TS Change 93-10 to Licenses DPR-77 & DPR-79,revising Various Fire Protection Specifications to Clarify Operability Requirements Re Fire Suppression Sys Flowpath & Delete Special Reporting Requirements
ML20058M423
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/28/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058M426 List:
References
CON-TVA-SQN-TS-93-10 TVA-SQN-TS-93-1, NUDOCS 9310050215
Download: ML20058M423 (2)


Text

a.

q nn l Tennessee Vaney Authocty Post Once Box 2000 Soddy-Daisy Tennessee 37379-2000 l

Robert A. Fenech vee Prwdent, sequoyan tJuclear Plant September 28, 1993 TVA-SQN-TS-93-10 10 CFR 50.90 U.S. Nuclear Regulatory Commission

  • ATTN: Document Control Desk Washington, D.C. 20555 .l Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 i SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 93-10, .

" FIRE PROTECTION"

  • In accordance with 10 CFR 50.90, we are enclosing a requested amendment ,

to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2. i The proposed change revises various fire protection specifications to ,

(1) clarify operability requirements regarding fire suppression system i flowpath, (2) delete special reporting requirements, and (3) incorporate ,

additional guidance into a TS action requirement for spray and/or ]

sprinkler systems inside containment.

l The proposed TS change is identified in Enclosure 1. The justification  :

for the proposed TS change is provided in Enclosure 2. A proposed j determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

i TVA views the current special reporting requirements as an undue burden on the facility. Therefore, TVA requests an expeditious review of the enclosed amendment request. TVA requests a 45-day implementation period for this TS change following issuance.

0400%

9310050215 930928 DM E'

PDR P

ADDCK 05000327 /V j PDR []

U.S. Nuclear Regulatory Commission Page 2 ,

September 28, 1993 Please direct questions concerning this issue to D. V. Goodin at (615) 843-7734.

Sincerely, i

.J, -

Robert A. Fenech  !

Sworn tp and subsc ibed before me (nisJLA_Ch day of 1993  !

/  :

Notary Public My Commission Expires/_y/ 77 Enclosures  ;

cc (Enclosures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North ,

11555 Rockville Pike  ;

Rockville, Maryland 20852-2739 i Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street  ;

Nashville, Tennessee 37243-1532 ,

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road l Soddy-Daisy, Tennessee 37379-3624 ,

Regional Administrator  ;

U.S. Nuclear Regulatory Commission j Region II 101.Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l