ML20065D533
Jump to navigation
Jump to search
| ML20065D533 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/07/1982 |
| From: | TOLEDO EDISON CO. |
| To: | NRC |
| Shared Package | |
| ML20065D522 | List: |
| References | |
| NUDOCS 8209300079 | |
| Download: ML20065D533 (1) | |
Text
_ _ _ _ _ _ _ _ _.
DAVIS-BESSE REVISION COVER SHEET l*
SEP 7 1982 DATE i k.?_ )
/ kn e, lYO bry-r><-
To:
A
(/
'l FROM:
EMERGENCY PLANNING & PREPAREDNESS SUPV.
SUB.1ECT: Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual Changes This 1ctter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual.
Control Copy t4%E.
Instructions for the material are as follows:
REMOVE AND RETURN INSERT Revision Index, Revision 15 Revision Index, Revision 16 EI 1300.12.1 EI 13J0.12.2 T-5850 T-5918 Dale HuvlHlun EatureI,
Addressee Signature RETURN TO THE OFFICE MANAGER STOP #3050 s
I 8209300079 820916 PDR ADOCK 05000346 F