Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000387/LER-1982-028, Forwards LER 82-028/03L-0 + (00:04:47, 17 December 2024)
- ML20065S350 + (00:04:47, 17 December 2024)
- ML20065S345 + (00:04:48, 17 December 2024)
- ML20065S344 + (00:04:49, 17 December 2024)
- ML20065S341 + (00:04:49, 17 December 2024)
- 05000334/LER-1982-041-03, /03L-0:on 821001,chlorine Detector CLA-VS-101C W/Zero Drip Rate & Dry Electrode Found During Routine Shift Surveillance.Caused by Foreign Matl Blocking Reservoir Orifice.Orifice Cleaned Out W/Wire + (00:04:54, 17 December 2024)
- ML20065S338 + (00:04:55, 17 December 2024)
- ML20065S335 + (00:04:56, 17 December 2024)
- ML20065S334 + (00:04:57, 17 December 2024)
- ML20065S333 + (00:04:59, 17 December 2024)
- ML20065S331 + (00:05:00, 17 December 2024)
- ML20065S329 + (00:05:00, 17 December 2024)
- 05000334/LER-1982-041, Forwards LER 82-041/03L-0 + (00:05:01, 17 December 2024)
- ML20065S327 + (00:05:01, 17 December 2024)
- PLA-1355, Forwards Amend 51 to OL Application,Consisting of Revision M to Ses Security Plan.Revision Withheld (Ref 10CFR2.790) + (00:05:02, 17 December 2024)
- ML20065S316 + (00:05:02, 17 December 2024)
- 05000298/LER-1982-020-03, /03L-0:on 821004,diesel Generator 2 Shutdown W/No Alarms or Indications.Water Found in Lube Oil Sys.Caused by Rupture of Left Cylinder Liner Expansion Seal on Diesel Engine.Seal Replaced & Part Returned to Vendor + (00:05:07, 17 December 2024)
- ML20065S311 + (00:05:09, 17 December 2024)
- W3P90-1579, Rept of Facility Changes,Tests & Experiments,890619-900618 + (00:05:11, 17 December 2024)
- NRC-94-4131, Informs That Review of NRC RAIs on AP600 for Proprietary Info Indicates That RAIs Contains No Info That Westinghouse Considers Proprietary + (00:05:12, 17 December 2024)
- ML20065S301 + (00:05:13, 17 December 2024)
- ML20065S302 + (00:05:13, 17 December 2024)
- ML20065S300 + (00:05:14, 17 December 2024)
- 05000327/LER-1990-030, :on 901115,automatic Start of Auxiliary Feedwater Sys Occurred.Caused by Faulty Mechanical Latch on Operating Coil.Faulty Relay Replaced + (00:05:15, 17 December 2024)
- RC-94-0133, Monthly Operating Rept for Apr 1994 for VC Summer Nuclear Station,Unit 1 + (00:05:16, 17 December 2024)
- 05000298/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Submitted + (00:05:17, 17 December 2024)
- JAFP-94-0259, Monthly Operating Rept for Apr 1994 for Ja FitzPatrick Nuclear Power Plant + (00:05:18, 17 December 2024)
- NRC-94-0040, Monthly Operating Rept for Apr 1994 for Fermi 2 + (00:05:18, 17 December 2024)
- ML20065S278 + (00:05:22, 17 December 2024)
- ML20065S277 + (00:05:23, 17 December 2024)
- PY-CEI-NRR-1803, Monthly Operating Rept for Apr 1994 for Perry Nuclear Power Plant + (00:05:24, 17 December 2024)
- 3F0594-06, Monthly Operating Rept for Apr 1994 for Crystal River Unit 3 + (00:05:28, 17 December 2024)
- ML20065S266 + (00:05:28, 17 December 2024)
- ML20065S264 + (00:05:29, 17 December 2024)
- BVY-90-122, Submits 30-day Response to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. Plant Design Does Not Include Isolation Condenser + (00:05:30, 17 December 2024)
- ML20065S255 + (00:05:30, 17 December 2024)
- BECO-90-154, Forwards Results of LOCA Analysis for Facility Performed Using GE SAFER/GESTR-LOCA Application Methodology Approved by NRC in .Results Withheld (Ref 10CFR2.790(b)(1)) + (00:05:31, 17 December 2024)
- ML20065S249 + (00:05:31, 17 December 2024)
- BSEP-90-0813, Submits Final Results of NRC Test Samples Received at Facility on 901009.Results Decay Corrected to 901001 Per Encl Instructions.W/O Instructions + (00:05:32, 17 December 2024)
- 05000237/LER-1982-028-03, /03L-0 Has Been Canceled + (00:05:34, 17 December 2024)
- HL-1382, Forwards Results of Radiochemical Analyses of Liquid Samples Sent to Util in Oct 1990 as Part of NRC Confirmatory Measurements Program.Samples Analyzed for tritium,Fe-55, Sr-89 & Sr-90 + (00:05:35, 17 December 2024)
- ML20065S245 + (00:05:35, 17 December 2024)
- ML20065S241 + (00:05:36, 17 December 2024)
- ML20065S239 + (00:05:37, 17 December 2024)
- BSEP-90-0795, Forwards Monthly Status Rept on Integrated Action Plan + (00:05:38, 17 December 2024)
- ML20065S233 + (00:05:39, 17 December 2024)
- ML20065S232 + (00:05:40, 17 December 2024)
- NRC-90-0169, Monthly Operating Rept for Nov 1990 for Fermi 2 + (00:05:41, 17 December 2024)
- ML20065S229 + (00:05:42, 17 December 2024)
- ML20065S228 + (00:05:43, 17 December 2024)
- ML20065S223 + (00:05:44, 17 December 2024)