Application for Amend to License NPF-3,revising TSs & Applicable Bases to Relocate Certain cycle-specific Protective Limits & Core Operating Limits to COLRML20064N179 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
03/18/1994 |
---|
From: |
Shelton D CENTERIOR ENERGY |
---|
To: |
|
---|
Shared Package |
---|
ML20064N175 |
List: |
---|
References |
---|
2197, NUDOCS 9403290202 |
Download: ML20064N179 (6) |
|
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20216E6051999-09-0707 September 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20210H0631999-07-28028 July 1999 Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, by Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4131999-07-27027 July 1999 Application for Amend to License NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G8831999-07-26026 July 1999 Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5251999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G4631999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumention & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20195F9121999-06-10010 June 1999 Application for Amend to License NPF-3,changing TS 3/4.6.4.4 Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20207E7861999-05-21021 May 1999 Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capability ML20205E4961999-03-19019 March 1999 Application for Amend to License NPF-3,requesting Withdrawal of Proposed New Action B to TS 3.6.5.2,previously Submitted in 981027 Application ML20204F1691999-03-0909 March 1999 Application for Amend to License NPF-3,adopting Changes in Frequency & Scope of Volumetric Exams Justified by W TR WCAP-14535A ML20196F3791998-11-30030 November 1998 Supplemental Application for Amend to License NPF-3, Proposing Changes to License Conditions 2.C(6) & 2.E by Transferring Operating Authority for DBNPS from Toed & Centerior Svc Co to Firstenergy Nuclear Operating Co ML20155E3181998-10-28028 October 1998 Application for Amend to License NPF-3,revising Various Sections of TS 6.0, Administrative Controls, Including Relocation of Contents of 6.11 to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E0701998-10-27027 October 1998 Application for Amend to License NPF-3,revising TSs 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation by Providing Potential Reduction in Spurious Trip Rate to Provide Cost Savings in Excess of $50,000 ML20155D7731998-10-27027 October 1998 Application for Amend to License NPF-3,relocating Existing TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8481998-10-27027 October 1998 Application for Amend to License NPF-3,revising Existing TS SRs 4.8.2.3.2.d,4.8.2.3.2.e,4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2811998-09-0808 September 1998 Application for Amend to License NPF-3,permitting Use of Framatome Cogema Fuels M5 Advanced Alloy Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2851998-09-0808 September 1998 Application for Amend to License NPF-3,revising TS Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20236G6461998-06-29029 June 1998 Application for Amend to License NPF-3,transferring Operating Authority for DBNPS from TE & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments Included ML20236R2301998-06-29029 June 1998 Resubmitted Application for Amend to License NPF-3, Transferring Operating Authority for DBNPS from Teco & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Safety Assessment & EA Included ML20217P8671998-04-24024 April 1998 Application for Amend to License NPF-3,modifying Existing TS 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases by Relocating Tables of Response Time Limits from TS to Plant USAR Technical Requirements Manual ML20217P8251998-04-24024 April 1998 Application for Amend to License NPF-3,clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20203L0861998-02-26026 February 1998 Application for Amend to License NPF-3 to Revise TS 3/4.4.5 & TS 3/4.4.6.2,incorporating New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2511997-12-23023 December 1997 Application for Amend to License NPF-3.Amend Changes TS Definitions 1.12,TS 3/4.9.5 & New TS 3.0.6 ML20197J5861997-12-23023 December 1997 Application for Amend to License NPF-3,revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2801997-08-26026 August 1997 Application for Amend to License NPF-3,clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2831997-08-26026 August 1997 Application for Amend to License NPF-3,modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5931997-07-29029 July 1997 Suppl 950929 to Application for Amend to License NPF-3, Change TS 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating & Associated Bases 3/4.4.2 & 3/4.4.3 