MONTHYEARML20209H5051999-07-14014 July 1999 Proposed Tech Specs Pages 3.1-15 & 3.1-17 of Table 3.1.1 ML20209E0951999-07-0707 July 1999 Proposed Tech Specs,Changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5441999-06-18018 June 1999 Proposed Tech Specs Reflecting Installation of Addl SFP Storage Racks That Will Accommodate Increase in Spent Fuel Assemblies Beyond Existing Storage Capacity of SFP as Described in Licensing Rept ML20195D0761999-06-0303 June 1999 Proposed Tech Specs,Permitting Plant Operation with Three Operable Recirculation Loops ML20205P8531999-04-15015 April 1999 Proposed Tech Specs,Modifying Number of Items in Sections 2 & 3 of Tss,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0671998-12-23023 December 1998 Proposed Tech Specs Pages 3.8-2 & 4.8-1,changed to Specify Surveillance Frequency of Once Per Three Months ML20195C6561998-11-10010 November 1998 Proposed Tech Specs Section 5.1.A,removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7501998-11-0505 November 1998 Proposed Tech Specs,Modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20151V5091998-09-0303 September 1998 Proposed Tech Specs 3.4.A.10.e & 3.5.A.2.e Re Condensate Storage Tank Level ML20237D9591998-08-21021 August 1998 Proposed Tech Specs Removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 ML20237B2221998-08-0606 August 1998 Proposed Revised Tech Specs Pages for Change Request 205,dtd 961031,correcting Minor & Inadvertent Editorial Changes in Locations Where Changes Have Not Been Proposed ML20236T1211998-07-23023 July 1998 Proposed Tech Specs Pages for Amend to License DPR-16,to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4981998-07-21021 July 1998 Proposed Tech Specs Re Reactivity Control ML20236T4811998-07-21021 July 1998 Proposed Tech Specs Re Changes to Administrative Controls ML20236J1431998-06-30030 June 1998 Proposed Tech Specs,Consisting of Revised Page 3-5 Re RPV Pressure/Temp Limits ML20236H2181998-06-29029 June 1998 Proposed Tech Specs,Modifying EDG Insp Requirement Previously Submitted in Entirety ML20248K2851998-05-28028 May 1998 Proposed Tech Specs Re That Such First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2771997-12-23023 December 1997 Proposed Tech Specs Reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2561997-12-10010 December 1997 Proposed Tech Specs Changing Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20210L3311997-08-15015 August 1997 Proposed Tech Specs,Incorporating Note Which Indicates That Proposed Change to SL Mcrp Applicable for Current Operating Cycle (Cycle 16) Only ML20135C2001996-11-27027 November 1996 Proposed Tech Specs Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3401996-11-12012 November 1996 Proposed Tech Specs,Consisting of Change Request 224, Implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0541996-10-31031 October 1996 Proposed Tech Spec,Requesting Deletion of Table 3.5.2 ML20129C0691996-10-10010 October 1996 Proposed Tech Specs,Clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20129A5731996-10-10010 October 1996 Proposed Tech Specs,Revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20134F4101996-10-0404 October 1996 Proposed Tech Specs 2.1.A & 3.10.C to Reflect Change in SLMCPR & Revise Operating CPR Limit for Stability, Respectively ML20117E7061996-08-23023 August 1996 Proposed Tech Specs,Proposing New pressure-temp Limits Up to 22,27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corrresponding EFPY of Operation ML20115G2101996-07-17017 July 1996 Proposed Tech Specs,Allowing Implementation of 10CFR,App J, Option B ML20113A8641996-06-19019 June 1996 Proposed Tech Specs Table of Contents,1.24 Re Footnote to definition,1.25 Re Definition,Section 3.5.A.3b Re Containment,Section 4.5 Re Containment,Bases for Section 4.5 & Section 6.9.3.b Re Reporting Requirements ML20111A3841996-05-0707 May 1996 Proposed Tech Specs,Adopting Provisions of STS NUREG-1433, Rev 1,dtd 950407,Sections SR 3.0.1,3.0.3 & Associated Bases ML20107E7751996-04-15015 April 1996 Proposed Tech Specs 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7681996-03-28028 March 1996 Proposed Tech Specs,Modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J6091996-03-25025 March 1996 Proposed Tech Specs,Deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J9151996-02-23023 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20100H9971996-02-22022 