Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065D784 + (00:56:02, 17 December 2024)
- ML20065D770 + (00:56:03, 17 December 2024)
- ML20065D769 + (00:56:03, 17 December 2024)
- ML20065D767 + (00:56:04, 17 December 2024)
- 05000369/LER-1982-068-03, /03L-0:on 820820,during Insp of Fire Barrier Penetrations,Personnel Discovered Fire Retardant Matl Not Installed in Fire Stop Penetration.Caused by Const Oversight.Fire Stop Sealed & Declared Operable on 820823 + (00:56:05, 17 December 2024)
- 05000369/LER-1982-068, Forwards LER 82-068/03L-0 + (00:56:09, 17 December 2024)
- 05000259/LER-1982-065-03, /03L-0:on 820827,during Normal Operation While Performing Liquid Effluents Release Procedure,Discharge Isolation Setpoint Not Set as Required.Caused by Inadequate Instructions for Setpoint Verification + (00:56:14, 17 December 2024)
- ML20065D738 + (00:56:15, 17 December 2024)
- 05000259/LER-1982-065, Forwards LER 82-065/03L-0 + (00:56:16, 17 December 2024)
- BECO-90-108, Forwards Anticipated Operator Licensing Exam Schedule Requested by Generic Ltr 90-07, Operator Licensing Natl Exam Schedule, + (00:56:16, 17 December 2024)
- 0CAN039402, Forwards Certificates of Insurance Issued to Util as Evidence of Primary & Excess Onsite Property Damage Insurance Coverage for Ano,Per 10CFR50.54(w)(3) + (00:56:17, 17 December 2024)
- ML20065D711 + (00:56:18, 17 December 2024)
- ML20065D667 + (00:56:19, 17 December 2024)
- ML20065D662 + (00:56:19, 17 December 2024)
- ML20065D660 + (00:56:20, 17 December 2024)
- LIC-90-0745, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-32.Corrective Actions:Enhancements Made to Facility Mod Procedures & Engineering Instructions + (00:56:21, 17 December 2024)
- ML20065D658 + (00:56:21, 17 December 2024)
- ML20065D650 + (00:56:22, 17 December 2024)
- ML20065D645 + (00:56:23, 17 December 2024)
- ML20065D635 + (00:56:24, 17 December 2024)
- ML20065D633 + (00:56:25, 17 December 2024)
- ML20065D634 + (00:56:25, 17 December 2024)
- ST-HL-AE-3577, Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule + (00:56:26, 17 December 2024)
- 05000254/LER-1994-004-04, :on 940228,results of Feedwater Flow Testing Found Flow Indications in Nonconservative Direction.Cause Not Determined.Management Issued Special Instructions.W/ + (00:56:28, 17 December 2024)
- 05000366/LER-1994-002-01, :on 940301,during Monthly Operability Test of HPCI Thrust Bearing Temp Increased to 437 F & Decreased Below 200 F.Caused by Mfg Error in Thrust Bearing Housing. Failed Bearing & Gear Coupling Replaced + (00:56:30, 17 December 2024)
- JAFP-90-0697, Cycle 10 Startup Testing Rept + (00:56:31, 17 December 2024)
- 1CAN099009, Monthly Operating Rept for Aug 1990 for Arkansas Nuclear One Unit 1 + (00:56:32, 17 December 2024)
- ML20065D596 + (00:56:33, 17 December 2024)
- ML20065D601 + (00:56:33, 17 December 2024)
- ML20065D582 + (00:56:34, 17 December 2024)
- 05000382/LER-1994-003-01, :on 940305,discovered Reactor Protection Inoperable Due to Missed Surveillances.Caused by Omission of Relevant Info from Procedures.Procedures Revised & Personnel Debriefed + (00:56:36, 17 December 2024)
- ML20065D567 + (00:56:37, 17 December 2024)
- ML20065D551 + (00:56:37, 17 December 2024)
- ML20065D549 + (00:56:39, 17 December 2024)
- ML20065D546 + (00:56:40, 17 December 2024)
- ST-HL-AE-3570, Forwards Rev 5 to, South Texas Project Unit 1 Pump & Valve Inservice Test Plan + (00:56:41, 17 December 2024)
- ML20065D544 + (00:56:41, 17 December 2024)
- ML20065D533 + (00:56:42, 17 December 2024)
- ML20065D530 + (00:56:43, 17 December 2024)
- ML20065D526 + (00:56:44, 17 December 2024)
- ML20065D510 + (00:56:44, 17 December 2024)
- ML20065D507 + (00:56:45, 17 December 2024)
- ML20065D495 + (00:56:45, 17 December 2024)
- ML20065D493 + (00:56:46, 17 December 2024)
- TXX-9032, Supplemental Deficiency Rept CP-87-63 Re Pipe Weld Insp Criteria.Initially Reported on 870922.Util Determined That Reverification of Inps Not Required for Unit 2.New Unit 2 Installations Will Continue Per Radial Weld Shrinkage + (00:56:47, 17 December 2024)
- ML20065D490 + (00:56:48, 17 December 2024)
- ML20065D487 + (00:56:48, 17 December 2024)
- ML20065D480 + (00:56:49, 17 December 2024)
- ML20065D442 + (00:56:50, 17 December 2024)
- ML20065D467 + (00:56:50, 17 December 2024)
- ML20065D424 + (00:56:51, 17 December 2024)