Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064L988 + (01:21:51, 17 December 2024)
- ML20064L986 + (01:21:52, 17 December 2024)
- ML20064L983 + (01:21:53, 17 December 2024)
- ML20064L984 + (01:21:53, 17 December 2024)
- BECO-94-030, Responds to Violation Noted in Insp Rept 50-293/94-01. Corrective Actions:Comprehensive Set of Procedures for Documenting & Monitoring Plant Performance Verified in Place + (01:21:54, 17 December 2024)
- AECM-82-458, Forwards Public Version of Revised Corporate Emergency Plan Procedures,Including Procedures 6.1 Re Notification of Unusual event,6.2 Re Alert & 6.3 Re Site Emergency + (01:21:54, 17 December 2024)
- ML20064L965 + (01:21:55, 17 December 2024)
- ML20064L956 + (01:21:56, 17 December 2024)
- B14789, Responds to Violation Noted in Insp Rept 50-423/93-81 Re Inadequate Evaluation of Battery Capacity.Corrective Actions:Battery Performance Test Repeated & Established Capacity of 96.6 + (01:21:57, 17 December 2024)
- ML20064L951 + (01:21:57, 17 December 2024)
- ML20064L934 + (01:21:58, 17 December 2024)
- ML20064L943 + (01:21:58, 17 December 2024)
- ML20064L929 + (01:21:59, 17 December 2024)
- ML20064L920 + (01:22:00, 17 December 2024)
- 3F0394-09, Forwards Itemization of Various Insurance Policies Currently in Place for Crystal River Unit 3 + (01:22:01, 17 December 2024)
- ML20064L900 + (01:22:04, 17 December 2024)
- ML20064L899 + (01:22:06, 17 December 2024)
- ML20064L898 + (01:22:07, 17 December 2024)
- ML20064L888 + (01:22:08, 17 December 2024)
- ML20064L890 + (01:22:08, 17 December 2024)
- ML20064L878 + (01:22:09, 17 December 2024)
- 05000366/LER-1983-002-03, /03L-0:on 830118,primary Containment Isolation Reactor Water Level low-low Instrument Channel B Found Out of Calibr.Caused by Setpoint Drift.Instrument Recalibr + (01:22:10, 17 December 2024)
- ML20064L869 + (01:22:11, 17 December 2024)
- ML20064L863 + (01:22:12, 17 December 2024)
- ML20064L867 + (01:22:12, 17 December 2024)
- ML20064L861 + (01:22:13, 17 December 2024)
- 05000366/LER-1983-002, Forwards LER 83-002/03L-0 + (01:22:14, 17 December 2024)
- ML20064L855 + (01:22:14, 17 December 2024)
- HL-4529, Comment Supporting Proposed Amends to 10CFR20 Re Radiological Criteria for Decommissioning of NRC Licensed Facilities + (01:22:15, 17 December 2024)
- ML20064L852 + (01:22:15, 17 December 2024)
- ML20064L849 + (01:22:16, 17 December 2024)
- ML20064L845 + (01:22:23, 17 December 2024)
- ML20064L836 + (01:22:24, 17 December 2024)
- ML20064L841 + (01:22:24, 17 December 2024)
- 05000266/LER-1994-003, :on 940217,reactor Coolant Sys Sample Line Declared Inoperable & Isolated.Caused by Failure of SC-955 as Result of Loss of Coolant Accident.Penetration P-28a on Units Isolated + (01:22:27, 17 December 2024)
- ML20064L814 + (01:22:29, 17 December 2024)
- ML20064L812 + (01:22:30, 17 December 2024)
- ML20064L809 + (01:22:31, 17 December 2024)
- ML20064L797 + (01:22:32, 17 December 2024)
- ML20064L800 + (01:22:32, 17 December 2024)
- ML20064L796 + (01:22:33, 17 December 2024)
- ML20064L789 + (01:22:34, 17 December 2024)
- ML20064L787 + (01:22:35, 17 December 2024)
- ML20064L782 + (01:22:35, 17 December 2024)
- ML20064L776 + (01:22:36, 17 December 2024)
- ML20064L775 + (01:22:37, 17 December 2024)
- ML20064L771 + (01:22:38, 17 December 2024)
- ML20064L763 + (01:22:38, 17 December 2024)
- 05000335/LER-1983-002-03, /03L-0:on 830106,pressurizer Surge Line Sample Containment Isolation Valve Failed to Close Upon Signal from Remote Switch.Caused by Mechanical Freeze Due to Corrosion Buildup Between Bonnet & Stem.Valve Repaired + (01:22:40, 17 December 2024)
- ML20064L752 + (01:22:41, 17 December 2024)
- LIC-93-0303, Provides Response to Request for Addl Re Fort Calhoun Station QA Program for Procedure Reviews + (01:22:42, 17 December 2024)
- ML20064L745 + (01:22:43, 17 December 2024)