We#LF CREEK NUCLEAR OPERATING CORPORATION John A. Baby ve. Pr o.rn Nuclear Operations December 13. 1990 NO 90-0305 U. 8. Nuclear Regulatory Commission ATTN Document Control Desk Mall Station P1-137 Washington, D. C.
20$$$
Subject:
Docket No. 50-482: November, 1990 Monthly Operating Report Gentlemen:
Attached is the November, 1990 Monthly Operating Report for Wolf Creek Generating Station.
This submittal is being.made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly yours.
John A. Bailey Vice President Nuclear Operations JAE/jra Attachment cci A. T. Howell (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a M. E. Skow (NRC), w/a i
1
'. I
- 012180271 00113n
{DR Apocg 97,000482 PDR
[m' '
. O "' n $d(
"""'"'"""9*****"""*()"-**
An EquW Opportonny Empk yer MMCVET
. _ _ _ _ _ _ _ _ -. _. _. =
l Attachs.ent to NO 90-0305
.t l.
l t
WOLF CREEK 1AKLDJ1 OPERATI!G 00RIORATIQ4 i
NOLF CREEK GDERATIIG STATIGi lOMILY OPERATIlG REPGIT i
10m1:, thurber YEAR:
1990 l
Dxket Ib. : 50-482 Facility Operating License Ib. : NPF-42 Report !b. 69-l Pmpanxi by:
Merlin G. Williams l
a p
w.
7
m..__._._..._______._-..__..
i Attachinent to NO 90-0305 t
StNMARY
)
The follcwing report highlights the operating experience of Wolf Creo)
Generating Staticri for the month of N:msnber,1990. This report is being provide:1 pursuant to %chnical Specification 6.9.1.8.
a I
I.
SLNMARY OF OPDRTI!G EXPERIDCE The unit operated at 100% power th. yhout the month of Novmber with the exception of two power reductions te facilitate repairs.
The first power reduction occurred on Novunber 7 as a result of a partial loss of cooling on the aB" phase main transformer. Power was reduced to 87%
4 for approximately two hces to stabilire winding taperatures while repairs could be ccrpleted.
e Power was again reduced late Novunber 9 through November 12 for secondary system maintenance activities. Specifically, Main Feedwater Punp PAE01B underwent speed sensor replacement and Heater Drain Imps PAF01A and B were encapsulated to stop ongoing leakage. Reactor power was decreased to 55%
for the feedwater punp repair and increased to 95% until the heater drain punp repairs were ccmplete.
II. MMOR SAFEIT REIATED MAINTENAtCE ACTIVITIES i
No majar safety related maintenance activities were perfoned in !bvenbar.
y a-h Wolf Creek Generating Station lenthly Operating Rotort Ibvember 1990 Page 1 of 5 i
~.,..... _..,,,, -.. -,.,.,,, _, -
-~.,
.._.,,.._.---,---..,m,...
. - ~ _ -. _ _.., _ - _. _ _.,. -. _... -, -, _ _. -
Attachment to NO 90-0305 I
wERATDc twr> rmw DOCKET 10, 50-482 HOLF CREEK GE!ERATDG STA2' ION NOLF CREEK 1RKLEAR OP1RATI!G CCRIGATICN DATE 12-01-90 COPILTED BY M. WI.lli=.3 TELEPIENE & ~>64-8831 OPERATIlG STA7US 1.
Reporting Pericar_. Ibvunber,1990
_ Gross llours in Reporting Period: 720 3.
Currently Authorized Power Invel(Mft): 3411 F.r-Depand. Capacity (M&!bt):,_H25 Design Electrical Rating (Mbibt):
1170 3.
Power level to Which Rostricted (If Any)(Mhlbt):
N/A 4.
Roanons for restriction (If Any):
N/A 2his Itrith Yr. to Date Cunulative 5.
IMmber of 11ours Roactor was Critical 720.0 6,352.1 36,651.5 6.
Roactor Roservo Shutdown llotus 0.0 0.0 339.8 7.
Ilours Generator an Idne 720.0 6,292.7 36,079.8 8.
thit Rosorvo Shutdown llours 0.0 0.0 0.0.
9.
