GPU Nuclear Corporation U Nuclear
= g ge8s48o S
Middletown, Pennsylvania 17057 717 944 7621 TELEX 84-2386 Writer"s Direct Dial Number:
February 9, 1983 5211-83-037 Office of' Nuclear Reactor Regulation Attn: John F. Stolz Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Status of TMI-1 Technical Specification Change Requests (TSCR)
Attached is a table that indicates the status of the TSCR's that are pending action (i.e. submitted by GPUN but not approved by NRC). This table is pro-vided to facilitate our mutual understanding of the status of each change so that appropriate action can be taken as needed.
You should specifically note that by this letter, CPUN is withdrawing several TSCR's.
Also it should be noted that five of our pending TSCR's are needed for restart.
Sincerely, r'
H. D. Hukill Director, TMI-l HDH:CWS:vj f Attachment cc:
R. Conte J. Van Vliet ON 8302150368 830209 PDR ADOCK 05000289 P
PDR GPU Nuclear Corporation is a subsidiary of the General Pubhc Utihties Corporation
o OUTSTANDING TSCR's TSCR #
Subject
' Action 26 MPC,to Xenon Withdrawn 38 Fuel Cask Drop NRC Approval Requested 42 RCS Leakage Interpretation Withdrawn 66 Relief Valve Capacity Withdrawn 78 Station ETS Withdrawn 81 STS Conversion Withdrawn 82 Small Break LOCA Procedures Withdrawn 83~
Fire Protection Withdrawn (See TSCR 97) 94 OTSG Tube Inspection Withdrawn 95/95A Definition of Operable Withdrawn 96 Fire Barriers Withdrawn (See TSCR 97) 97 Fire Protection NRC approval requested 99 Administrative Changes NRC Approval Requested 100A TS Appendix B changes Withdrawn by TSCR 118 i
104 RV Surveillance Capsule Utilization Factor CPUN to further revise to reflect the extended TMI-l shutdown 105 Snubber Surveillance NRC Approval Requested
'107 RB Spray System NRC Approval Needed for Restart 108 Natural Circulation Testing NRC Approval Needed for Restart 109
.H2 Recombiner NRC Approval Requested 113 Appendix J Testing NRC Approval Requested 114 High Range Radiation Monitors NRC Approval Requested 116 RB Purge Valve Testing
- GPUN to further revise pending NRC approval of GPUN Proposal on Purgirg (5211-82-307) 118 Deletion of Appendix B NRC approval was requested by 12/1/82 119 Aircraft Movement Reporting NRC Approval Requested 120 ES Bypass Setpoint NRC Approval Needed for Restart 121 Caste Gas System Monf.toring/ Limits NRC Approval Requested by 3/15783 122 Audit Frequency Changes NR". Approval Requested 123 SG Tube Repair Admin. Change NRC Approval Required for Heatup
- The portion of TSCR No.116 which permits reduced reactor building purge exhaust flow rate and testing frequency to accommodate 3(fpurge valve opening limitation needs NRC approval for Restart.
y
- -..