Public Version of Revision 22 to Emergency Plan Implementing Procedure 3100023E, Onsite Emergency Organization & Roster
ML20065D634
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/04/1982
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17213A511 List:
References
3100023E-01, 3100023E-1, NUDOCS 8209300108
Download: ML20065D634 (12)


Text

p -

. w ..... .m = ~ . ..ww  : .:a ava - w -

-e. -

n a n Pogo 1 of 12 a

FLORIDA POWER & LIGHT COMPANY ST. LUCIE PLANT E-PLAN IMPLEMENTINC PROCEDUFI NO. 3100023E REVISION 22

~

1.0 Title

ON-SITE EMERGENCY ORGANIZATION AND ROSTER

2.0 Approval

- Reviewed by Facility Review Group July 25, 1975, Approved by K. N. Harris Plant Manager July 29, 1975 Revision 22_R e e4.by F R do u // . J~un e. '/ 19 P."L Approved b & V Vice-Pres.Nui.Eng. [d/ 19 V

3.0 Scope

3.1 Purpose This procedure describes the members and duties of the On-Site Emergency Organization (see Figure 1).

3.2 Discussion . . _

During the period immediately following the declaration of an emergency, the shift operating staff constitutes the immediate response organization, i.e., the Interim Emergency Teams. Emergency requirements take immediate precedence over normal operating responsibilities (as determined by Emergency Procedures or at the, direction of the Emergency Coordinator). Subsequent to the immediate response actions and notifications, off-duty plant staff will begin arriving to form the Primary Emergency Teams and to staff the On-Site Support Centers. The On-Site Emergency Organization reports to and supports the Emergency Coordinator. /R22 3.3 Authority This procedure implements the St. Lucie Plant Radiological Emergency Plan.

e 8

8209300108 820916 PDR ADOCK 05000335 F PDR w -- v : . - . _-=: m ~ m=m =,: ;mmmm ,;me am,w _a: , n,- >

- d L. u .= .. . :1 m u-,w R L.:au & h >: L w- A- a hw . ', is Fl

.t Pogo 2 of 12 , l ST.* LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE No. 3100023E, REV. 22 EMERGENCY ROSTER

3.0 Scope

(continued) 3.4 Definitions 3.4.1 Emergency Coordinator

  • Responsible for notifying off-site authoritics, both inside and outside the Company and has full authority and responsibility for on-site emergency response actions. This function is performed by the Nuclear Plant Supervisor. His normal alternate is the Watch Engineer. The Operations Superintendent, the Operations Supervisor or Operations Duty Call Supervisor can assume this function at their discretion following the proper turnover procedure.

3.4.2 Interim Emergency Teams ,

The Interim Emergency Teams are composed of members chosen from plant shift personnel. All are qualified in procedures and practices required for the performances of their duties as team leaders or members. .

~3.4.3 Primary Emergency Teans The Primary Emergency Teans are composed of first line management personnel and others who normally work a regular Monday through Friday day shif t schedule.

3.4.4 Technical Support Centel Supervisor - -

The person who supervises the personnel and manages the technical support activities in the Technical Support Center. This function is performed by one of the following:

Primary: Technical Supervisor Alternates Off-duty Shif t Technical Advisors l

3.4.5 Operations Duty Call Supervisor l- An on-call supervisor assigned on a rotating basis from the i plant management staff with responsibility for assisting the l Emergency Coordinator in notifying of f-duty plant staff and I the company's of f-site emergency organization in the event of an emergency.

I 3.4.6 Operations Support Center Supervisor The person who supervises the personnel and manages the .

maintenance and operations support activities from the Operations Support Center. This function is performed by one of the following:

Primary: Assistant Superintendent-Mechanical-Nuclear Alternate 1: Maintenance Support Supervisor Alternate 2: Maintenance Training Supercisor l ,

Alternate 3: Manpower Supervisor

?_ [ Y m O' 5 '

  • W' Y UM 5 ^- Y ^ ~ ' "

a :w. w ...- --.w .:.w. m m ~ .x a ~ < m w w w - - - w - - -, -

  • a Pago 3 of 12

~

ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE No. 3100023E, REV. 22 EMERGENCY ROSTER

4.0 Precautions

4.1 The Interim Tems should take action regardless of the fact that the Primary Emergency Team members may be present.

Members of an Interim Emergency Team may consider themselves relieved only upon the specific instructions of a recognized superior or the Primary Emergency Team Leader. Merely knowing that a superior or a Primary Emergency Team Leader is present does not constitute a release fras emergency duties and responsibilities.

