- 05000219/LER-1983-006-03, /03L-0:on 830206,all Automatic Valves Not Lined Up Properly During Execution of Standby Gas Treatment Sys 10 H Operability Test.Caused by Condensation in Fan 1-9 Low Flow Sensing Lines.Lines Cleaned + (16:18:35, 16 December 2024)
- ML20069A761 + (16:18:37, 16 December 2024)
- ML20069A759 + (16:18:38, 16 December 2024)
- 05000324/LER-1983-023, Forwards LER 83-023/03L-0 + (16:18:39, 16 December 2024)
- ML20069A756 + (16:18:40, 16 December 2024)
- 05000219/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl + (16:18:41, 16 December 2024)
- PLA-1534, Updated Final Deficiency Rept Re Defects in Agastat GP Series Relays.All safety-related Relays,Except Relays in Diesel Generator Panels,Replaced W/New Qualified Relays + (16:18:41, 16 December 2024)
- ML20069A740 + (16:18:44, 16 December 2024)
- ML20069A743 + (16:18:44, 16 December 2024)
- ML20069A737 + (16:18:45, 16 December 2024)
- 05000219/LER-1983-002-03, /03L-0:on 830123,startup Banks Removed from Svc Due to Dilution Plant Main Breaker Cable Termination Failure.Cause Under Investigation.Dilution Pump Power Feed Terminations Replaced + (16:18:47, 16 December 2024)
- ML20069A724 + (16:18:48, 16 December 2024)
- ML20069A733 + (16:18:48, 16 December 2024)
- 05000219/LER-1983-002, Forwards LER 83-002/03L-0.Detailed Event Analysis Encl + (16:18:50, 16 December 2024)
- ML20069A719 + (16:18:50, 16 December 2024)
- 05000280/LER-1983-011-03, /03L-0:on 830211,instrument Air Check Valve to PORV Found Installed Backwards.Caused by Installation Error During Implementation of Design Change 79-53.Valve Removed & Reinstalled in Correct Orientation + (16:18:52, 16 December 2024)
- ML20069A706 + (16:18:53, 16 December 2024)
- 05000219/LER-1983-005-03, /03L-0:on 830126,while Performing Containment Spray Sys Automatic Actuation Test,High Drywell Pressure Switches IP15A,B & C Tripped at Value Greater than Tech Spec Limit.Cause Not Determined.Pressure Switches Readjusted + (16:18:55, 16 December 2024)
- ML20069A702 + (16:18:55, 16 December 2024)
- ML20069A700 + (16:18:56, 16 December 2024)
- 05000382/LER-1994-007, :on 940426,automatic Reactor Trip Occurred Due to Low Pressurizer Pressure Core Protection Calculator Auxiliary Trip.Corrective Action:Replacing Faulty Relay & Removing Reactor Power System from Service + (16:18:58, 16 December 2024)
- 05000280/LER-1983-010-03, /03L-0:on 830207,activity Samples of RCS Indicated Dose Equivalent I-131 Level Greater than Tech Spec Following Reactor Trip.Caused by Fuel Element Defect in Reactor Core. Accelerated Sampling Frequency Implemented + (16:19:00, 16 December 2024)
- 05000219/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Encl + (16:19:01, 16 December 2024)
- ML20069A688 + (16:19:01, 16 December 2024)
- ML20069A686 + (16:19:02, 16 December 2024)
- 05000387/LER-1983-025-03, /03L-0:on 830204,reactor Recirculation Pump a Tripped off-line During Startup Test Program.Caused by Deficiency in Silicon Controlled Rectifier,Resulting in High Field Circuit Current.Voltage Regulator Board Replaced + (16:19:03, 16 December 2024)
- 05000277/LER-1983-003-03, /03L-0:on 830206,coolant Leak Discovered in Cooling Sys of Diesel Driven Fire Pump.Caused by Leaking Water Pump Shaft Seal.Replacement Pump Placed in Svc on 830209 + (16:19:05, 16 December 2024)
- ML20069A678 + (16:19:06, 16 December 2024)
- 05000387/LER-1983-025, Forwards LER 83-025/03L-0 + (16:19:07, 16 December 2024)
- 05000271/LER-1994-007, :on 940420,SBGTS Initiation & Reactor Building Ventilation Isolation Occurred Concurrent W/Pcis Group III Isolation.Caused by Dirty/Oxidized Contacts on Switch. Corrective Action:Cleaning Switch Contacts + (16:19:09, 16 December 2024)
- ML20069A673 + (16:19:10, 16 December 2024)
- ML20069A666 + (16:19:13, 16 December 2024)
- ML20069A664 + (16:19:14, 16 December 2024)
- 05000387/LER-1983-022-03, /03L-0:on 830203,reagent Gas Bottle (Oxygen) for Hydrogen Analyzer Found Exhausted During Startup Test Program.Caused by Periodic Gas Bottle Pressure Check Omission & Inadequate Storeroom Min Inventory + (16:19:16, 16 December 2024)
- ML20069A659 + (16:19:17, 16 December 2024)
- 05000387/LER-1983-022, Forwards LER 83-022/03L-0 + (16:19:19, 16 December 2024)
- ML20069A653 + (16:19:19, 16 December 2024)
- ML20069A648 + (16:19:20, 16 December 2024)
- ML20069A640 + (16:19:24, 16 December 2024)
- 05000281/LER-1983-006-03, /03L-0:on 830214,during Full Power,Trip Valve TV-DA-200B Failed to Close When Containment Sump Pump Stopped.Caused by Defective solenoid-operated Valve.Valve Replaced + (16:19:26, 16 December 2024)
- ML20069A632 + (16:19:27, 16 December 2024)
- ML20069A631 + (16:19:28, 16 December 2024)
- ML20069A630 + (16:19:28, 16 December 2024)
- ML20069A629 + (16:19:29, 16 December 2024)
- ML20069A626 + (16:19:30, 16 December 2024)
- 05000281/LER-1983-005-03, /03L-0:on 830211,during Full Power Test PT-15.1C, Turbine Driven Auxiliary Feed Pump Ran Intermittently.Caused by Corrosion Piston of Pump Governor Regulator.Piston Cleaned + (16:19:31, 16 December 2024)
- 05000247/LER-1983-003, Forwards LER 83-003/01T-0 + (16:19:32, 16 December 2024)
- 05000318/LER-1983-008-03, /03L-0:on 830131,containment Spray Header 21 Isolation Valve CV-4150 Found to Stroke Only Partially, Rendering Containment Spray Header 21 Inoperable.Caused by Improper Adjustment of Spring Adjuster.Adjustment Corrected + (16:19:34, 16 December 2024)
- ML20069A610 + (16:19:36, 16 December 2024)
- ML20069A603 + (16:19:36, 16 December 2024)
- 05000318/LER-1983-008, Forwards LER 83-008/03L-0 + (16:19:37, 16 December 2024)