ML20069M130

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for May 1994 for San Onofre Nuclear Generating Station,Unit 2 & 3 & Revised Monthly Operating Repts for Feb,March & April 1994
ML20069M130
Person / Time
Site: San Onofre  
Issue date: 06/15/1994
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20069M109 List:
References
NUDOCS 9406210169
Download: ML20069M130 (1)


Text

- -

o a

f 4..a '

g Southom Califomia Edison Company 4

P3 P AltK E' F t S T H L ET T IHVINE, CALIFOf tNIA 9271tl wAu e n c uans" June 15,1994

-"=

MANAEJL H (W 64L K L f AM fit UL.8L A Ff)F(( AD F A.HS (7 9 4) 4fh4 4403 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for May 1994 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves: any changes to the Offsite Dose Calculation Manual (ODCM): and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made effective.

This letter transmits the May 1994 Monthly Operating Reports for Units 2 and 3, respectively.

There were no challenges to safety valves, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.

Also note that due to an Edison Energy Accounting Office error and a damaged magnetic computer tape, the Monthly Operating Reports for Unit 2 for March and April 1994, and the Monthly Operating Reports for Unit 3 for February, March and April 1994, require revision and are attached for your information.

If you require any additionalinformation, please let me know.

Sincerely.

Enclosures cc:

L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr.. Director, Walnut Creek Field Office, NRC Region IV 4

M. B. Fields, NRC Project Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident inspector. San Onofre Units 1. 2 & 3 V I 9406210169 940615 PDR ADOCK 05000361

/

. l I l R

PDR

]

.l