February 1996 Proposed Tech Specs 3.7-1,3.7-2,4.7-1 & 4.7-2 Re Deletion of TS Requirement to bi-annually Inspect EDG & Mod of Spec Re AOT ML20095C1031995-12-0505 December 1995 Proposed Tech Specs Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20086A7161995-06-26026 June 1995 Proposed Tech Specs Re Performance of Reactor Shutdown & Drywell to Inspect Snubbers in Svc for Only 12 Months ML20080P6501995-02-28028 February 1995 Proposed Tech Specs Change Request 225 Re Change to Page 6-4 of Tech Spec Section 6.5.1.12.Change Consistent w/NUREG-1433,STSs General Electric Plants,BWR/4,Rev 0,dtd 920928 ML20078N3791995-02-0808 February 1995 Proposed Tech Specs Re Oyster Creek Spent Fuel Pool Expansion ML20078Q6481994-12-15015 December 1994 Revised TS & Bases Pages to Section 3.1 of TS Change Request 191 ML20078M1431994-11-25025 November 1994 Proposed TS 5.3.1.E,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20072S2921994-09-0202 September 1994 Proposed Tech Specs Supporting Rev of APRM Channel Calibr Interval from Weekly to Quarterly ML20072L4741994-08-19019 August 1994 Proposed Tech Specs Control Rod Exercising & Standby Liquid Control Pump Operability Testing ML20070E3411994-07-0808 July 1994 Proposed Tech Specs Re Improved Protection to Safety Related Electrical Equipment from Loss of Capability ML20078A7731994-06-24024 June 1994 Proposed Tech Specs Reflecting Removal of Recirculation Flow Scram ML20069M8231994-06-15015 June 1994 Proposed Tech Spec 2.3.D, Reactor High Pressure,Relief Valve Initiation ML20070R5261994-05-12012 May 1994 Proposed TS Sections 3.1 & 4.1 for Protective Instrumentation ML20029E0451994-05-0606 May 1994 Proposed Tech Specs Clarifying Requirements for Demonstrating Shutdown Margin ML20065M9991994-04-19019 April 1994 Proposed Tech Specs Updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable or Bypassed During Sys Pressure Testing ML20029C7571994-04-15015 April 1994 Proposed TS Change Request 215,deleting Audit Program Frequency Requirements from TS 6.5.3 & Utilize Operational QA Plan as Controlling Document 1999-07-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212B5741999-09-0505 September 1999 Rev 11 to 2000-ADM-4532.04, Oyster Creek Emergency Offsite Dose Calculation Manual ML20209H5051999-07-14014 July 1999 Proposed Tech Specs Pages 3.1-15 & 3.1-17 of Table 3.1.1 ML20209E0951999-07-0707 July 1999 Proposed Tech Specs,Changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5441999-06-18018 June 1999 Proposed Tech Specs Reflecting Installation of Addl SFP Storage Racks That Will Accommodate Increase in Spent Fuel Assemblies Beyond Existing Storage Capacity of SFP as Described in Licensing Rept ML20195D0761999-06-0303 June 1999 Proposed Tech Specs,Permitting Plant Operation with Three Operable Recirculation Loops ML20205P8531999-04-15015 April 1999 Proposed Tech Specs,Modifying Number of Items in Sections 2 & 3 of Tss,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0671998-12-23023 December 1998 Proposed Tech Specs Pages 3.8-2 & 4.8-1,changed to Specify Surveillance Frequency of Once Per Three Months ML20195C6561998-11-10010 November 1998 Proposed Tech Specs Section 5.1.A,removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7501998-11-0505 November 1998 Proposed Tech Specs,Modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20151V5091998-09-0303 September 1998 Proposed Tech Specs 3.4.A.10.e & 3.5.A.2.e Re Condensate Storage Tank Level ML20237D9591998-08-21021 August 1998 Proposed Tech Specs Removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 ML20237B2221998-08-0606 August 1998 Proposed Revised Tech Specs Pages for Change Request 205,dtd 961031,correcting Minor & Inadvertent Editorial Changes in Locations Where Changes Have Not Been Proposed ML20236T1211998-07-23023 July 1998 Proposed Tech Specs Pages for Amend to License DPR-16,to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4811998-07-21021 July 1998 Proposed Tech Specs Re Changes to Administrative Controls ML20236T4981998-07-21021 July 1998 Proposed Tech Specs Re Reactivity Control ML20236J1431998-06-30030 June 1998 Proposed Tech Specs,Consisting of Revised Page 3-5 Re RPV Pressure/Temp Limits ML20236H2181998-06-29029 June 1998 Proposed Tech Specs,Modifying EDG Insp Requirement Previously Submitted in Entirety ML20248K2851998-05-28028 May 1998 Proposed Tech Specs Re That Such