ML20141F1051997-06-24024 June 1997 Application for Amend to License NPF-3,deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138A3201997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Conversion to 24-month Fuel Cycle ML20138C3131997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Rev to TS 3/4.7.6 to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20138M1251997-02-14014 February 1997 Application for Amend to License NPF-3,requesting Delay of Heat Removal Sys Valve Pit Surveillance Requirements ML20134D7461997-01-30030 January 1997 Application for Amend to License NPF-3,revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0561997-01-20020 January 1997 Application for Amend to License NPF-3,involving TS 3/4.5.3 Re ECCS Subsystems ML20132C7771996-12-13013 December 1996 Application for Amend to License NPF-3,authorizing Transfers of Control ML20132B6871996-12-11011 December 1996 Application for Amend to License NPF-3,revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle ML20134F1851996-10-28028 October 1996 Application for Amend to License NPF-3,requesting Revisions to 3/4.8.1.1,3/4.8.1.2,3/4.8.2.3,3/4.8.2.4 & 3/4.8 Re Electrical Power Systems ML20117P5301996-09-17017 September 1996 Application for Amend to License NPF-3,supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8441996-09-12012 September 1996 Application for Amend to License NPF-3,revising Reactivity Control Systems & Emergency Core Cooling Systems ML20117M1971996-09-0404 September 1996 Application for Amend to License NPF-3,App A,Modifying TS 6.2.3 by Removing Specific Overtime Limits & Working H from TS Consistent W/Nrc Recent Determination,On Generic Basis, That Limits Need Not Be Specified ML20116K2601996-08-0707 August 1996 Application for Amend to License NPF-3,changing Tech Specs 1.0, Definitions, Bases 3/4.0, Applicability & 3/4.6.2.1, Containment Sys - Depressurization & Cooling Sys - Containment Spray Sys ML20117K1871996-05-28028 May 1996 Application for Amend to License NPF-3,revising TS 3/4.3.1.1 RPS Instrumentation & TS 3/4.3.2.2 - Anticipatory RTS Instrumentation to Increase Trip Device Test Interval ML20107L3541996-04-18018 April 1996 Application for Amend to License NPF-3,requesting NRC Review & Approval to Use Alternate Electrical Lineup.Station Blackout DG as Standby Emergency Power Source to Supply Loads Normally Supplied by EDG 1,while Being Reworked ML20101M1601996-03-29029 March 1996 Application for Amend to License NPF-3,App A,Re Surveillance Requirements for Charcoal Filter Lab Testing to Revise Testing Methodology Used to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20101C6911996-03-0606 March 1996 Application for Amend to License NPF-3,revising TS 3/4.5.2 to Allow Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI 1-2 Pump Until 10th Refueling Outage, Scheduled to Begin 960408 ML20100E0051996-02-0505 February 1996 LAR 93-0003 to License NPF-3,revising Table 3.3-3 of TS 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation to More Accurately Reflect Design & Actuation Logic of Plant Sequencers & Undervoltage Relays ML20095F5861995-12-12012 December 1995 Application for Amend to License NPF-3,revising TSs Re Containment Sys ML20098C5131995-10-0202 October 1995 Application for Amend to License NPF-3,revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C1071995-09-29029 September 1995 Application for Amend to License NPF-3,modifying TS 3.4.3 & Associated Bases for Pressurizer Code Safety Valve Lift Setpoint Tolerances ML20098C3931995-09-29029 September 1995 Application for Amend to License NPF-3,revising Tech Spec 3/4.1.2.8, Reactivity Control Sys - Borated Water Sources - Shutdown, Tech Spec 3/4.1.2.9, Reactivity Control Sys - Operating & TS 3/4.5.1, ECCS - Core Flooding Tanks 1999-09-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20216E6051999-09-0707 September 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20210H0631999-07-28028 July 1999 Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, by Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4131999-07-27027 July 1999 Application for Amend to License NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G8831999-07-26026 July 1999 Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5251999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G4631999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumention & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20195F9121999-06-10010 June 1999 Application for Amend to License NPF-3,changing TS 3/4.6.4.4 Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20207E7861999-05-21021 May 1999 Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capability ML20205E4961999-03-19019 March 