MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
.
? -' .
,c ---. - ,. , Commonwealth Edison
. . Byrtn Nucliar Stati:n Cr 4450 N:rth GIrman Church R:ad <
Byron, Illinois 61010 September 10', 1990 LTR:- BYRON 90-0890 FILE: 2.7.200 Director, Office of Management Information j and Program Control United States Nuclear Regulatory Commission j Washington, D.C. 20555 ;
f ATTN - Doctubent Control Desk ,
Y Gentlemen Enclosed for your information is the Monthly Performance Report covering !
Byron Nuclear Power Station for the period August 1 through August 31, 1990. '
i i
Sincerely, hk - ;
R. Pleniewicz Station Manager !
Byron Nuclear Power Station i
RP/m1m (0625M/0062M) cci A.B. Davis, NRC, Region III NRC Resident Inspector Byron Ill. Dept. of Nuclear Safety i M. J. Wallace/K.L. Graesser
. Nuclear. Licensing Manager Nuclear Fuel Services, PWR Plant Support D. R. Eggett, Station Nuclear Eng]neering INPO Records Center T. Boyce - USNRC a on . ..
Js Y05)
Qe 31 est 16 zy Ap 4,
1
.i
-l
,. BYRON NUCLEAR POWER STATION .
.l UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT s
l COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 HRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 !
.8
~
l 1
(0625M/0062M/1)
._7, .. _ y _ _ -
L t
. I t
y I. -anagly,_ Report for_Ryxea.pNIT 1 for.t L agath of August'1990_
~
At Ausmary_of .OgtIAting hpe.tmgg,.fgr Unit 1 :
t'he unit began- this reporting feriod in Mode 1 (Power Operation) at' !
approximately 97% power.- On August 19,-during a heavy thundSrstorm with ligttning,!init I reactor-trip.cccurred from an automatic RPS signal of -j
" Power Range Flus Negative Rate.High Reector Trip." On August 20 at 1132. !
the Unit was critical and at.1425 the Unit .was synchronised.1- The unit . -} .
operat66 at power levels c1 up to '100% for, thol remainder of the month. ;
.I by i !
i r
t
.)
2 I
e !
r a
F 5
l !
.1 f
?
' It
. k
-i L
t L. .j l.
I
~
4 i- I 1 .?
i 1, ,i 1
(0625M/0062M/1)
- p. ;
I?
~
_. . e ,
c_----________ .
. w L DfERAlltiG_Dja' EEPORT DOCKET NO. 050-454 UNIT: Byron One DATE: 09/10/99 COMPILED BY K. Orris TELEPHONE: (815)234-5441 x2444 OPERATING STATUS
- 1. Reporting Period: August, 1990. Gross Hours: 744
- 2. Currently Authorized Power Levels 3411 (MWt)
Detign Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restrict'ed (If Any): N/A
- 4. Reasons for Restriction (If Any):- !
THIS MONTH YR TO DATE- CUMULATIVE *
- 5. Report Period Hrs. 744 5,831 43,464
- 6. Rx Critical Hours 712.9 4,247.1- 34,787.1
- 7. Rx Reserve Shutdown Hours 0 0 38
- 8. Hours Jenerator on Line 710.1 4,170.1 34,264.1
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MMH) 2,112,190 12,536,741- 103,797,181
- 11. Gross Elec. Energy (MWH) 711,154 4,244,684 34,989,102
- 12. Het Elec. Enetgy (MWH) 673,396 -3,994,539 32,972,571
- 13. Reactor Service factor 95.8 72.8 80.0
- 14. Reactor Availability rector 95.8- 72.8 80.1
- 15. Unit Service Factor 95.4 71.5' 78.8
- 16. Unit Availability Factor 95.4 71.5 78.8
- 17. Unit Capacity Factor (MDC net) 81.9 62.0 68.7
- 18. Unit Capacity Factor (DER net) 80.8 61.2 67.7
- 19. Unit Forced Outage Hrs. 33.9 171.9 1,228.9
- 20. U. tit Forced Outage Rate 4.5 3.9 3.5
- 21. Shutdowns Scheduled Over Next 6 Monthst None
- 22. If Shutdown at End of Report Period. Estimated Date of Startupt
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power-generated prior to commercial service.