Gross shonnal Energy Ganorated (MI) 2,421,081 21,056,411 119,533,666
- 10. Gross Eloctrical Energy Generated (MNH)
__850J4c
.a41,223 41,620,170
- 11. Ibt Electrical Energy Generated (MI) 7,015,837 39,738,208
- 12. Roactor Service Factor 100.0 79.2 79.7,
- 13. Ronctor Availability Factor 100.0 79.2 80.5
- 14. Unit Service Factor 100.0 78.5 78.5
- 15. thit Availability Factor 100.0 78.5 78.5
- 16. thtt Capacity Factor (Using MDC) 100.0 77.1 76.5
- 17. Unit Capacity Factor (Using Design MWo) 97.0 74.8 73.9
- 18. Unit Forced Outage Rato 0.0 1.9 4.1
- 19. Shutdowns Schodulod Over !bxt 6 tenths (Typo, Date, and Duration of each): N/A
- 20. If Shut D:wn at End of Report Period, Estinated Date of Startup N/A Wolf Creek Generating Station Monthly Operating Report
!bvmber 1990 Page 2 of 5 l
l
'1
- A,ttachment to NO 90-0305 AWWGE IRILY DlIT POWER LEVEL DOC 30!.T NO.
50-482 WOLP CREEK GENERATDG STATICH EXE CREEK MCLEAR OPl! RATING CORPORATIN IATE 12-01-90 CCMPLETED BY M. Williams TELEPH NE 316-364-8831
)01m1 tbvmber, 1990 DAY AVERAGE DAILY POWER LEVEL IRY AVERAGE IRILY POWER LEVEL (MWe-Net)
(MWe-Net)
A 1149 17 1154 2
2-1150 18
- 154 3-1151 19
.152 4
1152 20
- J,0 5'
1153 21
- 11L I
6 1153 22 1155 7
1121 23 1153 8
1153 24 1156 9
1152 25 1156-10 764 26 1155 a
11 1069 27 1153
-i
-12' 1111 28 1155 13.
1152 29 1156 14.
1147 30 1155 15 1152 31 N/A 16 1152 Wolf Creek Generating Station-Monthly Operating Report Novm ber.1990 Page 3 of 5
Attachment to NO 90-0305 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.
50 482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 12-01-90 COMPLETED BY M. Williams REPORT 1.JNTH November. 1990 TELEPH)NE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S SCHEDULED (HOURS)
(I)
OR REDUCING PCrJER(2) 10 901109 S
0.0 A
5 Power was reduced to a low of S5I for replacement of *B*
main feedwater pump speed sensor and leak encapsulation on heater drain pumps
- A* and
- B".
t SUtMARY: The unit operated at or near IODI power throughout the month of November with the exception of power reductions on November 7 and November 9-12 for equipment repair.
- 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C:
Rt,t ut. LING G: OPERATIONAL ERROR (EXPLAIN) 3.
AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUE 3 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report November 1990 Page 4 of 5
Attochment to N0 90-0305 WOLF CREEK 1RCLEAR OPDaTI!G COUORTIOi WOLF CREEK GDERATIIG STATIQ4 UNIT 10.1 M0ml Ibvmber, 1990
SUMMARY
OF OPERATI!G EXPERIDCE Listad below in chronological seguence is a sunnary of operating experiences for this nanth which required load reduction or resulted in significant non-load mlated incidents.
DbG
.DE&
WDR lbvmber 1,1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.
Ibvmber 7, 1990 0533 hours0.00617 days <br />0.148 hours <br />8.812831e-4 weeks <br />2.028065e-4 months <br /> Degan reducing power to 87% due to partial loss of "B" phase nain transformer cooling.
1012 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.85066e-4 months <br /> Power increased to 98% following transfomer repair.
Ibvetnr 8,1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.
!bvmber 9,1990 2337 hours0.027 days <br />0.649 hours <br />0.00386 weeks <br />8.892285e-4 months <br /> Ccumenced power reduction for "B" main foodwater punp speed indicator repair, as well as encapsulation of leakage on heater drain pumps "A" and "B".
!bvomber 10, 1990 0350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> Unit at 55% power.
1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> Power increased to 65% per request of systm operations.
!bvmber 11, 1990 0050 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Increased power to approxinately 95% following main foodwater pump rupair.
!bvamber 12, 1990 1234 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.69537e-4 months <br /> Unit at 100% power following heater drain pump repairs.
!bvmber 30, 1990 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100% power.
Wolf Creek Generating Station Nonthly Operating Report l_
Ibvmber 1990 Page 5 of 5 i
,