ML20064N301

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1982
ML20064N301
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/30/1982
From: Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20064N293 List:
References
NUDOCS 8209080302
Download: ML20064N301 (7)


Text

. .

OPERATING DATA REPORT DOCKET NO. J0-331 SO DATE _J .Cook C051PLETED BY Rt_.).982 TELEPilONE 131313.42-3840 OPFRAllNG STATUS Note 5

1. Unit Name:

FitzPatrick

2. Reporting Period:

820801 - 820831

3. Licensed Thermal Power (51Wt):

2436

4. Nameplate Rating (Gross 51We):

883 821

5. Dnign Electrical Rating (Net 51We):
6. Sf aximum Dependable Capacity (Gross SlWe): 830
7. Sf aximum Dependable Capacity (Net 51We). 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,Gise Reasons:
9. Power Lesel To Which Restricted,If Any (Net 51We). NONE
10. Reasons For Restrictions,if Any:

This 51onth Yr.-t o-Da t e Cumulatise i1. Ilours In Reporting Period 744 5831 6210E__

744 4162.4. 43713.6

12. Number Of flonrs Reactor Was Critical 0 0 0
13. Reactor Resene Shutdown flours 42503.2 744 4059.6
14. Ilours Generator On-Line 0 0 0
15. Unit Resene Shutdown llours 1791480 9321336 87722650
16. Gross Thermal Energv Generated (5f WII) 590440 3165440 2992605.0_
17. Gross Electrical Energy Generated (51Wil, 573130 3071200 28975930
18. Net Electrical Energy Generated (51Wil)
19. Unit Senice Factor 100% 69 . 6*L 68J%

100% 69.6% 68.3%

20. Unit Asailabihty Factor
I Unit Capacits Factor IUsing $1DC Net) 95 2 _ 65.0% 61J%

93.8%_ 64.2% 56.7%

Unit Capacity Facior IUsing DER Net! 15.8%
23. Unit Forced Outage Rate 0% 3.3%
1 Shutdowns Scheduled Oser Next 6 51onths (Type. Date.and Duration of Each Maintenance outa_ge scheduled for 29 Octoher_1982 for n period _of 10 days.
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Omts in Test Status IPrior io Commercial Operation): l' orecast Achiesed INillA L CRITICAllrY INITI A L ELECT RICITY CON 151ERCI A L OPER ATION 8209080302 820903 PDR ADOCK 05000333 R pon

AVER AGE DAILY UNIT POWER LEVEL DOCKETf0. 50-333 UNIT JAFNPP DATE September 1982 CON!Pl.ETED BY J. Cook TELEPilONE (315)342-3840 MONm AUGUST, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POW.5R L EVEL (MWe Net) (MWe Net) 774 17 775 2 773 18 775 3 776 19 775 4 575 20 774 5 755 21 777 6 772 22 780 7

773 23 782 s

774 24 784 9 775 25 782 '

10 773 26 785 ji 775 27 783 12 774 785 28 13 774 29 707 34 774 3o 787 15 775 3 786 16 775

SUMMARY

Unit operated at near 1007. rated thermal powe.r for this reporting period. On August 4, 1982 power was i reduced due to unidentified leakage in the drywell.

D

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-333 UNIT N AME JAFNPP DATE Sept. 1982 COMPLETED BY J_ Cook REPORT MONTil Aunust TELEPilONE (315T 167_1940 r.

C P8  %

EU #"'#

g4 Cause & Currectise N. . . Dat e E.

y k$

32

.  ?

.c g ec Event h'"E g gg Action to Report a mV l

CO  % i E7) j C

g Prevent Recurrence

\

C l

NONE -

I 2 3 4 F: Forced Reason: Method: Exhibit G Instructio,*s S: Sched uled A Equipment Failure (Explain) 1 -Manual for Preparation of Dati B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Repori (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & License Examination F- Administ rative 5 G Operationat Error (Explain) Exlubit I Same Source 11 Othe r ( E xplain) -

i I

r I

POWER AUTHORITY OF THE STATE OF NEW YORK i JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE AUGUST, 1982 The unit operated at near full thermal power during this reporting period.

Power was reduced on 820804 due to unidentified leakage in the drywell.

At the end of the reporting period the unit is operating at approximately 786 Mwe.