1999 Application for Amend to License NPF-3,requesting Withdrawal of Proposed New Action B to TS 3.6.5.2,previously Submitted in 981027 Application ML20204F1691999-03-0909 March 1999 Application for Amend to License NPF-3,adopting Changes in Frequency & Scope of Volumetric Exams Justified by W TR WCAP-14535A ML20196F3791998-11-30030 November 1998 Supplemental Application for Amend to License NPF-3, Proposing Changes to License Conditions 2.C(6) & 2.E by Transferring Operating Authority for DBNPS from Toed & Centerior Svc Co to Firstenergy Nuclear Operating Co ML20155E3181998-10-28028 October 1998 Application for Amend to License NPF-3,revising Various Sections of TS 6.0, Administrative Controls, Including Relocation of Contents of 6.11 to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E0701998-10-27027 October 1998 Application for Amend to License NPF-3,revising TSs 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation by Providing Potential Reduction in Spurious Trip Rate to Provide Cost Savings in Excess of $50,000 ML20155D7731998-10-27027 October 1998 Application for Amend to License NPF-3,relocating Existing TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8481998-10-27027 October 1998 Application for Amend to License NPF-3,revising Existing TS SRs 4.8.2.3.2.d,4.8.2.3.2.e,4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2811998-09-0808 September 1998 Application for Amend to License NPF-3,permitting Use of Framatome Cogema Fuels M5 Advanced Alloy Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2851998-09-0808 September 1998 Application for Amend to License NPF-3,revising TS Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20236G6461998-06-29029 June 1998 Application for Amend to License NPF-3,transferring Operating Authority for DBNPS from TE & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments Included ML20236R2301998-06-29029 June 1998 Resubmitted Application for Amend to License NPF-3, Transferring Operating Authority for DBNPS from Teco & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Safety Assessment & EA Included ML20217P8671998-04-24024 April 1998 Application for Amend to License NPF-3,modifying Existing TS 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases by Relocating Tables of Response Time Limits from TS to Plant USAR Technical Requirements Manual ML20217P8251998-04-24024 April 1998 Application for Amend to License NPF-3,clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20203L0861998-02-26026 February 1998 Application for Amend to License NPF-3 to Revise TS 3/4.4.5 & TS 3/4.4.6.2,incorporating New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2511997-12-23023 December 1997 Application for Amend to License NPF-3.Amend Changes TS Definitions 1.12,TS 3/4.9.5 & New TS 3.0.6 ML20197J5861997-12-23023 December 1997 Application for Amend to License NPF-3,revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2801997-08-26026 August 1997 Application for Amend to License NPF-3,clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2831997-08-26026 August 1997 Application for Amend to License NPF-3,modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5931997-07-29029 July 1997 Suppl 950929 to Application for Amend to License NPF-3, Change TS 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating & Associated Bases 3/4.4.2 & 3/4.4.3 ML20141F1051997-06-24024 June 1997 Application for Amend to License NPF-3,deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138A3201997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Conversion to 24-month Fuel Cycle ML20138C3131997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Rev to TS 3/4.7.6 to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20138M1251997-02-14014 February 1997 Application for Amend to License NPF-3,requesting Delay of Heat Removal Sys Valve Pit Surveillance Requirements ML20134D7461997-01-30030 January 1997 Application for Amend to License NPF-3,revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0561997-01-20020 January 1997 Application for Amend to License NPF-3,involving TS 3/4.5.3 Re ECCS Subsystems ML20132C7771996-12-13013 December 1996 Application for Amend to License NPF-3,authorizing Transfers of Control ML20132B6871996-12-11011 December 1996 Application for Amend to License NPF-3,revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle ML20134F1851996-10-28028 October 1996 Application for Amend to License NPF-3,requesting Revisions to 3/4.8.1.1,3/4.8.1.2,3/4.8.2.3,3/4.8.2.4 & 3/4.8 Re Electrical Power Systems ML20117P5301996-09-17017 September 1996 Application for Amend to License NPF-3,supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8441996-09-12012 September 1996 