Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064N301 + (01:14:59, 17 December 2024)
- ML20064N300 + (01:15:00, 17 December 2024)
- 05000255/LER-1983-003-03, /03L-0:on 830106,during Normal Operation,B Safety Injection Tank T-82B Reached Tech Spec Limit of 198 Inches. Caused by Minor Leakage Past Loop Check Valve & Tank Check Valve Refill & Drain Valve.Valves Will Be Inspected + (01:15:02, 17 December 2024)
- 05000361/LER-1982-072, Forwards LER 82-072/03L-0.Detailed Event Analysis Submitted + (01:15:03, 17 December 2024)
- JAFP-82-0947, Forwards Monthly Operating Rept for Aug 1982 + (01:15:04, 17 December 2024)
- ML20064N294 + (01:15:04, 17 December 2024)
- ML20064N285 + (01:15:05, 17 December 2024)
- ML20064N280 + (01:15:07, 17 December 2024)
- 05000255/LER-1983-003, Forwards LER 83-003/03L-0 + (01:15:08, 17 December 2024)
- 05000321/LER-1982-065-03, /03L-0:on 820730,reactor Vessel Level Instrumentation Switch 2,contributing to Actuation Logic of Automatic Depressurization Sys,Found Inoperable During Surveillance Test.Caused by Fouled Contact on Switch + (01:15:09, 17 December 2024)
- ML20064N277 + (01:15:10, 17 December 2024)
- ST-HL-AE-4733, Application for Amends to Licenses NPF-71 & NPF-80,revising TS 3.4.9.3, Overpressure Protection Sys to Change PORV Setpoint Curve for Cold Overpressure Mitigation Sys.Rev 1 to Proprietary WCAP-13782 & Rev 2 to WCAP-13962 Encl + (01:15:11, 17 December 2024)
- ML20064N274 + (01:15:12, 17 December 2024)
- ML20064N273 + (01:15:13, 17 December 2024)
- ML20064N272 + (01:15:14, 17 December 2024)
- ML20064N271 + (01:15:15, 17 December 2024)
- 05000265/LER-1982-014-03, /03L-0:on 820802,outboard Gland & Packing Nut Found Off & Lantern Ring & Packing Found Partially Out of 2-1001-65C RHR Sys Svc Water Main Pump.Cause Under Investigation.Pump Repacked on 820802 + (01:15:17, 17 December 2024)
- 0CAN028304, Forwards Calculation Illustrating Possible Constraints Affecting Cold Shutdown W/Loss of Offsite Power Condition. Facility Unable to Achieve Cold Shutdown Per 10CFR50 App R + (01:15:18, 17 December 2024)
- ML20064N265 + (01:15:19, 17 December 2024)
- 0CAN028305, Advises That Addl Info Re Proposed Spent Fuel Storage Expansion Will Be Provided by 830225,in Response to NRC + (01:15:20, 17 December 2024)
- ML20064N262 + (01:15:20, 17 December 2024)
- ML20064N260 + (01:15:21, 17 December 2024)
- ML20064N261 + (01:15:21, 17 December 2024)
- ML20064N259 + (01:15:22, 17 December 2024)
- 05000293/LER-1982-024-01, /01T-0:on 820813,HPCI Tripped Due to High Reactor Water Level.Caused by Failure of HPCI Gland Seal Condenser Gasket Wetting HPCI Control Circuitry.Circuits Dried & Calibr.Gasket Repaired Using Improved Version of SIL-129 + (01:15:24, 17 December 2024)
- ML20064N257 + (01:15:25, 17 December 2024)
- 05000321/LER-1982-065, Forwards LER 82-065/03L-0 + (01:15:26, 17 December 2024)
- ML20064N253 + (01:15:26, 17 December 2024)
- 05000237/LER-1982-034-03, During Power Operation, Pinhole Leak Discovered in HPCI Drain Pot Drainline to Main Condenser.Caused by Erosion.Segment of Pipe Replaced W/Schedule 80 Carbon Steel Pipe + (01:15:30, 17 December 2024)
- ML20064N248 + (01:15:31, 17 December 2024)
- 05000265/LER-1983-004-03, /03L-0:on 830116,containment Cooling Loop B Taken Out of Svc for Maint on RHR HX 2B.Bellows Seal Replaced on Pipe from Primary Side of HX Through Secondary Side & Through Exterior of HX for Draining Primary Side + (01:15:35, 17 December 2024)
- ML20064N239 + (01:15:36, 17 December 2024)
- ML20064N238 + (01:15:37, 17 December 2024)
- 05000237/LER-1982-034, Forwards Updated LER 82-034/03X-1 + (01:15:38, 17 December 2024)
- ML20064N234 + (01:15:38, 17 December 2024)
- ML20064N233 + (01:15:39, 17 December 2024)
- 05000293/LER-1982-024, Forwards LER 82-024/01T-0 + (01:15:40, 17 December 2024)
- 05000265/LER-1983-004, Forwards LER 83-004/03L-0 + (01:15:40, 17 December 2024)
- 05000265/LER-1982-014, Forwards LER 82-014/03L-0 + (01:15:41, 17 December 2024)
- 0CAN028308, Advises That Addl Info Re Proposed Spent Fuel Storage Expansion Will Be Provided by 830225,in Response to NRC + (01:15:41, 17 December 2024)
- ML20064N219 + (01:15:43, 17 December 2024)
- ML20064N210 + (01:15:43, 17 December 2024)
- ML20064N204 + (01:15:44, 17 December 2024)
- RC-94-0083, Forwards Amend 94-03 to FSAR for VC Summer Nuclear Station. Amend Updated as of 940304 & Constitutes Third Update of FSAR for 1994 + (01:15:45, 17 December 2024)
- ML20064N190 + (01:15:46, 17 December 2024)
- ML20064N187 + (01:15:48, 17 December 2024)
- ML20064N183 + (01:15:48, 17 December 2024)
- ML20064N181 + (01:15:49, 17 December 2024)
- ML20064N178 + (01:15:50, 17 December 2024)
- ML20064N179 + (01:15:50, 17 December 2024)
- ML20064N176 + (01:15:52, 17 December 2024)
- ML20064N174 + (01:15:53, 17 December 2024)