First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2771997-12-23023 December 1997 Proposed Tech Specs Reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2561997-12-10010 December 1997 Proposed Tech Specs Changing Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20210L3311997-08-15015 August 1997 Proposed Tech Specs,Incorporating Note Which Indicates That Proposed Change to SL Mcrp Applicable for Current Operating Cycle (Cycle 16) Only ML20135C2001996-11-27027 November 1996 Proposed Tech Specs Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3401996-11-12012 November 1996 Proposed Tech Specs,Consisting of Change Request 224, Implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0541996-10-31031 October 1996 Proposed Tech Spec,Requesting Deletion of Table 3.5.2 ML20129C0691996-10-10010 October 1996 Proposed Tech Specs,Clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20129A5731996-10-10010 October 1996 Proposed Tech Specs,Revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20134F4101996-10-0404 October 1996 Proposed Tech Specs 2.1.A & 3.10.C to Reflect Change in SLMCPR & Revise Operating CPR Limit for Stability, Respectively ML20117E7061996-08-23023 August 1996 Proposed Tech Specs,Proposing New pressure-temp Limits Up to 22,27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corrresponding EFPY of Operation ML20115G2101996-07-17017 July 1996 Proposed Tech Specs,Allowing Implementation of 10CFR,App J, Option B ML20113A8641996-06-19019 June 1996 Proposed Tech Specs Table of Contents,1.24 Re Footnote to definition,1.25 Re Definition,Section 3.5.A.3b Re Containment,Section 4.5 Re Containment,Bases for Section 4.5 & Section 6.9.3.b Re Reporting Requirements ML20111A3841996-05-0707 May 1996 Proposed Tech Specs,Adopting Provisions of STS NUREG-1433, Rev 1,dtd 950407,Sections SR 3.0.1,3.0.3 & Associated Bases ML20107E7751996-04-15015 April 1996 Proposed Tech Specs 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101P1561996-03-31031 March 1996 Rev 9 to Oyster Creek Nuclear Generating Station Pump & Valve IST Program ML20101J7681996-03-28028 March 1996 Proposed Tech Specs,Modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J6091996-03-25025 March 1996 Proposed Tech Specs,Deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J9151996-02-23023 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20100H9971996-02-22022 February 1996 Proposed Tech Specs 3.7-1,3.7-2,4.7-1 & 4.7-2 Re Deletion of TS Requirement to bi-annually Inspect EDG & Mod of Spec Re AOT ML20095C1031995-12-0505 December 1995 Proposed Tech Specs Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20086A7161995-06-26026 June 1995 Proposed Tech Specs Re Performance of Reactor Shutdown & Drywell to Inspect Snubbers in Svc for Only 12 Months ML20080P6501995-02-28028 February 1995 Proposed Tech Specs Change Request 225 Re Change to Page 6-4 of Tech Spec Section 6.5.1.12.Change Consistent w/NUREG-1433,STSs General Electric Plants,BWR/4,Rev 0,dtd 920928 ML20078N3791995-02-0808 February 1995 Proposed Tech Specs Re Oyster Creek Spent Fuel Pool Expansion ML20078Q6481994-12-15015 December 1994 Revised TS & Bases Pages to Section 3.1 of TS Change Request 191 ML20078M1431994-11-25025 November 1994 Proposed TS 5.3.1.E,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9501994-09-26026 September 1994 Revised Plan for Long Range Planning Program for Oyster Creek Nuclear Generating Station ML20073F9411994-09-26026 September 1994 Revised Plan for Long Range Planning Program for TMI Nuclear Station Unit 1 ML20072S2921994-09-0202 September 1994 Proposed Tech Specs Supporting Rev of APRM Channel Calibr Interval from Weekly to Quarterly ML20072Q4251994-08-20020 August 1994 Rev 0 to Oyster Creek Nuclear Generating Station Sea Turtle Surveillance,Handling & Reporting Instructions for Operations Personnel ML20072L4741994-08-19019 August 1994 Proposed Tech Specs Control Rod Exercising & Standby Liquid Control Pump Operability Testing ML20070J7971994-07-31031 July 1994 Rev 8 to Oyster Creek Nuclear Generating Station Pump & Valve Inservice Testing Program ML20070E3411994-07-0808 July 1994 Proposed Tech Specs Re Improved Protection to Safety Related Electrical Equipment from Loss of Capability 1999-09-05
[Table view] |
Text
W ;-
y ENCLOSUtg Technical specification Change Request No. 180 supplement I ,
t t
P 4
'h 9009250271 900914 POR ADOCK 0S000219
-P PDC ,
t
qr i
\;p <
p;i..