(0625M/0062M/3)
V
4
.C. ... AVR4GLDAILY Ul(IT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byroa One DATE: 09/10/90 COMPILED BY: K. nrris TELEPHONE: '
~v> t-5441
<2446 MONTH: August, 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Het)
- 1. 9&LNW 16. 1027 MW k
- 2. 1028 MW 17. 1057 MW
- 3. 1089 MW 10. 1Q11 MW
- 4. 1065 MW 19. 169 MW
- 5. 92LMW 20. 73 MW 6, 1013 MW 21, 242 MW
- 7. 101h_HW 22. 540 MW B. .973 MW 23. 848 MW
- 9. 985 MW 24. 1017 MW
- 30. 9BLNW 25. 1012._)iw _
- 11. 1Q12 MW 26. 955 MW
- 12. 919._MW 27, 1Q$1_NW
- 13. 1019 MW 2 8 . __, __ 1022 MW
- 14. .10$1_MW 29. 89E_MW
- 15. 1DALMN 30. . 90LNW !
- 31. 1001 MW INSTRUCTIONS
. On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is ussd for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)- In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M/4)
ju -
- R; port Period August, 1990 UNIT SEUTDOWNS/ REDUCTIONS (UNIT 1) **************************
No. Date T70e boursReasonMethod LER Number System Connonent Cause & Corrective Action to Prevent Recurrence S. 08/19/90 F 33:59 A 3 RD During a heavy thunderstorm with lightning Unit 1 Rz trip occurred from an automatic RPS signal of "PWR Range Fluz Negative Rate High Rz Trip."
croce s * * * * * * * * *
TYPE _.,_ Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Geram Preparation of l
l D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced ~oad Licensee Event Report
& License Examination 9-Other (LER) File (NG::"G-0161)
I (06 25M/0062M/ 5 )
.- ---_m. ,_ . . . .
l i
a ,,11RIQLII RKEQEI1Hf e REQLllREtiEKIS (UNIT 1) for the moath of August 199Q I
- 1. Safety / Relief valve operations for Unit One.
. VALVES- NO & TYPE PLANT, DESCRIPTION.
DATE ACTUATED AC211ATIII[ CMDITIN OF EVENT
'l i None
- 2. Licensee generated changes to ODCM. (Y/N ).
No .
1 E
- 3. Indications of failed fuel. (Y/N).
"' Fuel Reliability Indicator: FRI'm 1.5E-4 pCi/cc ,
l l
4 j
(0625M/0062M/6)
4 9
F... LI. Cell 1EE_EYElfl_SEPORTS (URIT 1)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, August 1.through August 31, 1990. This;information is.provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
-Occurrence Licentee . Eve.at_. Report Number D.ain Title of occurrence 90-009 7/14/90 Missed sample required by an inoperable radiation monitor due to mis-communication and Personnel error.
i l
I (0625M/0062M/7)
- _ ________._.m.___J
3- 3 1
q l
6 f II . )19.gthly Repgrt for Byron UNIT 2 for the month of Anoust 1990 l A. Sa= = ry of Operatina Experience for Unit 2 'l t
The unit began this reporting period in Mode 1 (Power Operation).at.
approximately 58.6% power. The' unit is in coastdown'in preparation for . ,
'its refueling outage scheduled for September.
t.
