Revised Monthly Operating Repts for Feb 1994 for San Onofre Nuclear Generating Station,Unit 3
ML20069M156
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/28/1994
From: Kaplan R
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20069M109 List:
References
NUDOCS 9406210187
Download: ML20069M156 (4)


Text

.

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50-362 UNIT NAME: _JONGS - 3 DATE:

REVISION COMPLETED BY:

R. L. Kaplan TELEPHONE:

(714) 368-6334 0P_ffLAIJNG_SIAIUS 1.

Unit Name: _ San _On_ofre Nuclgar_Generaling_31ation. Unit 3 2.

Reporting Period:

February 1994 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe): _

1127 5.

Design Electrical Rating (Net MWe):

1030 6.

Maximum Dependable Capacity (Gross MWe): __1127 7.

Maximum Dependable Capacity (Net MWe):

1Q&Q_

8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 672m00 1.415AQ 86JQ4 a0_.

12.

Number Of Hours Reactor Was Critical 6Z2JD 1.416200 67.142A 13.

Reactor Reserve Shutdown Hours Q100 0.00 0.00_

14.

Hours Generator On-Line 672JQ 1.41_6JD 6L112JL 15.

Unit Reserve Shutdown Hours 0.0D __

OJO _,_

0JQ_

16.

Gross Thermal Energy Generated (MWH) 2 0/1 444 2_4_

4 ML256.,JJ 111J8iD5193_

17.

Gross Electrical Energy Generated (MWH) ZO8,7_40JQ f.134 53bdL _Z1JZZa43100__

2 2

2 2

67,217.i11 d4 18.

Net Electrical Energy Generated (MWH) 6Z0J51 QQ 1d141538200 72 19.

Unit Service Factor 100100%

lQ0AQ%

15J23

_Z5J2%

1Q0100_3

_72 153 20.

Unit Availability Factor 10DJQ%

21.

Unit Capacity Factor (Using MDC Net) 92.44%

9_51 1 1

1 22.

Unit Capacity Factor (Using DER Net) 92 443 95.11%

_J_2 153 1

23.

Unit Forced Outage Rate 0.0Q%

0.00%

6.75%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eact):

None 25.

If Shutdown At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 3

9406210107 940615 PDR ADOCK 05000361 R

PDR

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _10:162 UNIT NAME: _SQ_NGS - 3 DATE:

REVISION COMPLETED BY:

R. L. Kaplan TELEPHONE:

(714) 368-6834 OPERATING STATUS 1.

Unit Name: _ San Onofre Nuclear Generating Station. Unit 3 2.

Reporting Period:

March 1R94 3.

Licensed Thermal Power (MWt):

3_390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net MWe):

1Q_80 6.

Maximum Dependable Capacity (Gross MWe):

1127 7.

Maximum Dependable Capacity (Net MWe):

1080 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744 Q0 2.160.QQ 87.648.00 12.

Number Of Hours Reactor Was Critical 744 00 2,_15Q10D 68.086.45 1

13.

Reactor Reserve Shutdown Hours 0.00 0.00 0.QQ_

14.

Hours Generator On-Line 744.Q0 2.16Q100 66.456.62_-

15.

Unit Reserve Shutdown Hours 0.QQ 0.00 0.00 16.

Gross Thermal Energy Generated (MWH)

L_4_Q3. 396.03 _E19311662 2_4.111587.451.95_

1 Ne 1

1c ner e rat M

~

19.

Unit Service Factor 1DQ1QQ%

100.Q05 75.82%

20.

Unit Availability Factor 100.Q0%

100.00%

75.82%

21.

Unit Capacity Factor (Using MDC Net) 99120%

96.1525 72.38%

22.

Unit Capacity Factor (Using DER Net) 9R120%

96 12%

72.31%

1 23.

Unit Forced Outage Rate 0.00%

0.0QM 6.68%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 25.

If Shutdown At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 4

j

I Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: _50-362 UNIT NAME: _ SONGS - 3 DATE:

REVISION COMPLETED BY:

R. L. Kaplan TELEPHONE:

(714) 363_-6134 MONTH:

Mar _)_1194 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY F0WER LEVEL (MWe-Net)

(MWe-Net) 1 IQZ6.79 16 107_1,04 2

1QZ6113 17 1Q54.67 3

10Z3.63 18 1072.58 4

1Q55.63 19 1054.58 l

5 1039.75 20 1072.79 6

IQ72 QB 21 1Q71.25 7

1QZ3.33 22 1071.67 8

1074.54 23 1057.04 9

1074.50 24 1075.54 10 10Z.4. 50 25 1072.75 11 10Z3142 26 1070.92 12 1QZQ213 27 1D13.58 13 1QE9.79 28 1076.17 14 1074.BB 29 1074.88 15 1QZZ,36 30 1073.83 31 1073.79 I

i 5

1 Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: J0:362 UNIT NAME:

SONGS - 3 DATE:

REVISION COMPLETED BY:

R. L. Kaplan TELEPHONE:

(714) 368-6834 OPERATING _SIAIUS j

_S n_Dnof re NucleAt _Generalin_gjiation. Urtit 3 1.

Unit Name:

4 2.

Reporting Period:

April 1994 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net MWe):

1010 6.

Maximum Dependable Capacity (Gross MWe): __1127 7.

Maximum Dependable Capacity (Net MWe):

1QRQ 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 719100 2JZ910D 8SJ6?JQ_

12.

Number Of Hours Reactor Was Critical 7131QQ 2.879_109 68.805.45 13.

Reactor Reserve Shutdown Hours Q10D Q1QQ 0.00 14.

Hours Generator On-Line 701109 2.861109 67.157.98 15.

Unit Reserve Shutdown Hours

_Q1DQ 0.QQ 0.00

!k

$ $$ E cWic$Ebry"be at WH 1

Q I

18.

Net Electrical Energy Generated (MWH) 733.833.00 _2JJ5.443&QQ _f21248 41 L 14_

19.

Unit Service Factor 9Z111%

99.33%

76190%

20.

Unit Availability Factor 97.51%

99.38%

76.00%

21.

Unit Capacity Factor (Using MDC Net) 94.50%

96102%

71116g 22.

Unit Capacity Factor (Using DER Net) 94.50%

96 02%

72 15%

2 1

23.

Unit Forced Outage Rate Q10Q%

0 DQ%

6.61%

4 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Rone 25.

If Shutdown At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 6

I