I f

- , - -, ,-,,--a,--w-- .. - ,., - - .- - - - - - - -

. - - - - - . ,...n,---.~,-a,,.v.-. . . - - . -.-----,g a-,,, ..-- - ,---n- , , . - - , ,n,,,.

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

AUGUST 1982 DATE SYSTEM REO S HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ,

7/14 01-107 11336 OPS Leaking joints Torqued joints 9  :

Off-gas drying tower

'u' 7/10 03 20492 OPS Dried packing cup Replaced valve 3 HCU-46-19 on III valve 7/14 03 18407 OPS Dried packing 'u' cup Replaced valve 1 HCU-42-47 on III valve 7/14 03 14345 OPS Dried packing 'u' cup Replaced valve 1 HCU-30-43 .,on III valve 7/14 03 21864 OPS Dried packing 'u' cup Replaced value 1 HCU-22-07 on III valve

, 7/13 03 20488 OPS Air leaks due to loose Torqued cover plates 8 HCU-42-15 cover plate on 117 and 118 valves 7/15 03 19649 OPS Directional' control Replaced directional control 3 HCU-02-23 valve stuck open valve 123 7/13 27 11223 N/A N/A Installed hanger for conduit 6 Mod fl-81-19 1CC098AA per ECR 81-19-00c 7/15 27 14304 SURVEILLANCE Drifting module RP-2C Replaced per J.Cronk Tech. 54 RM-104A Services 7/21 66 18525 OPS Fitting leak Re-swept elbow 4 SOV-100A

, , . - POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

. SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

AUGUST 1982 0" I DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 0 ENT 7/9 70 21990 OPS Low oil pressure due Overhauled compressor 160 RWC-2B to worn internals 7/9 71 14839 N/A Preventative Cleaned cells, cleaned inter-cell 126 LPIC maintenance connectors, added water Battery i

8/4 08 16399 VISUAL Aged hoses cracked Replaced hoses 6 Refuel Bridge 7/27 24 16417 OPS Bent linkage Replaced link arms 12 EOD-2 7/28 24 16226 OPS Broken latch bolt Replaced latch bolt 2 EOD-2 7/28 24 17713 OPS Electric interlock Replaced electric door strike, 18 EOD-1, 2 inoperable due to door latch release coil, switches misuse S15, 16, 17 & 18 i

8/5 71 14846 PREVENTATIVE Preventative Cleaned battery 30 SB-1A, B MAINTENANCE maintenance

_ . - _ _ - _ . . _ _ - - - . - - ..-- ~ _--._. - . _ _ _-_ _. . _ . _ . - , _ - _ _ - _ - . _ _ . _ - _ _ . _ _ _ ___ _

POWER AUTHORITY OF THE STATE OF NEW YORK

! JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

MAINTENANCE

SUMMARY

f I&C August 1982 DATE SYS TEM E ES # ^ E CO NENT HOW DETECTED O MA FU C ON MA C1 j 20875 j 8/17 Out of Out of Adjusted core 07 D-Tip JIC adj ustment adjustment top and bottom 10 ,

limits  !

Defective X-Y plotter Replaced 20876 switch and not i

8/20 07 A-Tip JIC switch and i

relay operational relay 25 Loss of 20879

! 8/4 11 ll-14A OPS Age of bulb continuity Replaced light alarm bulb 10 Pressure 20992 valve did not 8/25 allow flow to switch not Repaired valve 20 13 LS'77B -

JIC switch working i 20394 Defective Can't calibrate Replaced 8/31 17 Spare RM electronic / erratic defective I&C components 62 comoonents 20823 8/30 17 Misc RMS I&C N/A Inspected for N/A loose relays 3 20946 Relay partly Hi-Hi trip Inserted relay i8/11 17 RIS-456B JIC ut of would not and calibrated 1 socket function ,

i 21883 Flat spot on Indicating up t

8/9 23 LR=202B OPS drive wheel scale C*fd a

' calibrated 18 12931 Out of Switch doesn't Adjusted for 4

8/18 76 76C-ll OPS adj ustment control pressureproper operatior. 60 20925 Pressure Not starting at 8/24 93 Cl-Air Com OPS ggfgatorreads proper pressure Calibrated indicator 34 4

.-