Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50-362 UNIT NAME: _JONGS - 3 DATE:
REVISION COMPLETED BY:
R. L. Kaplan TELEPHONE:
(714) 368-6334 0P_ffLAIJNG_SIAIUS 1.
Unit Name: _ San _On_ofre Nuclgar_Generaling_31ation. Unit 3 2.
Reporting Period:
February 1994 3.
Licensed Thermal Power (MWt):
3390 4.
Nameplate Rating (Gross MWe): _
1127 5.
Design Electrical Rating (Net MWe):
1030 6.
Maximum Dependable Capacity (Gross MWe): __1127 7.
Maximum Dependable Capacity (Net MWe):
1Q&Q_
8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 672m00 1.415AQ 86JQ4 a0_.
12.
Number Of Hours Reactor Was Critical 6Z2JD 1.416200 67.142A 13.
Reactor Reserve Shutdown Hours Q100 0.00 0.00_
14.
Hours Generator On-Line 672JQ 1.41_6JD 6L112JL 15.
Unit Reserve Shutdown Hours 0.0D __
OJO _,_
0JQ_
16.
Gross Thermal Energy Generated (MWH) 2 0/1 444 2_4_
4 ML256.,JJ 111J8iD5193_
17.
Gross Electrical Energy Generated (MWH) ZO8,7_40JQ f.134 53bdL _Z1JZZa43100__
2 2
2 2
67,217.i11 d4 18.
Net Electrical Energy Generated (MWH) 6Z0J51 QQ 1d141538200 72 19.
Unit Service Factor 100100%
lQ0AQ%
15J23
_Z5J2%
1Q0100_3
_72 153 20.
Unit Availability Factor 10DJQ%
21.
Unit Capacity Factor (Using MDC Net) 92.44%
9_51 1 1
1 22.
Unit Capacity Factor (Using DER Net) 92 443 95.11%
_J_2 153 1
23.
Unit Forced Outage Rate 0.0Q%
0.00%
6.75%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eact):
None 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 3
9406210107 940615 PDR ADOCK 05000361 R
Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _10:162 UNIT NAME: _SQ_NGS - 3 DATE:
REVISION COMPLETED BY:
R. L. Kaplan TELEPHONE:
(714) 368-6834 OPERATING STATUS 1.
Unit Name: _ San Onofre Nuclear Generating Station. Unit 3 2.
Reporting Period:
March 1R94 3.
Licensed Thermal Power (MWt):
3_390 4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rating (Net MWe):
1Q_80 6.
Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity (Net MWe):
1080 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744 Q0 2.160.QQ 87.648.00 12.
Number Of Hours Reactor Was Critical 744 00 2,_15Q10D 68.086.45 1
13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.QQ_
14.
Hours Generator On-Line 744.Q0 2.16Q100 66.456.62_-
15.
Unit Reserve Shutdown Hours 0.QQ 0.00 0.00 16.
Gross Thermal Energy Generated (MWH)
L_4_Q3. 396.03 _E19311662 2_4.111587.451.95_
1 Ne 1
1c ner e rat M
~
19.
Unit Service Factor 1DQ1QQ%
100.Q05 75.82%
20.
Unit Availability Factor 100.Q0%
100.00%
75.82%
21.
Unit Capacity Factor (Using MDC Net) 99120%
96.1525 72.38%
22.
Unit Capacity Factor (Using DER Net) 9R120%
96 12%
72.31%
1 23.
Unit Forced Outage Rate 0.00%
0.0QM 6.68%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 4
j
I Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: _50-362 UNIT NAME: _ SONGS - 3 DATE:
REVISION COMPLETED BY:
R. L. Kaplan TELEPHONE:
(714) 363_-6134 MONTH:
Mar _)_1194 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY F0WER LEVEL (MWe-Net)
(MWe-Net) 1 IQZ6.79 16 107_1,04 2
1QZ6113 17 1Q54.67 3
10Z3.63 18 1072.58 4
1Q55.63 19 1054.58 l
5 1039.75 20 1072.79 6
IQ72 QB 21 1Q71.25 7
1QZ3.33 22 1071.67 8
1074.54 23 1057.04 9
1074.50 24 1075.54 10 10Z.4. 50 25 1072.75 11 10Z3142 26 1070.92 12 1QZQ213 27 1D13.58 13 1QE9.79 28 1076.17 14 1074.BB 29 1074.88 15 1QZZ,36 30 1073.83 31 1073.79 I
i 5
1 Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: J0:362 UNIT NAME:
SONGS - 3 DATE:
REVISION COMPLETED BY:
R. L. Kaplan TELEPHONE:
(714) 368-6834 OPERATING _SIAIUS j
_S n_Dnof re NucleAt _Generalin_gjiation. Urtit 3 1.
Unit Name:
4 2.
Reporting Period:
April 1994 3.
Licensed Thermal Power (MWt):
3390 4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rating (Net MWe):
1010 6.
Maximum Dependable Capacity (Gross MWe): __1127 7.
Maximum Dependable Capacity (Net MWe):
1QRQ 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 719100 2JZ910D 8SJ6?JQ_
12.
Number Of Hours Reactor Was Critical 7131QQ 2.879_109 68.805.45 13.
Reactor Reserve Shutdown Hours Q10D Q1QQ 0.00 14.
Hours Generator On-Line 701109 2.861109 67.157.98 15.
Unit Reserve Shutdown Hours
_Q1DQ 0.QQ 0.00
!k
$ $$ E cWic$Ebry"be at WH 1
Q I
18.
Net Electrical Energy Generated (MWH) 733.833.00 _2JJ5.443&QQ _f21248 41 L 14_
19.
Unit Service Factor 9Z111%
99.33%
76190%
20.
Unit Availability Factor 97.51%
99.38%
76.00%
21.
Unit Capacity Factor (Using MDC Net) 94.50%
96102%
71116g 22.
Unit Capacity Factor (Using DER Net) 94.50%
96 02%
72 15%
2 1
23.
Unit Forced Outage Rate Q10Q%
0 DQ%
6.61%
4 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Rone 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 6
I