Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058M445 + (13:03:56, 17 December 2024)
- ML20058M443 + (13:03:57, 17 December 2024)
- BSEP-93-0227, Forwards Rev 1 to GE Rept GE-NE-523-143-1093, Brunswick Unit 1 Shroud Repair Hardware Stress Analysis, in Response to NRC Request Made at 931130 Meeting Re non-limiting Loads Resulting from Annulus Pressurization Events + (13:03:58, 17 December 2024)
- IR 05000354/1990013 + (13:03:58, 17 December 2024)
- ML20058M437 + (13:03:59, 17 December 2024)
- ML20058M436 + (13:04:00, 17 December 2024)
- ML20058M434 + (13:04:04, 17 December 2024)
- ML20058M433 + (13:04:05, 17 December 2024)
- B13598, Proposed Tech Specs Re Removal of cycle-specific Parameter Limits + (13:04:06, 17 December 2024)
- ML20058M428 + (13:04:06, 17 December 2024)
- 05000483/LER-1993-005, :on 931114,ESF Actuation on High S/G Occurred. Caused by S/G Level Allowed to Be Taken Too Close to High Level Setpoint.Procedure Will Be Revised & Licensed Operators Will Receive Addl Training + (13:04:08, 17 December 2024)
- 05000285/LER-1993-015, :on 931109,emergency Boration of RCS Was Initiated Due to Induced Electrical Noise.Performed Maint on WR Nuclear Instrumentation Channels a & D + (13:04:11, 17 December 2024)
- IR 05000416/1990012 + (13:04:13, 17 December 2024)
- ML20058M423 + (13:04:14, 17 December 2024)
- 05000289/LER-1993-009, :on 931112,motor Operator Failure Occurred Due to Improper Declutch Lever Installation.Eight Nuclear Safety Related Limitorque Size Smb 000 MOVs Modified W/New Balanced Declutch Levers + (13:04:15, 17 December 2024)
- ML20058M419 + (13:04:17, 17 December 2024)
- ML20058M418 + (13:04:18, 17 December 2024)
- LD-93-174, Responds to Request of NRC Staff & Forwards Five Copies of Selected CESSAR-DC Parameters & Assumptions Addressed in Certified Design Matl for System 80+ Standard Plant Design + (13:04:26, 17 December 2024)
- ML20058M412 + (13:04:26, 17 December 2024)
- ML20058M411 + (13:04:27, 17 December 2024)
- ML20058M410 + (13:04:28, 17 December 2024)
- IR 05000374/1993025 + (13:04:29, 17 December 2024)
- ML20058M407 + (13:04:36, 17 December 2024)
- ML20058M406 + (13:04:37, 17 December 2024)
- ML20058M405 + (13:04:37, 17 December 2024)
- ML20058M404 + (13:04:39, 17 December 2024)
- ML20058M402 + (13:04:40, 17 December 2024)
- ML20058M401 + (13:04:40, 17 December 2024)
- 3F0993-10, Responds to GL 89-10,suppl 5, Inaccuracy of MOV Diagnostic Equipment, Re Confirmation of Proper Size or to Establish Settings for MOV + (13:04:41, 17 December 2024)
- ML20058M398 + (13:04:43, 17 December 2024)
- 05000254/LER-1993-002-01, :on 930302,determined Average .25 Inches of Water Cannot Be Maintained in Secondary Containment Per Ts. Caused by Testing Deficiency.Procedure Qts 160-5 Will Be Changed to Adjust for Test Deficiency + (13:04:45, 17 December 2024)
- ML20058M393 + (13:04:47, 17 December 2024)
- IR 05000331/1993011 + (13:04:48, 17 December 2024)
- IR 05000289/1989099 + (13:05:04, 17 December 2024)
- B14697, Provides Update to Staff W/Respect to Completion Schedule of MOV Testing Program at Hnpp & Mnps Units 1-3 Being Implemented Per GL-89-10 + (13:05:05, 17 December 2024)
- PNO-II-90-041, on 900726,medical Technician Noticed Prime Alert Light on & Blinking Indicating Source Not Completely in Sheilded Position.Wholebody Dose Estimates for Physicist & Technician Is 30 Mrem & 190 Mrem,Respectively + (13:05:06, 17 December 2024)
- ML20058M379 + (13:05:07, 17 December 2024)
- ML20058M377 + (13:05:08, 17 December 2024)
- ML20058M375 + (13:05:08, 17 December 2024)
- ML20058M374 + (13:05:10, 17 December 2024)
- PNO-I-90-062, on 900806,containment Unidentified Leak Rate Exceeded Tech Spec Limit.Caused by Water Introduction Into Drywell.Licensee Began Plant Shutdown,Vented Drywell & Evaluated Plant Conditions + (13:05:10, 17 December 2024)
- JPN-93-070, Proposed Tech Specs,Revising TS Re Esws Pump Surveillance Requirement 4.11.D.1 + (13:05:11, 17 December 2024)
- ML20058M369 + (13:05:12, 17 December 2024)
- ML20058M367 + (13:05:13, 17 December 2024)
- PNO-I-90-061, on 900806,plant Operators Manually Scrammed Reactor Due to High Vibration on Main Turbine Bearing.Caused by Blank Flange Left in Oil Supply Line to Bearing.Resident Inspectors Following Licensee Actions + (13:05:13, 17 December 2024)
- IR 05000156/1993002 + (13:05:14, 17 December 2024)
- ML20058M358 + (13:05:15, 17 December 2024)
- ML20058M354 + (13:05:16, 17 December 2024)
- ML20058M356 + (13:05:16, 17 December 2024)
- ML20058M350 + (13:05:18, 17 December 2024)
- ML20058M347 + (13:05:19, 17 December 2024)
- ML20058M349 + (13:05:19, 17 December 2024)