4.2 At their own option, and with the concurrence of the Emergency

  • Coordinator, Primary Emergency Team Leader 'of that team may relieve their counterpart on the Interim Emergency Teams.

. 5.0 Responsibilities:

51 Emergency Direction and Control The Emergency Coordinator shall be responsible for direction and control, as described in E-Plan Implementing Procedure 3100021E, Duties of Emergency Coordinator.

5.2 Notification and Communication The Emergency Coordinator shall be responsible for notification and -

communications as described in E-Plan Implementing Procedure

~

3100021E, Duties o,f Emergency Coordinator. The Duty Call Supervisor shall be responsible for initial notification assistance.

5.3 Radiation Team The Health Physics Supervisor shall be' the Primary Radiation Team Leader. He shall direct the actions of the Health Physics technicians under the orders of the Emergency Coordinator. The Senior Health Physics representative on site is designated as the Interim Radiation Team Leader with support from Nuclear Operators.

5.4 Plant System Engineering The Shif t Technical Advisor shall provide the initial technical support necessary fer repair or corrective action and shall be primarily responsible for accident assessment.

5.5 Fire Team The Nuclear Watch Engineer is the Fire Team Leader. This position is manned continuously, but, if he is not available, the Turbine Operator acts as his alternate. The St. Lucie County - Ft. Pierce Fire District may respond to fires on-site, if requested.

l r

" " 7 " ,~ m, .w E TIWM' yg;p 4,pg; _,

. ;.g _

,.w..._n. _ . . - - _ - ~ ~ ~ ~ . . - g_.- .

l Pago 4 of 12 ST; LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REV. 22 EMERGENCY ROSTER-

5.0 Responsibilities

(continued) 5.6 First Aid / Decontamination Team The Chemistry Supervisor shall be the Primary Team Leade. with a Chemistry Technician as his alternate. A Nuclear Operator, trained in first aid and personnel decontamination, shall be the Interim Team Leader. If no Chemistry Department personnel are on-site, any trained employee cculd act as a First Aid / Decontamination Tean member until primary team members can b'e called in.

5.7 Security Teen The Plant Security Supervisor shall be the Primary Security Team Leader with the Security Force Shif t Supervisor as his alternate.

The Security Force Shift Supervisor shall act as the Interim -

Security Team Leader. Personnel control and accountability are the responsibility of the Security Tean. The Security Team Leader shall be responsible for notifying the Emergency Coordinator of unaccounted for personnel Notification of occupants in the Owner Controlled Area Shall take place during the security search.

5.8 Rescue Operations Rescue Operations shall involve the First Aid / Decontamination Teen and the Radiation Team as necessary. Under the control of the Radiation Team Leader, entry to potentially hazardous areas shall be

. made by the First Aid / Decontamination Team with assistance from the Radiation Tean. Upon notification of the injury, both teams shall respond per the Emergency Coordinator's. instructions.

5.9 Re-Entry Team Re-cery teams shall be formed as necessary in accordance with E-Plan Implementing Procedure 3100027E, Re-Entry.

5.10 Recovery and Restoration Tean Recovery and Restoration Operations shall involve all emergency teams as necessary. Team members shall be assigned from available plant staff.

5.11 Technical Supoort Center Staff The TSC shall be used to provide plant management and technical support to plant operations personnel during emergency conditions.

A primary task shall be to relieve the Emergency Coordinator of off-site communi. cations to the state and local agencies, NRC and the FPL Of f-Site Emergency Organization. The TSC staff shall provide technical support as requested by the Emergency Coordinator and ,

,~

shall direct itself toward determining current and projected plant-status and providing in-depth diagnostic and engineering assistance, as required.

.A _

E k e*- I( , *$' .* e

w: .: sw wu.w.+.~ w -- ~ ~=_ ~. - ~; - - ~ ~ . . - . - -

Pcgr.5 of 12 ST.'LUCIE PLANT '

E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REV. 22 EMERGENCY ROSTER

5.0 Responsibilities

(continued) 5.12 operations Support Center Staff

. The OSC will be the reporting area (Maintenance Office in Service Building) and activity control / management location for available/ called-in operators, Maintenance personnel, HP personnel, Chemistry personnel and other plant support personnel as needed and -

available. Their activities will be supervised by the OSC Supervisor at the request of the Emergency Coordinator and TSC Supervisor. The Special Crew Supervisor (backshif t hours) when on site will be the interim OSC Supervisor.

5.13 Emergency Roster The QC Supervisor shall be responsible for periodic verification a'nd updating of the Emergency Roster. Personnel on the Roster shall notify the QC Supervisor when a change' pertinent to information appearing on the roster occurs.

