Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000285/1993006 + (16:40:39, 19 December 2024)
- ML20045D429 + (16:40:48, 19 December 2024)
- IR 05000213/1992080 + (16:40:55, 19 December 2024)
- ML20045D427 + (16:40:56, 19 December 2024)
- IR 05000293/1993010 + (16:41:01, 19 December 2024)
- IR 05000482/1993016 + (16:41:03, 19 December 2024)
- ML20045D418 + (16:41:06, 19 December 2024)
- ML20045D419 + (16:41:06, 19 December 2024)
- ML20045D417 + (16:41:07, 19 December 2024)
- ML20045D415 + (16:41:08, 19 December 2024)
- ML20045D414 + (16:41:09, 19 December 2024)
- ML20045D413 + (16:41:10, 19 December 2024)
- ML20045D411 + (16:41:12, 19 December 2024)
- ML20045D404 + (16:41:13, 19 December 2024)
- ML20045D403 + (16:41:14, 19 December 2024)
- ML20045D402 + (16:41:15, 19 December 2024)
- PY-CEI-NRR-1670, Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change Number (Tcn) TCN-1 to Rev 8 to Section II,TCN-1 to Rev 1 to Section IV & TCN-1 to Rev 8 Instruction 5 + (16:41:16, 19 December 2024)
- ML20045D399 + (16:41:22, 19 December 2024)
- ML20045D398 + (16:41:23, 19 December 2024)
- ML20045D397 + (16:41:25, 19 December 2024)
- ML20045D396 + (16:41:27, 19 December 2024)
- ML20045D394 + (16:41:28, 19 December 2024)
- 05000352/LER-1993-007-01, :on 930521,primary Containment Isolation Valve Inoperable & TS Action Statement & SR Not Implemented in Required Time.Caused by Personnel Error.Ltr Issued to Personnel Emphasizing Requirement + (16:41:29, 19 December 2024)
- 05000352/LER-1993-007, Forwards LER 93-007-00 Re Failure to Implement TS Action & SR in Required Time Period for Inoperable Primary Containment Isolation Valve + (16:41:32, 19 December 2024)
- ML20045D387 + (16:41:34, 19 December 2024)
- ML20045D386 + (16:41:35, 19 December 2024)
- BSEP-93-0081, Responds to Violations Noted in Insp Repts 50-324/93-20 & 50-325/93-20 on 930413-21.Corrective Actions:Ned Training Program Will Be Revised to Include Procedure Compliance Training for New Ned Personnel by 930709 + (16:41:37, 19 December 2024)
- ML20045D382 + (16:41:39, 19 December 2024)
- ML20045D381 + (16:41:40, 19 December 2024)
- TAC:M86563 + (16:41:40, 19 December 2024)
- ML20045D380 + (16:41:41, 19 December 2024)
- ML20045D379 + (16:41:42, 19 December 2024)
- ML20045D378 + (16:41:43, 19 December 2024)
- 3F0693-10, Forwards Rev 2 to Performance Testing Procedure PT-340, Acceptance Criteria. Procedure Submitted in Response to NRC Request for Voltage Dip Data from Most Recent Integrated Engineered Safeguards Actuation Test + (16:41:44, 19 December 2024)
- ML20045D375 + (16:41:49, 19 December 2024)
- 05000285/LER-1993-008, :on 930520,determined That TS SR Not Satisfied for Stack Flow Indicator,Per Amend 137 Issued on 910307. Caused by Lack of Attention to Detail.Calibr & Functional Test Procedures Developed + (16:41:51, 19 December 2024)
- ML20045D373 + (16:41:52, 19 December 2024)
- ML20045D372 + (16:41:54, 19 December 2024)
- ML20045D371 + (16:41:55, 19 December 2024)
- ML20045D369 + (16:41:56, 19 December 2024)
- 05000443/LER-1993-009, :on 930520,manual Reactor Trip from 100% Power Initiated When MSIV Closed During Quarterly Testing, Resulting in Feedwater & Two Emergency Feedwater Isolations. Caused by Debris in Valves.Valves Replaced + (16:41:58, 19 December 2024)
- ML20045D367 + (16:42:05, 19 December 2024)
- ML20045D364 + (16:42:12, 19 December 2024)
- ML20045D362 + (16:42:18, 19 December 2024)
- ML20045D361 + (16:42:27, 19 December 2024)
- ML20045D359 + (16:42:33, 19 December 2024)
- ML20045D358 + (16:42:34, 19 December 2024)
- ML20045D356 + (16:42:40, 19 December 2024)
- ML20045D355 + (16:42:40, 19 December 2024)
- ML20045D354 + (16:42:41, 19 December 2024)
- ML20045D350 + (16:42:47, 19 December 2024)