Special Rept 94-03:on 940216,fire Barrier Wall Between Unit 1 & 2 Board Rooms on Elevation of Auxiliary Bldg Breached & LCO 3.7.12 Entered.Patrol Will Be Maintained Until Mod Completed & Wall Reestablished as Functional Fire Barrier
ML20064N210
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/22/1994
From: Powers K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
94-03, 94-3, NUDOCS 9403290214
Download: ML20064N210 (3)


Text

.....-

i A

wneste va. gem, tw one naarm sm oa s, rennessee 373n r

March 22, 1994 i

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Centlemen:

In the Matter of

)

Docket Nos. 50-327 l'

Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PIANT (SQN) - UNITS 1 AND 2 - FACILITY OPERATING LICENSES DPR-77 AND DPR TECHNICAL SPECIFICATION (TS) 3.7.12 -

SPECIAL REPORT 94-03 i

i The enciesed special report provides details concerning Fire Barrier Wall A8 in the auxiliary building between the Unit 1 and Unit 2 480-volt i

board rooms being breached and nonfunctional as a fire barrier for a period greater than the allowable TS timeframe.- This report is being submitted in accordance with TS Action Statement 3.7.12(a).-

If you have any questions concerning this submittal, please telephone C. H. Whittemore at (615) 843-7210.

Sincerely,

'en Powers Site Vice President I

Enclosure cc: See page 2 0

/

n W ds2,96224veas 22

-[DR-ADOCK 05000327,,

PDR

- - - -.. = -.

1 s'

U.S. Nuclear Regulatory Commission Page 2 March 22, 1994 cc (Enclosure):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission

-One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 s

7 S

5.

  • I l

^ d' j.

l 1

1 ENCLOSURE l

SEQUOYAll NUCLEAR PLANT UNITS 1 AND 2 SPECIAL REPORT 94-03 1

AUXILIARY BUILDING FIRE BARRIER WALL A8 l

Descrip.tlon of Condition On February 16, 1994,'with Unit 1 in Mode 5 coming out of a refueling outage and Unit 2 in Mode 1, the fire barrier wall between the Unit 1 and Unit 2 480-volt board rooms on Elevation 749.0 of the auxiliary building was breached, and Limiting Condition for Operation (LCO) 3.7.12 was entered.

-]

Cause of Condition i

A design change notice (DCN) modification involving the installation of heating and ventilating ductwork is being implemented. This DCN requires j

the breaching of Fire Barrier Wall A8 between the Unit 1 and Unit 2 i

480-volt board rooms on Elevation 749.0 of the auxiliary building. The j

breach will be necessary until the installation of the ductwork and-the i

associated fire damper and the testing of the system are completed. The time necessary to accomplish'this exceeded the timeframe allowed by Technical Specification 3.7.12.

Cntr.ccliYn_ Action the fire detectors on one side of the nonfunctional fire barrier was In accordance with LC0 3.7.12~ Action Statement (a), the operability of i

verified, and an hourly fire patrol was established to inspect the area q

affected by the breach. The patrol will be maintained until the modification is completed, the wall is reestablished as a functional fire j

barrier, and LCO 3.7.12 is exited.