Final Deficiency Rept Re Incorrectly Fabricated Structural Steel.Initially Reported on 820610.All pre- & post-installed Deficiencies Corrected by Newberg-Marble Hill
ML20064N259
Person / Time
Site: Marble Hill
Issue date: 02/08/1983
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-14, SVP-0009-83, SVP-9-83, NUDOCS 8302160164
Download: ML20064N259 (2)


Text

!

_ a  !

PUBLIC SERVICE INDIANA February 8, 1983 n rv P sident -

Nuclear Division Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 10, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). While refurbishing structural steel, it was discovered that several pieces of structural steel had been incorractly fabricated. The deficiencies involved were out of tolerance edge distance, spacing, and size of bolt holes and excessive weld undercut.

The out of tolerance deficiencies had not been discovered previously because they were concealed by connection attachments (clip angles) which were removed during refurbishing. The excessive weld undercut deficiencies were not a previous inspection attribute.

It was determined that bolt hole size, spacing and edge distance are only of concern for sliding type connections and not friction type connections. The steel erector, Newberg-Marble Hill, has inspected and, if necessary, repaired the structural steel in question prior to its erection in accordance with their procedures WPN 5, WPN 5.02, WPN 26, WPN 26.01 and associated quality control procedures. Also, similar structural steel members previously erected have been inspected and, if necessary, repaired in accordance with the aforementioned procedures.

This letter is intended to fulfill the requirements of a final report as defined in 10 CFR 50.55(e).

8302160164 830208 gDRADOCK05000 ]O FEB 10 1983 -

P. O. Box 190, New Washington, Indiana 47162 812. 289 .1000

.PUBUC SERVICE INDIANA Letter: J. G. Keppler ' February 8, 1983-S82-14 SVP-0009-83 If you have any questions regarding this matter, please contact me at your convenience.

Sincerely,

/ ,

S. W. Shields SWS/LGY/bak cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. J. Harrison

,