ML20065S301
| ML20065S301 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/07/1990 |
| From: | Dulick A DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20065S305 | List: |
| References | |
| NUDOCS 9012200203 | |
| Download: ML20065S301 (2) | |
Text
'
N e
'Af M
wpnone t4m m >x wguga;G,rcun Shippmgmirt $ A 1%77Mh4 December 7, 1990 Document-Control Desk 4
I U.S. Nuclear Regulatory Commission Washington,-DC 20555' NPDES Permit Number PA0025615 Renewal l
i l
SUBJECT:
- BVPS No. 1 and No. 2 Docket No. 50-334 i
Licenso'DPR-66 j
Dear Sir:
.As. required by -Appendix B
to Facility Operating License No.
NPD-764,. _ Beaver Valley Power Station, Unit 2 Environmental Protection Plan (Nonradiological), enclosed is a copy of NPDES Permit PA0025615, renewed andE issued on September 27,.1990.
Please-be advised that an appeal to the Environmental Hearing Board was registered on October 26, 1990 -by Duquosno Light Company on behalf of Beaver Valley Power Station.
No-date has been set for the hearing therefore we=bogan implementing _the now permit on November 1, 1990.
1 Very truly yours,-
y A..M. Dulick Chemistry Manager
- DNH/ijj-3 d/h['
0 p
9012200203 901207ADOCK0500g4
!0 (
o 0
{
g',DR
~
r i
_. _ =. - - - -
-l..
hol) 9-zMo 4
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL RESOURCES PENN sYtVANI A BUREAU OF WATER QUALITY MANAGEMENT Highland Building
'.21 South Highland Avenue Pittsburgh, Pennsylvania 15206-398B (412) 645-7100 (answers 24 hrs.)
CERTIFIED MAIL #P 249 041 686 SEP 2 71990 1
Duquesne Light Company One Oxford Center 301 Grant Street Pittsburgh, PA 15219 RE:
NPDES Permit PA0025615 Beaver Valley Power Station Shippingport Borough Beaver County Gentlemen:
Your NPDES permit is enclosed.
Please study it carefully, and if you have any questions, please contact me.
EPA will be sending you computer generated, preprinted Discharge Monitoring Report (DMR) forms for your submittals.
In the event that these forms are not received, use the Department's DMR forms. The Department will be forwarding OMR forms within two weeks.
Should you find significant discrepan-cies between the two versions, contact this office and use the attached form until the preprinted forms are corrected. Do not allow a problem with the preprinted forms to cause your failure to submit these reports in a timely man-ner as this will result in violations of your permit.
The Department has addressed your comments in the Addendum to the Fact Sheet, a copy of which is enclosed.
Sinc ely,
&&77 lKareenMilcic Sanitary Engineer KM: kid:
cr Enclosure cc:
EPA l
Operations Section l
Recycled Peper N)
I
-