Application for Amend to License NPF-3,revising Reactivity Control Systems & Emergency Core Cooling Systems ML20117M1971996-09-0404 September 1996 Application for Amend to License NPF-3,App A,Modifying TS 6.2.3 by Removing Specific Overtime Limits & Working H from TS Consistent W/Nrc Recent Determination,On Generic Basis, That Limits Need Not Be Specified ML20116K2601996-08-0707 August 1996 Application for Amend to License NPF-3,changing Tech Specs 1.0, Definitions, Bases 3/4.0, Applicability & 3/4.6.2.1, Containment Sys - Depressurization & Cooling Sys - Containment Spray Sys ML20117K1871996-05-28028 May 1996 Application for Amend to License NPF-3,revising TS 3/4.3.1.1 RPS Instrumentation & TS 3/4.3.2.2 - Anticipatory RTS Instrumentation to Increase Trip Device Test Interval ML20107L3541996-04-18018 April 1996 Application for Amend to License NPF-3,requesting NRC Review & Approval to Use Alternate Electrical Lineup.Station Blackout DG as Standby Emergency Power Source to Supply Loads Normally Supplied by EDG 1,while Being Reworked ML20101M1601996-03-29029 March 1996 Application for Amend to License NPF-3,App A,Re Surveillance Requirements for Charcoal Filter Lab Testing to Revise Testing Methodology Used to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20101C6911996-03-0606 March 1996 Application for Amend to License NPF-3,revising TS 3/4.5.2 to Allow Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI 1-2 Pump Until 10th Refueling Outage, Scheduled to Begin 960408 ML20100E0051996-02-0505 February 1996 LAR 93-0003 to License NPF-3,revising Table 3.3-3 of TS 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation to More Accurately Reflect Design & Actuation Logic of Plant Sequencers & Undervoltage Relays ML20095F5861995-12-12012 December 1995 Application for Amend to License NPF-3,revising TSs Re Containment Sys ML20098C5131995-10-0202 October 1995 Application for Amend to License NPF-3,revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C1071995-09-29029 September 1995 Application for Amend to License NPF-3,modifying TS 3.4.3 & Associated Bases for Pressurizer Code Safety Valve Lift Setpoint Tolerances ML20098C3931995-09-29029 September 1995 Application for Amend to License NPF-3,revising Tech Spec 3/4.1.2.8, Reactivity Control Sys - Borated Water Sources - Shutdown, Tech Spec 3/4.1.2.9, Reactivity Control Sys - Operating & TS 3/4.5.1, ECCS - Core Flooding Tanks 1999-09-07
[Table view] |
Text
, - _ _
' ' ~
Docket Number 50-346 License Number NPF-3 Serial Number 2197 Enclosure Page 1 APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE NPF-3 DAVIS-BESSE NUCLEAR POVER STATION UNIT NUMBER 1 Attached are requested changes to the Davis-Besse Nuclear Power Station, Unit Number 1 Facility Operating License Number NPF-3. -Also included is the Safety Assessment and Significant flazards Consideration.
The proposed changes (submitted under cover letter Serial Number 2197) concern:
Appendix A, Technical Specification 2.1.2, Reactor Core Appendix A, Technical Specifics tion 2.2.1, Reactor Protection System Setpoints
/
Appendix A, Technical Specification Bases 2.1.1, and 2.1.2, Reactor Core i Appendix A, Technical Specification Bases 2.2.1, Reactor Protection System Instrumentation Setpoints Appendix A, Tc-hnical Specification 3.2.2, Power Distribution Limits, Nuclear Heat Flux Hot Channel Factor - Fg Appendix A, Technical specification 3.2.3,gPower Distribution Limits, Nuclear Enthalpy Rise Ilot Channel Factor F dl*
Appendix A, Technical Specification Bases 3/4.2, Power Distribution Limits Appendix A, Technical Specification 6 .1.7, Administrative Controls, Core Operating Limits Report By: /\ n N
_D. C. $helTc i, l$ebioNlice-PQn t , Nuclear Sworn and Subscribed before me this 18th day of March,1994.
YldSLAU .A --.
Notary /fublic, State of Ohio f
EVELYN L DRESS 9403290202 Y4031td ICI-PDR P
ADOCK 05000346 ppR 4 t@CmW4W'a' TWC. M OF0WO 9
s f
-r- - +- ,- n . m, -i s
d l
s a Docket Number 50-346 l; License Number NPF-3 Serial Number 2197 Enclosure ,
Page 2 The following information is provided to support issuance of the requested changes'to Davis-Besse Nuclear Power Station, Unit Number 1 Operating License Number.NPF-3, Appendix A,: Technical Specification ,
(TS) 2.1.2 (Reactor Core), TS 2.2.1 (Reactor Protection-System. .l i
Setpoints), Bases 2.1.1 and 2.1.2 (Reactor Core), Bases 2.2.1 (Reactor Protection System-Instrumentation.Setpoints), TS 3.2.2 (Power' Distribution Limits, Nuclear Heat Flux Hot Channel Factor - Fn), TS y 3.2.3 (Povgr Distribution Limits, Nuclear Enthalpy. Rise Hot Channel' l 1
Factor - F gg), Bases 3/4.2 (Pover Distribution Limits), and TS 6.9.1.7'(Administrative Controls, Core Operating Limits Report).
