Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-33767, Revises 900830 Response to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19.Corrective Actions:Bright Green Self Adhesive Paper Dots Installed on Reg Guide 1.97 Type A,B & C Instruments Designated Category 1 or 2 + (02:10:00, 17 December 2024)
- ML20064B504 + (02:10:01, 17 December 2024)
- ML20064B540 + (02:10:01, 17 December 2024)
- ML20064B498 + (02:10:02, 17 December 2024)
- ELV-02171, Forwards Amend 19 to Physical Security & Contingency Plan. Amend Withheld (Ref 10CFR73.21) + (02:10:03, 17 December 2024)
- 05000424/LER-1990-003, S-01:on 900425,engineering Supervisor Observed Unsecured & Unattended Safeguards Cabinet in Engineering Support Dept Ofc Area.Caused by Cognitive Personnel Error. Engineer Counseled + (02:10:05, 17 December 2024)
- ML20064B492 + (02:10:06, 17 December 2024)
- ML20064B490 + (02:10:07, 17 December 2024)
- ML20064B491 + (02:10:07, 17 December 2024)
- ML20064B487 + (02:10:08, 17 December 2024)
- ELV-02143, Forwards Addl Info Re 900911 Petition by Mb Hobby & AL Mosbaugh + (02:10:09, 17 December 2024)
- ML20064B464 + (02:10:10, 17 December 2024)
- ML20064B485 + (02:10:10, 17 December 2024)
- 3F0990-13, Proposed Tech Specs Re Snubber Insp Schedule + (02:10:11, 17 December 2024)
- ML20064B462 + (02:10:11, 17 December 2024)
- 3F1090-01, Informs NRC of Option Selected for Permanent Resolution of Reactor Bldg Flood Level Issue + (02:10:12, 17 December 2024)
- ML20064B456 + (02:10:12, 17 December 2024)
- ML20064B439 + (02:10:13, 17 December 2024)
- ML20064B419 + (02:10:14, 17 December 2024)
- ML20064B417 + (02:10:14, 17 December 2024)
- ML20064B414 + (02:10:15, 17 December 2024)
- ML20064B411 + (02:10:15, 17 December 2024)
- ML20064B400 + (02:10:16, 17 December 2024)
- ML20064B396 + (02:10:16, 17 December 2024)
- ML20064B393 + (02:10:17, 17 December 2024)
- ML20064B394 + (02:10:17, 17 December 2024)
- 3F1090-04, Provides Licensee Disposition of Reactor Bldg Spray Ph Concern Identified During Resolution of Reactor Bldg Flood Level Issue,Including Safety Implications of Changes & Corrective Actions + (02:10:18, 17 December 2024)
- 3F1090-02, Suppls 900418 Rept of LOCA Peak Cladding Temp to Close Issue of Changes in LOCA Evaluation Model + (02:10:18, 17 December 2024)
- 3F1090-05, Provides Plan & Schedule for Environ Qualification of Electrical Equipment in Intermediate Bldg at Facility. Vendor Qualification Packages Will Be Revised to Reflect Newly Installed Equipment & Addl Analyses on Existing Ones + (02:10:19, 17 December 2024)
- BECO-90-113, Informs of Termination of Senior Reactor Operator,El Cobb on 900901,per 10CFR50.74 + (02:10:19, 17 December 2024)
- BECO-90-120, Monthly Operating Rept for Sept 1990 for Pilgrim Nuclear Power Station + (02:10:20, 17 December 2024)
- ML20064B378 + (02:10:21, 17 December 2024)
- ML20064B373 + (02:10:22, 17 December 2024)
- ML20064B371 + (02:10:24, 17 December 2024)
- ML20064B365 + (02:10:25, 17 December 2024)
- ML20064B361 + (02:10:26, 17 December 2024)
- ML20064B356 + (02:10:27, 17 December 2024)
- ML20064B345 + (02:10:28, 17 December 2024)
- ML20064B342 + (02:10:30, 17 December 2024)
- ML20064B343 + (02:10:30, 17 December 2024)
- BVY-90-097, Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage + (02:10:31, 17 December 2024)
- ML20064B339 + (02:10:31, 17 December 2024)
- PY-CEI-NRR-1240, Forwards Rev 15 to Security Plan.Rev Withheld (Ref 10CFR73.21) + (02:10:32, 17 December 2024)
- RBG-33772, Monthly Operating Rept for Sept 1990 for River Bend Station Unit 1 + (02:10:33, 17 December 2024)
- ML20064B337 + (02:10:33, 17 December 2024)
- ML20064B321 + (02:10:34, 17 December 2024)
- ML20064B319 + (02:10:38, 17 December 2024)
- ML20064B318 + (02:10:39, 17 December 2024)
- ML20064B317 + (02:10:39, 17 December 2024)
- 05000440/LER-1990-024, :on 900909,determined That Failure to Properly Control Surveillance Testing Resulted in Suppression Pool Instrumentation Being Out of Svc.Caused by Procedural Deficiency.Licensed Operators Trained to Lessons Learned + (02:10:41, 17 December 2024)
- ML20064B308 + (02:10:42, 17 December 2024)
- ML20064B307 + (02:10:43, 17 December 2024)