Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20052E336 + (12:16:50, 18 December 2024)
- ML20052E333 + (12:16:52, 18 December 2024)
- ML20052E332 + (12:16:53, 18 December 2024)
- ML20052E331 + (12:16:54, 18 December 2024)
- ML20052E330 + (12:16:55, 18 December 2024)
- ML20052E329 + (12:16:56, 18 December 2024)
- ML20052E327 + (12:16:57, 18 December 2024)
- ML20052E325 + (12:16:58, 18 December 2024)
- W3P82-1074, Forwards Public Version of Clarification of D Perrotti 820410 Testimony,Question 10 on Page 11 Re Facility Emergency Plan.Plan Will Be Revised to Reflect That Operational Hotline Will Be Primary Communication W/La + (12:16:59, 18 December 2024)
- ML20052E323 + (12:16:59, 18 December 2024)
- ML20052E320 + (12:17:02, 18 December 2024)
- ML20052E319 + (12:17:03, 18 December 2024)
- ML20052E318 + (12:17:04, 18 December 2024)
- ML20052E316 + (12:17:05, 18 December 2024)
- ML20052E317 + (12:17:05, 18 December 2024)
- ML20052E314 + (12:17:06, 18 December 2024)
- ML20052E313 + (12:17:08, 18 December 2024)
- ML20052E312 + (12:17:09, 18 December 2024)
- ML20052E301 + (12:17:11, 18 December 2024)
- ML20052E300 + (12:17:12, 18 December 2024)
- ML20052E299 + (12:17:13, 18 December 2024)
- ML20052E298 + (12:17:14, 18 December 2024)
- ML20052E292 + (12:17:16, 18 December 2024)
- ML20052E296 + (12:17:16, 18 December 2024)
- ML20052E286 + (12:17:17, 18 December 2024)
- ML20052E285 + (12:17:18, 18 December 2024)
- ML20052E283 + (12:17:19, 18 December 2024)
- ML20052E284 + (12:17:19, 18 December 2024)
- 05000333/LER-1982-017-03, /03L-0:on 820402,MSIV 10% Closure Position Switches on Two Valves Did Not Trip When Tested.Caused by Mechanical Drift of Valve Position Switch Operating Cams. Adjustment Made + (12:17:21, 18 December 2024)
- ML20052E280 + (12:17:25, 18 December 2024)
- 05000333/LER-1982-017, Forwards LER 82-017/03L-0 + (12:17:27, 18 December 2024)
- ML20052E277 + (12:17:29, 18 December 2024)
- 05000318/LER-1982-016-03, /03L-0:on 820402,during Normal Power Operation, Plant Computer Failed,Resulting in Loss of CEA Pulse Counting Sys & Incore Detection Sys.Apparently Caused by Intermittent Signal.Computer Restarted by Bootstrapping + (12:17:31, 18 December 2024)
- ML20052E275 + (12:17:32, 18 December 2024)
- 05000344/LER-1982-005-03, /03L-0:on 820331,failure to Perform Component Cooling Water Valve Cycling at Required Frequency Discovered.Caused by Personnel Error.Schedule Corrected + (12:17:33, 18 December 2024)
- 05000318/LER-1982-016, Forwards LER 82-016/03L-0 + (12:17:35, 18 December 2024)
- 05000344/LER-1982-005, Forwards LER 82-005/03L-0.Detailed Event Analysis Encl + (12:17:37, 18 December 2024)
- ML20052E269 + (12:17:39, 18 December 2024)
- ML20052E268 + (12:17:39, 18 December 2024)
- ML20052E267 + (12:17:40, 18 December 2024)
- ML20052E266 + (12:17:41, 18 December 2024)
- ML20052E264 + (12:17:42, 18 December 2024)
- ML20052E263 + (12:17:44, 18 December 2024)
- B10490, Final Significant Deficiency Rept Re Potential for Loss of All Auxiliary Feedwater Following Small Steam Line Rupture Referenced in .Evaluation Determined That Deficiency Does Not Exist + (12:17:45, 18 December 2024)
- ML20052E260 + (12:17:47, 18 December 2024)
- ML20052E259 + (12:17:48, 18 December 2024)
- ML20052E257 + (12:17:48, 18 December 2024)
- ML20052E256 + (12:17:49, 18 December 2024)
- ML20052E255 + (12:17:50, 18 December 2024)
- ML20052E252 + (12:17:56, 18 December 2024)
- PLA-1073, Final Deficiency Rept Re Design of Emergency Core Cooling Pump Circuit Breakers,Initially Reported 810921.Mod to Eliminate Sneak Circuits Issued by Bechtel.Also Reportable Per Part 21 + (12:18:03, 18 December 2024)
- ML20052E248 + (12:18:05, 18 December 2024)