A. Time Required to Implement: This change-is-to.be implemented-within 90 days after-NRC issuance of the License Amendment.
B. Reason for Change (License Amendment Request Number 93-0004, Revision 0):
This application is submitted in accordance with Generic Letter 88-16,
" Removal of Cycle-Specific Limits from Technical Specifications",.
dated October 4, 1988 (Toledo Edison Log Number.2735), which' requires that, for removal of cycle-specific limits from the Technical Specifications, the limits be determined using an NRC approved:
methodology. On March 16, 1993,'the NRC staff approved Babcock and Vilcox (B&V) Topical Report BAV-10179P, " Safety Criteria and Methodology for. Acceptable Cycle Reload Analyses" (TAC No, M80189).
The NRC Safety Evaluation Report (SER) concludes that the inclusion of o
certain operating limits in a COLR is acceptable and thatL BAV-10179P is an acceptable TS reference for the B&V Fuel ~ Company methodology ,
used to establish the values of these limits. The operating limits-that may be placed in:the COLR include (but are not limited to):
nuclear heat flux hot channg1 factor limit (Fg), nuclear enthalpy. rise .
hot channel factor limit (F 6H), axial p ver Imbalance protective .
limits and trip setpoint for nuclear overpover based on RCS flow. The above referenced Technical Specification and Bases changes are-proposed to implement this guidance. j C. Safety Assessment and Significant Hazards Consideration: See
)
Attachment l
.l i
v vr,-- , - , , ~ --
. . .. . . . - . . . ~ . .
6
. a Docket Number 50-346 License Number NPF-3 Serial Number 2197 Attachment Page 1 SAFETY ASSESSMENT AND SIGNIFICANT HAZARDS CONSIDERATION
- FOR LICENSE AMENDMENT REQUEST NUMBER 93-0004 ,
TITLE: ,
Revision of Various Technical Specifications and Applicable Bases to Relocate Certain Cycle-Specific Protective Limits and Core Operating Limits to the Core Operating Limits Report ( COLR ) ..
DESCRIPTION:
The purpose of the proposed changes is to modify the Davis-Besse Nuclear Power Station (DBNPS) Operating License NPF-3, Appendix A Technical Specifications (TS) and associated Bases. The changes are -
described in detail below.
On March 16, 1993, the NRC staff approved Babcock and Wilcox (B&W)
Topical Report BAW-10179P, " Safety Criteria and Methodology for Acceptable Cycle Reload Analyses" (TAC No. M80189). The NRC Safety Evaluation Report (SER) concludes that the inclusion of certain operating limits in a COLR is acceptable and that BAW-10179P is.an ]
acceptable TS reference for the B&W Fuel Company methodology used to establish the values of these limits. The operating limits that may -
be placed in the COLR include (but are not limited to): nuclear heat ,
fluxhotchannegfactorlimit'(F), qnuclear enthalpy rise hot channel :
factor limit (F AH), axial power imbalance protective limits and trip setpoint for nuclear overpower based on RCS flow. The.following Technical Specification and Bases changes are proposed to implement this guidance:
Technical Specification 2.1.2, Reactor Core - - Remove' Figure 2.1 2, ;
Reactor Core Safety Limit,.from the TS and relocate it to the COLR. l This figure provides axial power imbalance protective limits for j various combinations of reactor coolant pump operation. Revise TS .)
2.1.2 to refer to the COLR instead of Figure 2.1-2, and clarify.that -l this figure is a " protective" limit rather than a " safety" limit. In i addition, revise TS 2.1.2 to delete reference to two reactor coolant-pump operation since reactor operation with fewer than three reactor ,
coolant pumps in operation is not permitted, and revise the Action '
statement to clarify that compliance with the requirements of Specification 6.7.2 is required.
