ML20069A700
| ML20069A700 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 02/28/1983 |
| From: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-SSINS-6820 IEB-82-04, IEB-82-4, IPN-83-17, JPN-83-17, NUDOCS 8303160206 | |
| Download: ML20069A700 (2) | |
Text
n.
POWER AUTHORITY OF THE STATE OF NEW YORK 10 CcLUMeus CIRCLE NEW YORK. N. Y.10019 (2128 397-6200 LEROY W. SINCLAIR esmats er um T R U S T E ES W A LTER T. KICINSM B 8JM-83-D JOHN S. DYSON p,ast a n scutiv s we e nous =a en vows GEORGE L. ING ALLS February 28, 19 8 3
'o$'l",";,5c"T ""
'",". 7,",",' ' " "
RICH A RD M. FLYNN RO BE RT f. MILLONZB
& OENE R AL COUNSEL JAMESL.LAROCCA United States Nuclear Regulatory Commj.ssion Region I 631 Park Avenue King of Prussia, PA 19406 Attention:
Mr. Ronald C.
Haynes Regional Administrator
Subject:
James A. FitzPatrick Nuclear Power Plant Docket Nc. 50-333 Response to IE Bulletin No. 82-04
Reference:
NRC IE Bulletin No. 82-04, " Deficiencies in Primary Containment Electrical Penetration Assemblies," dated December 3, 1982.
Dear Sir:
The Power Authority has reviewed the subject IE Bulletin and has determined that Bunker Ramo electrical penetration assemblies which use the hard epoxy module design are not installed or planned to be installed in safety-related systems at the plant.
Very truly yours, J.
ayne M xecutive Vice President Nuclear Generation State of New York County of'Westchester Subscribed and Swqr[aA c/v n to before me this
< V Da.y' of '//
1983
):.s
/u h. <1~w
/ \\ Notary Public ws
[.
'sa6 Y I
/h s
8303160206 830228 PDR ADOCK 05000333
/v G
/
Attachment to JPN-83-17 February 28, 1983 James A. FitzPatrick Nuclear Power Plant cc: Mr. J.
Linville Resident Inspector U.
S. Nuclear Regulatory Commission P. O. Box 136 Lycoming, NY 13093 Document Control Desk U.
S. Nuclear Regulatory Commission Washington, DC 20555