6.0

References:

6.1 St. Lucie Plant Radiological Emergency Plan 6.2 E. Plan Implementing Procedure 3100021E, Duties of the Emergency coordinator.

6.3 E. Plan Implementing Procedure 3100027E, Re-Entry.

  • 6.4 HP-200 Health Physics Emergency Organization - /R22 6.5 HP-203' Personnel Access Control During Emergencies /R22

7.0 Records

The Emergency Coordinator shall maintain records as described in E-Plan Implementing Procedure 3100021E, Duties of the Emergency Coordinator.

i S

e 4

& '.. .. fi 3 b F ' __-

u,._. m uaa#a ~.s=ru- %- - a% .

mw ma __ .m. s  : - .oe . . um.- .

- , . . Paga 6 of 12

~

S T '. LUCIE PLANT '

E-PLAN IMPLEMENTINC PROCEDURE NO. 3100023E, REV. 22 EMERGENCY ROSTER

8.0 Instructions

8.1 Upon declaration of an emergency, the Interim Team Leaders shall ,

contact the Emergency Coo.-linator to determine the immediate response teams needed.

8.2 The Emergency Coordinator shall notify the Duty Call Supervisor to

' inform necessary plant management and Primary Team Leaders'to report to the Technical Support Center for assigranent if necessary.

8.3 The Technical Support Center Supervisor shall assist the Emergency Coordinator in assigning personnel to the Technical Support Center or the Operations Support Center.

8.4 Department heads or their designated alternates shall' report to the Technical Support Center where they shall, if necessary, relieve the Interim Team Leaders, and assume their responsibilities as Primary Team Leaders; or staff the Technical Support Center as directed by the Emergency Coordinator.

8.5 Appendix A is the Call List to assist the Emergency Coordinator in initial notification of the Duty Call Supervisor.

8.6 Appendix B is the List of Local Outside Agencies. ,

8.7 Appendix C is the Duty Call Supervisor's Call List. The Duty Call

. Supervisor shall contact these people when directed by the Emergency Coordinator to do so.

o e

e S

9 e

G G

T WYb *' ' '$ 'Y

  • _ 'h_'

. 4

r._u m "w m c.a e == - ee:. ~ ---w-~ _m.-m-~_

Pago 7 of 12 ST. LUCIE PLANT '

E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REV. 22 EMERGENCY ROSTER Emergency Coordinator Nuclear Plant Supervisor (Wat-h Engineer)

Interim (Shift Primary Emergency Team) EMERGENCY TEAMS ' Emergency Team Health Physics Health Physics Representative RADIATION Supervisor *

(Nuclear Operator) (Health Physics Technician)

Nuclear Watch Engineer Nuclear Watch Engineer (Nuclear Turbine Operator) FIRE (Nuclear Turbine Operator)

Nuclear Operator FIRST AID &

(Auxiliary Equip. PERSONNEL Chemistry Supervisor Operator) DECONTAMINATION (Chemistry Technician)

Security Force Plant Security Supervisor

.ihift Supervisor (Assistant Plant Security Superviso r)

(Kesponse from leader) SECURITY Generating Station Rasetor Supervisor Area Guard ASS 1!MBLY AREA (Engineer, Reactor (Outside Patrol) SUPERVISOR Eng. Dept.)

i RECOVERY AND All Teams and RESTORATION FPL Resources RE-ENTRY TEAMS (FORMED AS REQUIRED DURING EMERGENCY)

Shift Technical Advisor TECHNICAL SUPPORT Technical Supebisor (Off duty STA)

Special Crew Supervisor OPERATIONS ti4PM Asst. Supt. Mechnical (when on site) (Staff Supervisors)

FIGURE 1 e

?

M N W.w:- wnecs~wgve,iugryv7gy mcss _ _ _ _ ne A.K ~ ""':. y

. t y.5 A . ; ' i- ' '

f .

n .w . g w . mu. niww - - ~ ._ -- = -- .-a-. - - - . - . - ~

~ .- e _ . . ~.n,n-- _3 e

Page 8 of 12 ST. LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE No. 3100023E, REV . 22 EMERGENCY ROSTER EMERGENCY ROSTER APPENDIX A -

r7 /Sv,,.]",

k, i% eMwJv .

8 h nt Manager / Date DUTT CALL SUPERVISORS OPERATIONS DUTY H. P. DUTY CALL MAINTENANCE DUTY SUPERVISOR CALL SUPERVISOR CALL SUPERVISOR e

e C

e ee e

=

  1. g -'j -- ,

[.