Technical Specification 2.2.1, Reactor Protection System Setpoints - -
Remove Figure 2.2-1 Trip Setpoint for Flux .- AFlux/ Flow, from the TS and relocate it to the COLR. This figure provides trip setpoints for nuclear overpower based on reactor coolant system (RCS) flow.
Revise Table 2.2-1, Reactor Protection System Instrumentation Trip
.Setpoints, Functional Unit 4, to refer to the COLR instead of Figure 2.2-1 and to remove the reference to footnote "#" since the allowable valuen for Functional Unit 4 will be in the COLR.
'l
4 Docket Numb'er 50-346 ,
License Number NPF-3 Serial Number 2197 Attachment Page 2 Bases 2.1.1 and 2.1.2, Reactor Core, and Bases 2.2.1, Reactor Protection System Instrumentation Setpoints - - In the fourth paragraph on page B 2-1, remove the references to the hot channel factor values. In the first paragraph on page B 2-2, refer to the COLR in lieu of Figure 2.1-2, refer to the COLR in lieu of a specific Fg value, refer to the COLR in lieu of a specific kw/ft limit and define a protective limit. In the third paragtsph on page B 2-2, refer to the COLR in lieu of Figure 2.1-2. On page B 2-5, delete the discussion of examples of typical power level and low flow rate combinations for the pump situations of Table 2.2-1 (since Figure 2.2-1 is relocated to the COLR, these examples are no longer pertinent). In the first paragraph on page B 2-6, refer to the COLR in lieu of Figure 2.2-1.
Technical Specification 3.2.2, Power Distribution Limits, Nuclear Heat j Flux Hot Channel Factor - F - - Remove the F limit relationship '
specifiedintheTSandre1Ocateit totheCobR, revising the Limiting Condition for Operation (LCO) to read: "F shall be within the limits specifiedintheCoreOperatingLimitsRepOrt."
Technical Specification 3.2.3, PowergistributionLimits, Ngclear Enthalpy Rise Hot Channel Factor - (F AH) -- em ve e (F 6H I limit relationship specified gin the TS and relocate it to the COLR, j revising the LCO to read *(F ) shall be within the limits specified1 intheCOREOPERATINGLIMITSkkPORT."
Bases 314.2. Power Distribution Limits - . Associated with the above TS changes, on page B 3/4 2-2, refer to the COLR in lieu of specific hot channel factor limits.
Technical Specification 6.9.1.7, Administrative Controls, Core ;
Operating Limits Report - - Add references to TS 2.1.2, 2.2.1, 3.2.2 l and 3.2.3 ter core operating limits to be established and documented in the COLR. Replace the present discussion of analytical methods and listing of topical reports with the following:
The analytical methods used to determine the core operating limits addressed by the individual Technical Specifications shall be those previously reviewed and approved by the NRC, as described in BAW-10179P-A, " Safety Criteria and Methodology for Acceptable Cycle Reload Analyses", or any other new NRC-approved analytical methods used to determine core operating limits that are not yet referenced in.the applicable BAW-10179P-A revision.
The applicable BAW-10179P-A revision (the approved revision at the time the reload analyses are performed) shall be listed in the CORE OPEfATING LIMITS REPORT. The CORE OPERATING LIMITS REPORT shall.also list any new NRC-approved analytical methods used to determine core operating limits that are not yet referenced in the applicable BAW-10179P-A revision. '
Docket. Number 50-346 License Number NPF-3 Serial Number 2197
' Attachment Page 3 Technical Specification 6.7, Safety Limit Violation. TS 6.5.1.6, Station Review Board (SRB) Responsibilities, and TS Index - - Actions have been.added in a new Technical Specification 6.7.1.2 to address
.the actions to be taken in the event the protective limit (formerly identified as a safety limit) of revised Technical Specification 2.1.2 is violated. Technical Specification 6.5.1.6.n has been revised to reflect the SRB's responsibility to review the Protective Limit Violation Report. .The TS Index has been revised to incorporate the new specification.
