Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069M289 + (15:21:23, 16 December 2024)
- ML20069M285 + (15:21:24, 16 December 2024)
- ML20069M273 + (15:21:25, 16 December 2024)
- ML20069M269 + (15:21:27, 16 December 2024)
- ML20069M265 + (15:21:29, 16 December 2024)
- ML20069M266 + (15:21:29, 16 December 2024)
- 0CAN118213, Responds to Transmitting SER Re IE Bulletin 80-11, Masonry Wall Design. Field Survey Confirmed No Large Items Attached to Walls.Stress Resultants Acceptable. No Further Wall Surveys Planned + (15:21:30, 16 December 2024)
- L-83-271, Forwards Three Relief Requests from Certain Tech Spec 4.4.10.1.a & 10CFR50.55(g) Inservice Insp Requirements. Approval Required During Current Outage + (15:21:30, 16 December 2024)
- ML20069M256 + (15:21:31, 16 December 2024)
- ML20069M254 + (15:21:35, 16 December 2024)
- 05000387/LER-1983-051, Forwards LER 83-051/03L-0 + (15:21:36, 16 December 2024)
- ML20069M252 + (15:21:36, 16 December 2024)
- ML20069M242 + (15:21:37, 16 December 2024)
- 05000254/LER-1983-015-03, /03L-0:on 830405,reactor Bldg & Control Room Ventilation Sys Isolated & Standby Gas Treatment Autostarted.Caused by Failure of Relay Coil 1701-100A.Coil Replaced.Relay Will Be Replaced + (15:21:42, 16 December 2024)
- NRC-94-4170, Discusses Progress Made in AP600 Design Certification Program in Listed Areas of Testing.Requests Meeting Be Held to Further Discuss Process for Final SER Approval.Proposed AP600 Design Certification Schedule Encl + (15:21:43, 16 December 2024)
- 0CAN038317, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/83-01 & 50-368/83-01.Corrective Actions:Revised Procedure Incorporating Three Sample Requirements Into Step 7.2.4 & Provided Proper Training for Applicable Personnel + (15:21:44, 16 December 2024)
- ML20069M232 + (15:21:44, 16 December 2024)
- ML20069M228 + (15:21:45, 16 December 2024)
- ML20069M231 + (15:21:45, 16 December 2024)
- ML20069M225 + (15:21:46, 16 December 2024)
- 05000254/LER-1983-015, Forwards LER 83-015/03L-0 + (15:21:47, 16 December 2024)
- ML20069M222 + (15:21:47, 16 December 2024)
- ML20069M219 + (15:21:48, 16 December 2024)
- ML20069M218 + (15:21:49, 16 December 2024)
- ML20069M217 + (15:21:49, 16 December 2024)
- 05000370/LER-1994-002-04, :on 940518,discovered That RCS Fluoride & Chloride Analysis Performed on 940513 Nonrepresentative of Typical Water Sample.Caused by Improper Work Practices. Chemistry Data Plot Data Reviewed for Validity + (15:21:51, 16 December 2024)
- 05000334/LER-1979-023, Forwards Updated LER 79-023/03X-1 + (15:21:55, 16 December 2024)
- ML20069M203 + (15:21:56, 16 December 2024)
- ML20069M200 + (15:21:57, 16 December 2024)
- 05000364/LER-1994-003, :on 940603,several MSSVs Found to Lift Settings Outside Tolerance Band.Caused by Inaccuracy in Mean Seat Area Term of Equation Used to Calculate Lift Setpoint for Furmanite Trevitest Sys.Trevitest Sys Revised + (15:21:58, 16 December 2024)
- ML20069M193 + (15:21:59, 16 December 2024)
- L-83-251, Final Deficiency Rept 83-009 Re Condensate Storage Tank Damage.Initially Reported on 830322.Caused by Condensation of Steam Creating Local Vacuum Conditions.Double Butt Welded Plates Installed,Cracks Sealed & Designs Improved + (15:22:00, 16 December 2024)
- ML20069M191 + (15:22:00, 16 December 2024)
- ML20069M189 + (15:22:01, 16 December 2024)
- ML20069M186 + (15:22:02, 16 December 2024)
- 05000325/LER-1994-003-02, :on 940603,repair Activities on Main Stack WRGM Sample Pump Inadvertently de-energized Monitor,Resulting in Unplanned Actuations W/Cis.Caused by Personnel Error.Mgt Expectations Reinforced + (15:22:03, 16 December 2024)
- ML20069M182 + (15:22:04, 16 December 2024)
- GO2-83-349, Part 21 Rept Re Linear Indications Identified in SA 106 Grade Pipe.Initially Reported on 830413.Caused by Mfg Process Error & Ultrasonic Exam Inadequacies.All Seamless Pipe Put on Hold & Magnetic Particle Examined + (15:22:05, 16 December 2024)
- ML20069M176 + (15:22:08, 16 December 2024)
- ML20069M172 + (15:22:09, 16 December 2024)
- BSEP-83-1260, Supplemental Response to Part 21 Rept Re Postulated Pipe Crack in Hpci,Rcic,Reactor Water Cleanup Sys & Main Steam Line Drains.Required Mods Will Be Installed to Meet Requirements of Environ Qualification Program + (15:22:10, 16 December 2024)
- ML20069M164 + (15:22:10, 16 December 2024)
- ML20069M152 + (15:22:11, 16 December 2024)
- ML20069M156 + (15:22:11, 16 December 2024)
- ML20069M145 + (15:22:12, 16 December 2024)
- ML20069M146 + (15:22:12, 16 December 2024)
- ML20069M144 + (15:22:13, 16 December 2024)
- 05000339/LER-1983-025-03, /03L-0:on 830331,w/unit in Mode 1,steam Generator B Water Level Channel 1 high-high Turbine Trip/Feedwater Isolation Setpoint Discovered Greater than Tech Spec Limit. Caused by Malfunctioning Comparator Card.Card Replaced + (15:22:16, 16 December 2024)
- ML20069M139 + (15:22:17, 16 December 2024)
- 05000339/LER-1983-025, Forwards LER 83-025/03L-0 + (15:22:20, 16 December 2024)
- ML20069M130 + (15:22:21, 16 December 2024)