Text
.....-
i A
wneste va. gem, tw one naarm sm oa s, rennessee 373n r
March 22, 1994 i
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Centlemen:
In the Matter of
)
Docket Nos. 50-327 l'
Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PIANT (SQN) - UNITS 1 AND 2 - FACILITY OPERATING LICENSES DPR-77 AND DPR TECHNICAL SPECIFICATION (TS) 3.7.12 -
SPECIAL REPORT 94-03 i
i The enciesed special report provides details concerning Fire Barrier Wall A8 in the auxiliary building between the Unit 1 and Unit 2 480-volt i
board rooms being breached and nonfunctional as a fire barrier for a period greater than the allowable TS timeframe.- This report is being submitted in accordance with TS Action Statement 3.7.12(a).-
If you have any questions concerning this submittal, please telephone C. H. Whittemore at (615) 843-7210.
Sincerely,
'en Powers Site Vice President I
Enclosure cc: See page 2 0
/
n W ds2,96224veas 22
-[DR-ADOCK 05000327,,
- - - -.. = -.
1 s'
U.S. Nuclear Regulatory Commission Page 2 March 22, 1994 cc (Enclosure):
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission
-One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 s
7 S
5.
- I l
^ d' j.
l 1
1 ENCLOSURE l
SEQUOYAll NUCLEAR PLANT UNITS 1 AND 2 SPECIAL REPORT 94-03 1
AUXILIARY BUILDING FIRE BARRIER WALL A8 l
Descrip.tlon of Condition On February 16, 1994,'with Unit 1 in Mode 5 coming out of a refueling outage and Unit 2 in Mode 1, the fire barrier wall between the Unit 1 and Unit 2 480-volt board rooms on Elevation 749.0 of the auxiliary building was breached, and Limiting Condition for Operation (LCO) 3.7.12 was entered.
-]
Cause of Condition i
A design change notice (DCN) modification involving the installation of heating and ventilating ductwork is being implemented. This DCN requires j
the breaching of Fire Barrier Wall A8 between the Unit 1 and Unit 2 i
480-volt board rooms on Elevation 749.0 of the auxiliary building. The j
breach will be necessary until the installation of the ductwork and-the i
associated fire damper and the testing of the system are completed. The time necessary to accomplish'this exceeded the timeframe allowed by Technical Specification 3.7.12.
Cntr.ccliYn_ Action the fire detectors on one side of the nonfunctional fire barrier was In accordance with LC0 3.7.12~ Action Statement (a), the operability of i
verified, and an hourly fire patrol was established to inspect the area q
affected by the breach. The patrol will be maintained until the modification is completed, the wall is reestablished as a functional fire j
barrier, and LCO 3.7.12 is exited.
4 1
J