'}) .. C. - Minimum Critical Power Ratio (MCPR)
, DJeing steady state powar operation the MINIMUM CRITICAL POWER ,
4 RATIL (MCPR) shall be equal to or greater than the MCPR limit !
.as specalled in the COLR.- 4 j When APRM statas changes due to instrument failure (APRM or LPRM input failure), the MCPR requirement for the degraded i condition shall be met within a time interval of eight (8) ,
hours, provided that the control rod block is placed in j operation during this' interval.
'l j
i For core flows other.than rated, the nominal value for MCPR shall be increased by a factor of k g, where kg is as shown l in the COLR. j I
If at any timo during power operation it is determined by :j normal surveillance that the limiting value for MCrd is being exceeded for reasons other than instrument failure, action 4 6 hall be_ initiated to restore operation to within the . l prescribed limits. If the steady state MCPR is not returned to ;
within the prescribeid limits within two [2] horre, action shall i be initiated to briig the reactor to the cold ohutdown l condition within 36 ..ours. During this period, surveillance and corresponding action acall continue until reactor operation is within the presexebed limit at which time power operation )
.may be continued. !
Bases The Specification for average planar LHGR assures that the peak cladding temperature following the postulated design basis loss-of-coolant accident will not exceed the 2200*F llmit >
specified in 10.CFR 50.46. The analytical methods and assumptions used in evaluating the fuel design limits are "
presented in FSAR Chapter 4.
4 LOCA analyses are performed for each fuel design at selected exposure points to determined APLHGR limits that meet the PCT and maximum oxidation limits of 10 CFR 50.46. The analysis is performed using GE calculational models which are consistent with the requirements of 10 CFR 50, Appendix K. . ,
t The PCT following a postulated LOCA'is primarily a function of the average heat generation rate of all the rods of a fuel assembly at any axial location and is not strongly influenced ~ ,
by the rod to rod power distribution within an assembly.
Since expected location variations in power distribution within a fuel assembly affect the calculated peak clad temperature by less than i 20*F relative to the peak temperature for a typical fuel design, the limit on OYSTER CREEK 3.10-2 Amendment No.:
.i
' ~
E 7 I -- ;j{ 1 iI-lll <
l P lf the cv2r:ge lin:Or h:st g:n:rctirn r;to 10 cufficicnt ts j
, . assure that calculated temperatures are below the limits
- .pecified in 20 CFR 50.46.
e ,
The maximum average planar LHGR limits for the various fuel types currently being used are provided in the COLR. The ;
MAPLMGR limits for both five-loop and four-loop operation ;
with the idle loop unisolated are shown. Four-loop i operation with the idle loop isolated (suction, discharge and discharge bypass valves closed) requires that a MAPLMGR
- multiplier of 0.98 be applied to all fuel types. l Additional requirements for isolated loop operation are given in Specification 3.3.F.2. i Fuel design evaluations are performed to demonstrate that ;
the cladding 1% plastic strain and.other fuel design limits !
are not exceeded during anticipated operational occurrences for operation with LHGRs up to the operating limit LHGR. ;
e The analytical methods and assumptions used in evaluating i the anticipated operational occurrences to establish tho' operating limit MCPR are presented in the FSAR, Chapters 4, ,
6 and 15 and in Technical Specification 6.9.1.f. To assure ,
that the Safety Limit MCPR is not exceeded during any ;
moderate frequency transient event, limiting transients i have been analyzed to determine the largest reduction in !
Critical Power Ratio (CPR). The types of transients evaluated'are pressuritation, positive reactivity insertion and coolant temperature decrease. The operational MCPR ,
limit is selected to provide margin to accommodate +
transients'and uncertainties in monitoring the core operating state, manufacturing, and in the critical power
, correlation itself. This limit is derived by addition of the CPR for the most limiting transient to the safety limit MCPR dewignated in Specification 2.1.
The APRM response is used to predict when the rod block occurs in the analysis of the rod withdrawal error transient. The transient rod position at the rod block and corresponding MCPR can be. determined. The MCPR has been evaluated for different APRM responses which would result .f from changes in the APRM status as a consequence of bypassed APRM channel and/or failed / bypassed LPRM inputo. 7 The steady state MCPR required to protect the minimum transient CPR fo* the worst case APRM status condition ,
( APRM Stat *;; 1) is determined in the rod withdrawal error transient analysis. The steady state MCPR values for APRM status conditions-1, 2, and 3 will be evaluated each cycle. For those cycles where the rod withdrawal error transient is not the most severe transient the MCPR Value for APRM status conditions 1, 2, and 3 will be the same and be equal to the limiting transient MCPR value.
OYSTER CREEK 3.10-3 Amendment No.
I l
i
1 i's. .
