Forwards Public Version of Emergency Plan Manual,Including Revisions to Procedures EP 2.0 Re Emergency Plan Definitions,Ep 4.0 Re Emergency Conditions & EP 6.0 Re Emergency Measures
ML20064L890
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/02/1982
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20064L885 List:
References
NUDOCS 8208260059
Download: ML20064L890 (5)


Text

- .

1 Wisconsin Electnc ma coune 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 August 2, 1982 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. R. A. Clark, Chief Operating Reactors Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN MANUAL POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are ten copies of the Point Beach Nuclear Plant Emergency Plan Manual. Please destroy your complete copies and replace with the following:

PROCEDURES

1. EP 1.0, " Introduction", Revision 19, dated 07-30-82.
2. EP 2.0, " Emergency Plan Definitions", Revision 19, dated 07-30-82.
3. EP 3.0, " Summary of Emergency Plan", Revision 19, dated 07-10-82.
4. EP 4.0, " Emergency Conditions", Revision 19, dated 07-30-82.

! 5. EP 5.0, " Organizational Control of Emergencies",

l Revision 19, dated 07-30-82, t

6. E 60 " Emergency Measures", Revision 19, dated j 7. EP 7.0, " Emergency Facilities and Equipment",

j i y Revision 19, dated 07-30-82.

i } 8. EP 8.0, " Maintaining Emergency Preparedness", Revision I 19, dated 07-30-82.

l l 9. EP 9.0, " Recovery", Revision 19, dated 07-30-82.

R F

~ .

Mr. H. R. Denton August 2, 1982 APPENDICES

1. Appendix A, " Emergency Response Organization Personnel' Functions and Responsibilities",

Revision 2, dated 07-30-82.

2. Appendix C, " Maps", Revision 1, dated 07-30-82.
3. Appendix D, " Letters of Agreement", Revision 1, dated 07-30-82.
4. Appendix E, " State of Wisconsin Peacetime Radio-logical Emergency Response Plan".
5. Appendix F, "Manitowoc County Nuclear Facility Inciden,t Response Plan".
6. Appendix G, "Kewaunee County Nuclear Facility Incident Response Plan".
7. Appendix H, " Typical Equipment Lists", Revirion 2, dated 07-30-82.
8. Appendix I, " List of EPIP Categories and Cross-references to the Emergency Plan", Revision 1, dated 07-30-82.
9. Appendix J, " Evacuation Time Estimates for the Area Surrounding PBNP", Revision 1, dated 07-30-82.

MISCELLANEOUS

1. Table of Contents, dated 07-30-82.
2. List of Tables, dated 07-30-82.
3. List of Figures, dated 07-30-82.
4. Index, dated 07-30-82.

These revisions consist of page changes which should be filed in your copy of the Emergency Plan Manual in accordance

t

~. .

t l i

August 2, 1982 Mr. H. R. Denton with the attached instructions. Please return the receipt form for these ten copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, v - -

,A Sol Burstein Executive Vice President Enclosures Copies to NRC Resident Inspector (1)

Incident Response Center, Region III (3) -

i P

I l

l

~~

. July 30, 1982 YSAYb ~ h $huW! /0 8 '22 POINT BEAC.. 'T" EAR PLANT EMERGENCY PLAN MANUAL Attached is a copy of the Point Beach Nuclear Plant Emergency Plan Manual. Please destroy your complete copy and replace with the following:

1. EP 1.0, " Introduction," Revision 19, dated 07-30-82.
2. EP 2.0, " Emergency Plan Definitions ," Revision 19, dated 07-30-82.
3. EP 3.0, " Summary of Emergency Plan," Revision 19, dated 07-30-82.
4. EP 4.0, " Emergency Conditions," Revision 19, dated 07-30-82.
5. EP 5.0, " Organizational Control of Emergencies," Revision 19, dated 07-30-82.
6. EP 6.0, " Emergency Measures," Revision 19, dated 07-30-82.
7. EP 7.0, " Emergency Facilities and Equipment," Revision 19, dated 07-30-82.
8. EP 8.0, " Maintaining Emergency Preparedness," Revision 19, dated 07-30-82.

l 9. EP 9.0, " Recovery," Revision 19, dated 07-30-82.

10. Appendix A, " Emergency Response Organization Personnel Functions &

Responsibilities," Revision 2, dated 07-30-82.

11. Appendix C, " Maps," Revision 1, dated 07-30-82.
12. Appendix D, " Letters of Agreement," Revision 1, dated 07-30-82.
13. Appendix E, " State of Wisconsin Peacetime Radiological Incident Response Plan."
14. Appendix F, "Manitowoc County Nuclear Facility Incident Response Plan."
15. Appendix G, "Kewaunee County Nuclear Facility Incident Response l

Plan."

16. Appendix H, " Typical Equipment Lists," Revision 2, dated 07-30-82.
17. Appendix I, " List of EPIP Categories and Crossreferences to the Emergency Plan," Revision 1, dated 07-30-82.
18. Appendix J, " Evacuation Time Estimates for the Area Surrounding PBNP," Revision 1, dated 07-30-82.

Also attached are copies of the Table of contents, List of Tables, and List of Figures to be inserted at the front of your manual.

Also attached is a copy of the Index to be inserted at the back of your manual.

l Please fill out and return the attached receipt form to Ms. F. A. Zeman at the Point Beach Nuclear Plant.

/

J. E. Knorr -

/

cmz Attachments POINT BEACH NUCLEAR PLANT

  1. Rk'c. -ah& (

EMERGENCY PLAN MANUAL ['A 07-30-82 ,

I hereby acknowledge receipt of EP 1.0, EP 2.0, EP 3.0, ZP 4.0, EP 5.0, EP 6.0, EP 7.0, EP 8.0, EP 9.0, Appendix A, Appendix C, Appendix D, Appen-dix E, Appendix F, Appendix G, Appendix H, Appendix I and Appendix J and have inserted them into my manual.

Date i

FOR INFORMfiDN MLY

\