SYSTEMS COMPONENTS, AND ACTIVITIES AFFECTED:
The proposed Technical Specification changes involve cycle-specific reactor core operating limits. Core operating limits are determined using analytical methods that have been previously reviewed and approved by the NRC.
SAFETY FUNCTIONS OF THE AFFECTED SYSTEMS, COMPONENTS AND ACTIVITIES:
The core operating limits are determined so that all applicable limits -
(e.g. fuel thermal-mechanical limits, core thermal-hydraulic limits, Emergency Core Cooling System (ECCS) limits, and nuclear limits,.such as shutdown margin and transient and accident analysis limits) of the-safety analyses are met.
EFFECTS ON SAFETY:
As stated above, the NRC staff has approved the Babcock and Wilcox (B&W). Topical Report BAW-10179P. The NRC Safety Evaluation Report (SER) associated with approval of this topical report concludes that inclusion of certain operating limits in a Core Operating Limits Report (COLR) is acceptable and that BAW-10179P is an acceptable Technical Specification reference for the B&W Fuel Company methodology used to establish the value of these limits.
Relocation of cycle-specific core operating limits to the Core Operating Limits Report (COLR) as proposed by this license amendment request, including the nuclear heat flux hot channel factor 11mit N
(F , the nuclear enthalpy rise hot channel. factor limit (F , the axha)lpowerimbalanceprotectivelimits,andthetripsetpoikk)for nuclear overpower. based on RCS flow, is an administrative change and will not impact the methodology used to determine the limits.
Further, the NRC SER associated with approval of BAW-10179P explicitly includes these limits among those that may be placed in the COLR.
Accordingly, there is'no adverse.effect on safety.
The proposed changes to the Bases TS 6.5.1.6, TS 6.7, TS 6.9.1.7 and the TS Index are also administrative changes and have no adverse effect on safety.
~ ~- . -,- , . .. ~ - . _ . - . - . .- .. . _
~ - .. . .--.
~
ocket Number'50-346 i License Number _NPF-3 Serial Number 2197 l Attachment-Page 4
'l SIGNIFICANT HAZARDS CONSIDERATION:
The Nuclear Regulatory Commission has provided standards in 10CFR 50.92 (c) for determining whether a significant hazard exists due to a ;
proposed amendment to an Operating License for a facility. A proposed amendment involves no significant hazards if operation.of the facility in accordance with the proposed changes would: (1) Not involve a significant increase in the probability or consequences of an accident previously evaluated (2) Not create the possibility of a new or different kind of accident from any previously evaluated: or (3) Not involve a significant reduction in a margin of safety. Toledo Edison has reviewed the proposed changes and determined that a significant hazards consideration does not exist because operation of the Davis-Besse Nuclear Power Station in accordance with these changes would:
la. Not involve a significant increase in the probability of an accident previously evaluated because no accident initiators, assumptions or probabilities are affected by the proposed relocation of cycle-specific core operating limits to the Core operating Limits Report.
lb. Not involve a significant increase in the consequences of an ,
accident previously evaluated. The proposed changes do not affect any equipment, accident conditions, or assumptions which could lead ~to a=
significant increase in radiological consequences.
2a. Not create the possibility of a new kind of accident from any accident previously evaluated because no new accident initiators are introduced by these proposed changes.
2b. Not create the possibility of a different kind of accident from ,
any accident previously evaluated because no different accident t]
initiators are introduced by these proposed changes.
- 3. Not involve a significant reduction in a margin of safety because j the proposed changes only relocate cycle-specific core operating 1 limits to the Core Operating Limits Reports they do not allow less conservative operating limits. The analytical methods to be used in l 4-the determination of cycle-specific core operating limits are -J previously approved by the NRC. The same margin of safety provided'in ;
the current Technical Specifications will continue to be maintained. ;
CONCLUSION:
On the basis of the above, Toledo Edison has determined that the
+
License Amendment Request does not involve a significant hazards consideration. As this License Amendment Request' concerns proposed changes to the Technical Specifications that must be reviewed by the Nuclear Regulatory Commission, this License Amendment Request does not constitute an unreviewed safety question.
ATTACHMENT: -
l Attached are the proposed marked-up changes to the Operating License. J