(4) o cummary cf met 0 rslogical d;to os11ceted during th) yOOr
. shall be included in the report submitted within 60 days after January 1 of each year. Alternatively, summary meteorological l data may be retained by GPU Nuclear and made available to the -l NRC upon request. I i
- e. Annual Radio *pcical Environmental Req 2Ett A report of radiological, I environmental surveillance activities during each year shall be submitted before May 1 of the following year. Each report 2nall !
include the following information required in specificat!.on 4.16 ,
for radiological environmental surveillance:
(1) a summary description of the radiological env yonmental monitoring program, (2) a map and a table of distances and directions.(compass azimuth) of locations of sampling stations from the reactor, ;
(3) results of analyses of samples and of. radiation measurements, (In the event some results are not.available, the reasons shall be explained in the eport. In the event the missing results l are obtained, they shall be reported to the NRC as soon as is reasonable.)
(4) deviation (s) from the environmental sampling schedule in Table q 4.16.1. i (5) identification of environmental samples analyzed when instrumentation was not capable of vieeting datection capability in Table 4.16.2.
(6) a summary of the results of the land use survey.
J '
(7) a summary of the results of licensee participation in an NRC approved inter-laboratory crosscheck program for environmental -
samples.
(8) results of dose evaluations to demonstrate compliance with 40 CFR Part 190.10a.
- f. QQRE OPERATING LIMITS REPORT (COLR)
- 1. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle for the following
- a. The AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) for Specification 3.10.A
- b. The Kf core flow adjustment factor for Specification 3.10.C.
- c. The MINIMUM CRITICAL POWER RATIO (MCPR) for Specification +
3.10.C ,
OYSTER CREEK 6-12 Amendment No.: J4, }&s, 134 P
r.
- .. - 1
- d. The LOCAL' LINEAR HEAT GENERATION RATE (LLHGR) for I Specification 3.10.B. J and shall be documented in the COLR.
- 2. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the i
?
NRC, specifically those described in the following documents.
- a. GPU Nuclear (GPUN) Topical Report (TR) 020, Methods for the Analysis of Boiling Water Reactors Lattice Physics, latest approved revision
- b. GPUN TR 021, Methods for the Analysis of Boiling Water Reactors Steady State Physics, latest approved revision ,
~
- c. GPUN TR 033, Methods for the Generation of Core Kinetics Data for RETRAN-02, latest approved revision i
- d. GPUN TR 040, Steady-State and Quasi-Steady-State Methods
- Used in the Analysis of Accidents and Transients, latest approved revision
- e. GPUN TR 045, BWR-2 Trauwi$nt Analysis Model Using the Retran Code, latest approved revision
- f. NEDE 3146k? and NEDE-31462, Oyster Creek Nuclear Generating - f Station SAFEh/CORECOOL/GESTR-LOCA Loss-of-Coolant 1 Accident Analysis, latest approved revision t
- g. NEDE-240ll, General. Electric Standard Application for Reactor Fuel, latest approved revision
- h. NEDE-24195, General Electric Reload Fuel Application for Oyster Cre u, latest approved revision
- i. XN-75-55-(A); XN-75-55, supplement 1-(A;; XN-75-55, Supplement 2-(A), Revision 2, " Exxon Nuclear Company-WREM-Based NJP-BWR ECCS Evaluation Model and Application to the Oyster Creek Plant," April 1977
- j. XN-75-36(NP)-(A); XN-75-36(NP), Supplement'l-(A),." Spray Cooling Heat Transfer Phase Test Results, ENC - 8x8 BWR Fuel 60 and 63 Active Rods, interim Report, " October 1975
- 3. The core operating limits shall be determined such that all- ,
, applicable limits (e.g., fuel thermal-mechanical limits,-core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- 4. The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements shall be provided, upon issuance for each reload cycle, to the NRC Document Centrol Desk with copies to the Regional Administrator and Resident Inspector.
OYSTER. CREEK 6-12a Amendment No.
I l
. Basis: 6.9.1.e An annual report of radiological environmental surveillance activities includes factual data summarising results of activities required by the i surveillance program. . In order to aid interpretation of the data, GPUN l may choose to submit analysis of trends and comparative non regional radiological environmental data. In addition, the licensee may choose ~
to discuss previous radiological environmental data as well as the i observed radiological environmental impacts of station operation (if any) on the environment.
6.9.2 REPORTABLE EVENTS ).
'The submittal of Licensee Event Reports shall be accomplished in .)
accordance with the requirements set forth in 10 CFR 50.73.
1 I;
l I
l t
k OYSTER' CREEK 6-12b Amendment No. : ;St, JA1f, 134 l
_ _ _ _ _ .