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043B540 + (21:16:48, 19 December 2024)
- ML20043B539 + (21:16:48, 19 December 2024)
- B13520, Proposed Tech Specs Supporting Cycle 16 Operation + (21:16:51, 19 December 2024)
- ML20043B535 + (21:16:53, 19 December 2024)
- ML20043B534 + (21:16:54, 19 December 2024)
- ML20043B530 + (21:16:56, 19 December 2024)
- ML20043B528 + (21:16:56, 19 December 2024)
- ML20043B527 + (21:16:58, 19 December 2024)
- ML20043B524 + (21:16:59, 19 December 2024)
- ML20043B523 + (21:17:00, 19 December 2024)
- ML20043B522 + (21:17:01, 19 December 2024)
- ML20043B521 + (21:17:03, 19 December 2024)
- ML20043B518 + (21:17:07, 19 December 2024)
- 05000412/LER-1990-004-01, :on 900423,inadvertent ESF Actuation Occurred During Safeguards Protection Sys Testing.Caused by Personnel Closing Breaker Before Resetting Safety Injection Sys Signal.Signal Reset + (21:17:08, 19 December 2024)
- ML20043B516 + (21:17:10, 19 December 2024)
- 05000295/LER-1990-010, :on 900423,radiation Monitor 1RIA-PR49 Taken Out for Svc for More than 30 Days to Repair Problem W/ Blower.Caused by Ineffective Tracking of Time Clocks & Work Load Due to Forced Outage.Tracking Improved + (21:17:12, 19 December 2024)
- IR 05000373/1990004 + (21:17:29, 19 December 2024)
- ML20043B512 + (21:17:31, 19 December 2024)
- ML20043B511 + (21:17:32, 19 December 2024)
- ML20043B509 + (21:17:34, 19 December 2024)
- TAC:75735 + (21:17:35, 19 December 2024)
- ML20043B508 + (21:17:35, 19 December 2024)
- ML20043B507 + (21:17:36, 19 December 2024)
- LIC-90-0435, Advises That Testing to Verify Operability of Hydrogen Purge Sys Successfully Completed During 1990 Refueling Outage.Proposed Tech Spec Rev Will Be Submitted by 900701 + (21:17:37, 19 December 2024)
- ML20043B505 + (21:17:39, 19 December 2024)
- ML20043B504 + (21:17:41, 19 December 2024)
- 2CAN059003, Application for Amend to License NPF-6,revising Tech Spec 3/4.8.2 Re Voltage Correction for Average Electrolyte Temp in Station Batteries & Clarifying That Equalizing Charge Based Simply on Actual Cell Voltage Measurements + (21:17:42, 19 December 2024)
- ML20043B503 + (21:17:42, 19 December 2024)
- ML20043B499 + (21:17:46, 19 December 2024)
- LIC-90-0418, Updates Schedule for Submitting Results of PORV Block Valve Prototype Testing.Establishment of Test Parameters & Development of Test Procedures Tentatively Scheduled for Submittal in Nov 1990.Final Rept Expected by 910630 + (21:17:47, 19 December 2024)
- ML20043B497 + (21:17:49, 19 December 2024)
- ML20043B496 + (21:17:50, 19 December 2024)
- ML20043B495 + (21:17:53, 19 December 2024)
- ML20043B493 + (21:17:55, 19 December 2024)
- ML20043B491 + (21:17:55, 19 December 2024)
- ML20043B490 + (21:17:59, 19 December 2024)
- U-601667, Informs NRC of Plant Initiatives for 1990 to Improve Corrective Action Program Effectiveness,In Response to SALP Rept & Violations Noted in Insp Rept 50-461/89-32. Centralized Commitment Tracking Sys Upgraded + (21:18:00, 19 December 2024)
- IR 05000382/1990007 + (21:18:07, 19 December 2024)
- ML20043B487 + (21:18:08, 19 December 2024)
- ML20043B486 + (21:18:09, 19 December 2024)
- TAC:74271 + (21:18:09, 19 December 2024)
- TAC:56179 + (21:18:11, 19 December 2024)
- ML20043B485 + (21:18:11, 19 December 2024)
- ML20043B482 + (21:18:12, 19 December 2024)
- IR 05000498/1989039 + (21:18:14, 19 December 2024)
- TAC:71676 + (21:18:15, 19 December 2024)
- ML20043B479 + (21:18:17, 19 December 2024)
- ML20043B478 + (21:18:18, 19 December 2024)
- ML20043B477 + (21:18:19, 19 December 2024)
- IR 05000155/1990008 + (21:18:23, 19 December 2024)
- B13524, Provides Revised Schedule for Conversion of Plant to Zircaloy Clad Fuel.Schedule Extended Due to Removal of Reactor Vessel Thermal Shield During Current Refueling Outage Resulting in Need to Change large-break LOCA Model + (21:18:24, 19 December 2024)