Notice of Violation from Insp on 900326-30 & 0507.Violation Noted:Fire Pump Not Retested to Verify That Pump Could Develop 2,500 Gpm at 135 Psig
ML20043B511
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/23/1990
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20043B510 List:
References
50-373-90-04, 50-373-90-4, 50-374-90-04, 50-374-90-4, NUDOCS 9005300129
Download: ML20043B511 (1)


Text

'

~

y w.m pg. m ',m, m,,

p w e.3; :.m

^ r g

yh5-

. NOTICE OFJV10LAT10NL gf uw h OF HCommonwealth: Edison Company 1_

-Docket Nos. 50-373;<50-374 p,s JLaSalle NuclearfPower Station

-License.Hos.NPF-11_;(NPF-18, mm-

egg, p4

- M;Astairesult-ofithe inspectionLconducted on_ March 261through-30 fand May)7,'1990,.

and. in accordance" with
.thei" General-Statement of Policy -and: Procedure for HRC:
Enforcement. Actions" J10 CFR Part:2,7 ppendix C:(1989) (EnforcementiPolicy)Lthei A

b(

= ifollowing=_ violation wasiidentified:

D E

M_, Condition No./ 25fofiFacility Operating License NPF-111:.(Unit 1)Jand. Condition-h No..15 of; Facility; Operating License-NPF-18' (Unit 2) requires Commonwealth 4

'Edisun Company to maintain sin eff ect all Lprovisions of the approved -fire :

c p

protection program for LaSalle? Units l'and 2..

7k

/As' part Lof the approved f; ire protection program, Commonwealth Edison CompanyL l Program = -committed totincludelfire; protection in Section 10 of the Quality. Assurance k

?

A e

u rE b

Section?10?ofLthe Quality Assurance Manual, P.evision 57, entitled J" Inspection"',

a crequiresfa' reinspection and retest;to _ the extent necessary to. establ;ish-pb acceptability to,the originalicriteria,following repairs-or corrective actions.

z I

'i Cont'raryLtothe;above/on' August ~ 22, 1987, after correctiveiacti.ons were

accomplished tolimprove;the performance of.the "B" diesel fire pump
the fire-pump:wasinot retested to-verify: that thelpuinp could? develops 2,500tgpmf at::135 psig? ast required Lbyttne station (fire ipump. surveillance 1 procedure. The pump-0:-

ihad failed: testing:on" August 313,'1987, due-to an improperly functioning

$e#

Trelief valve. ?Thicorretive ictions m sistdd of-replacing the. reliefivalve?

Ei" tThislisl a : Severity: Level > IV violetioni (Supplement- -1).

m

Thelinspection
showed ;thati steps had been taken to correct 'the identified z (violation and:to. prevent-recurrence. Consequently, no reply to'ther violationsis; required and we have.no further questi(nis regardinglthis; Cmatter.-

~

L

\\~

4 W

I g

7,

['

iDated:

tlarik A.. Ring, @4ef Engineering Branch q