ML20065S239
| ML20065S239 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 12/03/1990 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 90-667, NUDOCS 9012200163 | |
| Download: ML20065S239 (4) | |
Text
e.
]
0, YlitOINTA ELI:cTnic Axt> l'own:n Co>inwNy H :c at >t ox o, V HOINIA 20061 December 3,1990 g',N
@Db Mr. Stewart D. Ebneter Serial No.
90 667 Regional Administrator NL&P/JYR:R7 U.S. Nuclear Regulatory Commission Docket Nos.
50 338 Region ll 50 339 101 Marietta Street, N.W.
License Nos. NPF-4 Suite 2900 NPF 7 Atlanta, Georgia 30323 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO INSPECTION REPORT 50 338&339/90 22 SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE Virginia Electric and Power Company has reviewed the initial report dated October 23, 1990 on the Systematic Assessment of Licensee Performance (SALP) for the period of June 1,1989 through August 31,1990 for North Anna Power Station. On November 7, 1990 we met with you and members of your staff to discuss the assessment.
The recognition of the strengths noted in the report was appreciated, and we are committed.to building upon those strengths. Also, we will make every effort to strengthen our performance in those areas where weaknesses were identified.- After reviewing the report, we have comments regarding the SALP board's assessment in the functional areas of Radiological Controls pnd Security.
~
L in the functional area of Radiological Controls a Category 2 rating was assigned. The principle reason for the Category 2 rating cited by the SALP board was the high collective dose during the assessment period. Our assessment is that North Anna's collective exposure has continued to decline from previous years. The reduced i
exposure experienced during this SALP period reflects programs that have been-implemented and are expected to reduce future dose. Lastly, it appears that some of the SALP board observations regarding the collective doses during planned refueling-outages included events that occurred outside the assessment period.
The attachment provides further information that we hope you will consider in the development of the final SALP report.
I gg22ggg gagggge g, of g
r In the functional area of Security, the report's Summary of Results might be interpreted such that a reader could draw the conclusion that a pervasive drt prob'em exists at North Anna We request that the summary be reviewed and revis( to reflect that the event of concern was an isolated instance and did not involve a drug issue on site. In addition, the Summary of Results described the performance of Security as
- satisfactory during the assessment period, but declined from the last period." The attachment provides further information regarding the performance of Security during the assessment period that we hope you will consider in the development of the final SALP report.
Your consideraGen of our comments in determining the final assessment in these functional areas is appreciated, it is our position that both the radiological protection and security areas have performed in a superior manner during the SALP period and consideration of Category 1 rating is recommended.
Finally, one editorial comment is provided in the attachment.
If you have any questions or require additional information regarding our comments, please contact us.
Very truly yours, b'
W. L. Stewart Senior Vice President Nuclear Attachment cc:
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station l
t
~
Viralnla Electric and Power Comoany
~
North Anna Power Station
~
Comments on the Initial SALP ReDort Radiological Controls Radiological Controls received a Category 2 rating in the initial SALP report. The report documented actions underway to improve our performance in this functional M
area, but also highlighted continuing NRC concerns. The SALP board stated that despite the dose reduction initiatives during the assessment period, overall collective E
dose remained high.
The SALP board further commented that additional management emphasis on the pursuit and effective implementation of good ALARA practices was warranted.
In our view, Virginia Electric and Power Company has a very strong commitment to reducing radiation exposure. This is exemplified by both our ongoing programs which have reduced radiation exposure and our commitment to implement additional changes that will continue to result in dose reductions in the future. As acknowledged in the SALP report, you are aware of several effective dose reduction measures and practices currently implemented. Those include programs such as source term reduction, improved job planning, and increased management attention through reports and trending analyses.
The SALP board's assessment that our overall collective dose remained high is somewhat misleading. The SALP assessment period covered June 1,1989 through August 31,1990. During this evaluation period, North Anna's exposure normalized to one year was 201 man rem per unit, and the total exposure during the SALP period was less than 252 man rem per unit. As a comparison, the 1989 industry average based on AEOD data was 337 man rem per unit.
For 1990, which included a major refueling and ten years inservice Inspection outage of 72 days, the North Anna exposure is currently 302 man rem per unit.
These results directly reflect the aggressive management involvement in and the effectiveness of the ALARA and source term reduction programs during both outage and non outage operations. Also, the collective dose incurred duri1g the 1989 Unit 1 outage have already been considered by the SALP board and was documented in the previous SALP report (see page 15 of IR 8916 dated August 15,1989).
The major contributor to collective personnel exposure at Norin Anna is the extensive inspection of steam generators that occur each outage. The scope of the steam generator inspection and plugging activities routinely exceeds that required by the Technical Specifications and results in approximately one third of collective radiation exposure received. However, we believe that this additional exposure has been and continues to be warranted to better assure a high state of operating nuclear safety.
Based on the above, we recommend that Radiological Controls be considered for a Category 1 rating in the final SALP report.
Security Security received a Category 2 rating in the initial SALP report. Two NRC inspections in the functional area of security were conducted during the assessment period (April 23 27, 1990 and July 9 13, 1990) and documented in Inspection Reports 90 08 and 9017, respectively. Those inspections were, from our perspective, a major input to the SALP board's deliberations and assessment of Security at North Anna. Based on these inspection reports, no programmatic or performance issues were identified. As a result, we have two comments on the SALP Summary of Results.
Our first comment involves the phrase "a problem with follow-up of a drug issue at the site" that was used in page 5 the Summary of Results. The use of the phrase " drug issue"is open to many, often detrimental, interpretations. NRC Inspection Report 90-17 documents NRC follow up to an anonymous allegation regarding the discovery of a possible illegal substance outside of the Protected Area and a breakdown in communications that occurred between the site Security organization and the Louisa County Sheriff's Department. When identified, immediate corrective actions to enhance the notification process were implemented and policies were established to ensure proper follow up in the future. We feel that those actions will preclude any future communications breakdown. To our knowledge, this was the first breakdown in communications experienced within the Security organization. NP.C's evaluation of the circumstances of the event determined that a violation of regulatory requirements had not occurred.
Our second comment is the phrase " satisfactory during the assessment period, but declined from the last period" used in page 4 of the Summary of Results. NRC Inspection Report 90-08 identified two non citad violations, one in the area of access control and one in the area of inadequate searches.
Those concerns were immediately corrected and did not reflect programmatic breakdowns. Those corrective actions have been successful.
NRC Inspection Report 9017 also stated: " Inspection findings confirm continued improvement in the effectiveness of the security program. Security personnel appear to be motivated and professionalin their approach to duty performance." We feel that this statement better represents Security's performance during the SALP period, in contrast with the phrase used in the Summary of Results.
Based on the above, we recommend that Security be considered for a Category 1 rating in the final SALP report.
Editorial Comment A sentence on page 5 under Plant Operations, second paragraph, seems to be missing a word, it appears to us that the sentence should read:"Significant progress was made in this area (that or which) was identified as needing improvement during the last assessment period."
_