'

  • EY 4 h y _

4

+ -

Page 9 of 12 ST." LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REV. 22 EMERGENCY ROSTER' r , n I-. /Q IV: _ l c.% le?-/l .) 2 t

( y lant Manager / Date 4

, APPENDIX B LOCAL OUTSIDE AGENCIES:

PHONE SERVICE NAME OFFICE EMERGENCY FIRE For additional assistance St. Lucie County-if required on fires with Pt. Pierce Fire dist.

radioactive material involved ,

- NON-RADIOLOGICAL INJURIES o

Treatment - all hours Lawnvood Medical Center Hospital admission Ambuiance - all hours St. Lucie County -

Ft. Pierce Fire dist.  ;

I I

RADIOLOGICAL INJURIES Transportation - all hrs. St. Lucie County -

Ft. Pierce Fire dist.

Interim treatment f acility - all hours Lawnvood Medical Center

- - ~~ '

Primary treatment  ! _

f acility - all hours REEF {

  • Mount Sinai Hospital PHONE SERVICE NAME OFFICE EMERGENCY Local Law Enforcement St. Lucie County .

Sheriff l Federal Bureau of Inve stiga tion

- Florida Highway Patrol Explosive Ordnance 66th Ordnance Det. USA { ,

Dispos al ' Patrick Air Force Base j SITE EXT. OFFT&- --"%

USNRC Resident Inspectors S. Elrod , /

H. Bibb '/

- S4 % , .,

'{'""

~

1_

  • o i[

_,..-,-__...n,._ . . _ _ _ _ . . .. - _ - .....-.._ ._ . _ . , _ .. _ .. _ _. _

Pogo 10 of 12 ST. LUCIE PLANT E-PLAN IMPLEMZNTING PROCEDURE NO. 3100023E, REV. 22 ,

EMERGENCY ROSTER i n .,

- 1 0 '. . i t , , r .. / . - . , :.

' Plant Manager Date

/.PENDIX C DUTY CALL SUPERVISOR'S CALL LIST PHONE NAME HOME OFFICE TITLE Emer. Recovery & Restoration t2am leader - Plant Manager Alternate: Ops. Superintendent

, Emergency Control Officer ALTERNATES Asst. Vice Pres. Power Res.

Manager Nuc1. ear Energy Nuclear Energy Duty Officers Asst. Mgr. Nuclear Energy Mgr. of Nuclear Energy Services Nuc. Eng. Sec. Supv. Plant Nuclear Energy Specialist Nuelear Energy Supervisor Nuclear Energy Sr. Engineer Nuclear Energy Specialist Nuclear Energy Specialist Nuclear Energy Supervisor

'm.;msww~9p < u,um wmm, -m ,.y -

ww -

-. mu.  :- a .. w - .x. . .. _ .- --- a-.a u ,.w n m. :..a .:~.a --

. .e

  • Page 11 of 12 ST. LUCIE PLANT ,

E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REV. 22 EMERCENCY ROSTER

e. /riI btta fL / l-f 5 .)5 V iant Manager Date Al'PENDIX C (continued)

DUTY CALL SUPERVISOR'S CALL LIST PHONE TITLE NAME HOME OFFICE Systems Operations Power Coordinator TEAM LEADERS & ALTERNATES Emergency radiation tean leader Alternate emergency radiaion team leader Plant Fire Protection Coordinato r Emergency First Aid & Personnel decontamination team leader Alternate Emergency security team leader Alternate Interim security team leader Alternate Assembly area supervisor Alternate Technical Support Center Superviso r Alternate TSC Supv. (STA) l Ops Support Center Supv.

l l Alternate 1 Alternate 2 f Alternate 3 l

I

[ ', . .,.e?gm cxRe -- sa -; m ,

  • 7:ry;- f , ,-  ;'~ - ~mren - , J4Cg.j, g 5

__ _ _ _ _ - _ . ._,. _ _ _ . _ _ m _. _ _ _ _._ _ _ , _ _ _ _

~

Pogo 12 of 12

- ST.,LUCIE PLANT E-PLAN IMPLEMENTING PROCEDURE NO. 3100023E, REV. 22 EMERGENCY ROSTER L} /hh&L hs / () !hY -

fa at Manager Date APPENDIX C (continued)

DUTY CALL SUPERVISOR'S CALL LISi PHONE NAME HOME OFFICE TITLE .

Additional personnel who may be requested by the Duty Call Supervisor or Emergency Coordinator are as follows: i s Additional Contacts PSL #1 Control Room PSL #2 Control Room __