ML20065D770

From kanterella
Jump to navigation Jump to search
Advises That Mods to Implement NUREG-0737,Item II.K.3.28 Re ADS Accumulator Qualification Complete
ML20065D770
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/17/1990
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.28, TASK-TM NUDOCS 9010010007
Download: ML20065D770 (2)


Text

_ -.

,.y

'A; gjy -

TENNESSEE' VALLEY AUTHORITY u

SN 157B Lookout Place SEP 171990 l

U.S. Nuclear Regulatory Comunission i

ATTN: Document Control Desk Washington, D.C.

20555 i

)

Gentlement In the Matter of

)

Dochet No. 50-260 Tenneseee Valley Authority

)

BROWNS FERRY Nt! CLEAR PLANT (BFN) - NOTIFICATION OF IMPLEMENTATION OF NUREG-0737, ITEM II.K.3.28, ADS ACCUMULATOR QUALIFICATION (MPA F-55)

The' NRC Project Manager has reque.sted written notification of implementation j

of issues tracked by the Safety Issues Management System (SIMS). The required modifications to implement NUREG-0737 (TMI Action Plan),-Item II.K.3.28 are

]

fie3d complete at BFN unit 2.

The design has been finalized and the equipment installed. Procedure changes and necessary training are addressed by the normal modification closaout procuss which is completed prior to system return to= service.

I Please update the SIMS database to reflect this implementation as of the date.

of this letter.

Very truly yours, I

TENNESSEE VALLEY AUTHORITY-E. G. Wallace, Manager.

' Nuclear Licensing and Regulatory Affairs 1-,

cci See page 2 t

1 t

9010010007 900917 PDR ADOCK 05000260 p

PDC

$0ll$

. An Equal Opportunity Emptoye g.

=

4 ;u -

'b

/

h*'

t-U.S. Nuclear Regulatory Commission cc (Enclosures):

Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20B52 NRC Resident Inspector i

Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Thierry M. Ross, Project Manager a(.

U. S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville,iMaryland 208 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II i

101 Marietta Street, NW, Suite 2900 Atlanta,' Georgia 30323 t

i i

i 1

\\.

4 e

t 6

l

$6..-

g