Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- JAFP-94-0240, 1993 Radiological Environ Operating Rept Ja FitzPatrick Nuclear Power Plant + (00:11:06, 17 December 2024)
- 05000366/LER-1982-105, Forwards LER 82-105/03L-0 + (00:11:07, 17 December 2024)
- ML20065R402 + (00:11:07, 17 December 2024)
- ML20065R400 + (00:11:08, 17 December 2024)
- ML20065R395 + (00:11:10, 17 December 2024)
- ML20065R397 + (00:11:10, 17 December 2024)
- 05000269/LER-1982-015-03, /03L-0:on 820917,reactor Protection Sys Trip Pushbutton Declared Technically Inoperable.Caused by Procedure Deficiency Which Did Not Include Required Test. Necessary Procedures Changed + (00:11:12, 17 December 2024)
- 05000269/LER-1982-015, Forwards LER 82-015/03L-0.Detailed Event Analysis Encl + (00:11:13, 17 December 2024)
- NG-94-1147, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-331/94-01.Corrective Actions:Upon Discovery of Missed TS Surveillance,Aprms Declared Inoperable & Plant Entered LCO Until Surveillance Complete + (00:11:13, 17 December 2024)
- 3F1290-11, Monthly Operating Rept for Nov 1990 for Crystal River Unit 3 + (00:11:14, 17 December 2024)
- ML20065R375 + (00:11:14, 17 December 2024)
- ML20065R370 + (00:11:15, 17 December 2024)
- ML20065R363 + (00:11:16, 17 December 2024)
- ML20065R368 + (00:11:16, 17 December 2024)
- RBG-34145, Monthly Operating Rept for Nov 1990 for River Bend Unit 1.W/ + (00:11:17, 17 December 2024)
- ML20065R359 + (00:11:18, 17 December 2024)
- ML20065R348 + (00:11:18, 17 December 2024)
- ML20065R343 + (00:11:19, 17 December 2024)
- ML20065R331 + (00:11:20, 17 December 2024)
- ML20065R333 + (00:11:20, 17 December 2024)
- JAFP-94-0252, Special Rept 94-001 Re Fire Barrier Penetration Seals Not Restored within TS Time Frame.Caused by Scope of Work in Steam Tunnel.Roving Fire Watch Posted in Recirculation Motor Generator Set Room & Floor Plugs Removed + (00:11:21, 17 December 2024)
- ML20065R329 + (00:11:21, 17 December 2024)
- ML20065R315 + (00:11:22, 17 December 2024)
- ML20065R313 + (00:11:23, 17 December 2024)
- ML20065R305 + (00:11:24, 17 December 2024)
- ML20065R297 + (00:11:25, 17 December 2024)
- ML20065R296 + (00:11:26, 17 December 2024)
- RBG-40540, Forwards Endorsements 57-60 to Nelia Policy NF-0286, Endorsements 49-52 to Maelu Policy MF-0119,Endorsements 16 & 17 to Nelia Policy N-0100 & Maelu Policy M-0100 & Endorsement 11 to Nelia Policy NW-0178 + (00:11:27, 17 December 2024)
- ML20065R289 + (00:11:28, 17 December 2024)
- NRC-94-4117, Forwards Current Status of AP600 Testing Program Issues Identified in NRC ,Including Westinghouse Understanding of Mutual Conclusions Reached at 940407 Meeting + (00:11:28, 17 December 2024)
- 05000416/LER-1982-076-03, /03L-0:on 820923,smoke Detectors in Zones 2-06, 2-07,2-17 & 2-20 of Auxiliary Bldg Alarmed & Would Not Clear.No Smoke or Fire Present.Alarms Deactivated.Caused by Dust Accumulation.Detectors Cleaned + (00:11:30, 17 December 2024)
- ML20065R280 + (00:11:31, 17 December 2024)
- ML20065R278 + (00:11:32, 17 December 2024)
- ML20065R275 + (00:11:32, 17 December 2024)
- ML20065R272 + (00:11:33, 17 December 2024)
- ML20065R270 + (00:11:34, 17 December 2024)
- NRC-94-4116, Nonproprietary Passive Containment Cooling Sys Bench Scale Wind Tunnel Test + (00:11:34, 17 December 2024)
- 05000416/LER-1982-076, Forwards LER 82-076/03L-0 + (00:11:35, 17 December 2024)
- ML20065R254 + (00:11:35, 17 December 2024)
- ML20065R250 + (00:11:37, 17 December 2024)
- ML20065R246 + (00:11:38, 17 December 2024)
- ML20065R245 + (00:11:39, 17 December 2024)
- ML20065R235 + (00:11:40, 17 December 2024)
- 05000321/LER-1982-083-03, /03L-0:on 820915,QC Review Disclosed Installation of non-Q Part in Level Switch on a Loop Core Spray Discharge Line.Caused by Ineffective Administrative Procedures.Part Ordered.Required Q Functions Not Affected + (00:11:42, 17 December 2024)
- AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed + (00:11:42, 17 December 2024)
- ML20065R211 + (00:11:43, 17 December 2024)
- 05000324/LER-1982-113-03, /03L-0:on 821003,during Reactor Startup Coolant Analysis,Reactor Coolant Conductivity Exceeded Tech Specs. Caused by Breakdown of Reactor Water Cleanup Sys Resins. Resins Allowed to Decompose & Reactor Conductivity Reduced + (00:11:45, 17 December 2024)
- 05000321/LER-1982-083, Forwards LER 82-083/03L-0 + (00:11:46, 17 December 2024)
- 05000354/LER-1990-026-02, :on 901114,warmup of HPCI Sys Steam Supply Lines Conducted in Peparation for Restart During Forced Outage.Caused by Broken Pipe Support on Steam Supply Line. Design Change Request Initiated + (00:11:48, 17 December 2024)
- DCL-94-096, Forwards Substitution Page for Change 2 to Rev 18 of Physical Security Plan for Clarification Purposes Only.Page Withheld (Ref 10CFR73.21) + (00:11:49, 17 December 2024)
- U-601764, Monthly Operating Rept for Clinton Power Station Unit 1 for Nov 1990 + (00:11:52, 17 December 2024)