i j
f
'f l
i e
T 1
+
.I 1
a f
5 k
i r
~t b
i k
5
+
(0625M/0062M/8)
P
B. OffEAllllG DATA REPORI DOCKET NO. 050-455 UNIT: Byron Two DATES- 09/10/90 COMPILED BY: K. Orris TELEPHONE: (815)234-5441 x2444 OPERATING STATUS
- 1. Reporting Period: August, 1990. Gross Hours: 744
- 2. Currently Authorized Power Level 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any)! h/A
- 4. Reasons for Restriction (If Any): i THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 5,831 26,566
- 6. Rx Critical Hours 744 5,682.3 23,747.3
- 7. Rx Reserve Shutdown Hours 0 0 0
- 8. Hours Generator on Line 744 5,669.5 23,354.5
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thormal Energy (MWH) 1,245,104 16,148,701 61,716,310
- 11. Gross Elec. Energy (MWH) 396,694 5,517,202 20,862,002
- 12. Het Elac. Energy (MWH) 361,813 5,212,337 19,602,473
- 13. Reactor Service Factor 100 97.4 89.4
- 14. Reactor Availability Factor 100 97.4 89.4
,i
- 15. Unit Service Factor 100 97.2 87.9
- 16. Unit Availability Factor 100 97.2 87.9
- 17. Unit Capacity Factor (MDC not) 44 80.9 66.8
- 18. Unit C(pacity Factor (DER net) 43.4 79.8 65.9
- 19. Unit Forced Outage Hrs. 0 26 845
- 20. Unit Forceo Outage Rate 0 0.5 3.5
- 21. Shutdowns Scheduled Over Next 6 Fonths: 1 - September
- 22. If Shutdown at End of Report Peri od, Estimated Date of Startup N/A
- 23. Units in Test Status (Prior to C m:mercial Operation): None
- Note The cumulative numbers do not reflect power generated prior to commercial service.
( 062 5'(/0062M/ 9)
C. AVIPAGLl1AILY UtiIT.. POWER LEYJL DOCKET NO.: 050-455 UNIT: Byron Two DATE: 09/10/90 COMPILED BYt K. Orris TELEPHONE: (815)234-5441 x2444 MONTil August, 1990 DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
- 1. 6.QE_MW 16. 473 MW
- 2. 590_MW 17, 470 MW i 1
- 3. 576 MW 18. 460 MW
- 4. 572__MW 19, 110 MW
- 5. 569 MW 20. 435 MW
- 6. 578 MW 21. 446 MW i
- 7. 574 MW 22. 442 MW
- 8. SQ1_ MW
- 23. 446 MW
- 9. 510_MW 24. 436 MW
- 10. 541 MW 25. 427 MW 11, 52Ll4W 26 418 MW
- 12. 511_MW 27. 405 MW i
- 13. 5.Q9 MW 28. 408 191
- 14. 19H MW 29. 415 MW
- 15. 485 MW 30. 380 MW 31, 310 MW INSTRUCT 10 tis On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit' power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M/10) I
- R; port Period August, 1990 UNIT SHUTDOWNS / REDUCTIONS
(UNIT 2)
No. Date Iggm Ecurs Reason Method LER Number System Comoonent Cause & Corrective Action to Prevent Recurrence No unit shutdown or major reductions for Unit 2 in August.
- c. *c.*********
O Sumary
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H-5-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction. 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
.& License Examination 9-Other (LER) File (Nt' REG-0161)
(0625M/0062M/11)
___________,_____q_ . . - - - -
E. UNIOUE REPOElitiG REOUIREtiENTS (UNIT 2) for the month of Auaust 1990
- 1. Safety / Relief valve operations for Unit Two.
i VALVES NO & TYPE PLANT DESCRIPTION DATE ACIMATED ACTUATION CONDITI.Cli OF EVENT None
- 2. Licensee generated changes to ODCM. (Y/N)
No.
- 3. Indicotions of failed fuel. (Y/N)-
Yes. Approximately two to five leaking fuel pins.
Tuel Reliability Is.dicator = 2.3E-3 pC1/cc (0625M/0062M/12)
f
..o LLLCEi[SEE EVENT REPORTS (UNIT 2)
The following is a tabular swnmary of all Licensee Event. Reports for Byron Nuclear Power Station, Unit Two, submitted during the reporting period, August 1 through August 31, 1990. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensge EvenLleggrt Number Dgg Title of OccurrenC2 90-002 7/14/90 feedwater isolation signal generated from the Train B Reactor Trip Breaker.90-003 7/17/90 P-14 Feedwater isolation due to difficulty controlling Steam Generator level at low power.
(0625M/0062H/13)
J