Revised Monthly Operating Repts for April 1994 for San Onofre Nuclear Generating Station,Unit 2
ML20069M145
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/30/1994
From: Kaplan R
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20069M109 List:
References
NUDOCS 9406210183
Download: ML20069M145 (1)


Text

.

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE:

REVISION COMPLETED BY:

R. L. Kaplan TELEPHONE:

(714) 368-6834 QPJRATING STAIUS 1.

Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2 2.

Reporting Period:

April 1994 3.

Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rat-ing (Net MWe):

1Q70 6.

Maximum Dependable Capacity (Gross MWe):

1127 7.

Maximum Dependable Capacity (Net MWe):

1070 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 71R10Q 2,8791QQ 93.816 0Q_

1 12.

Number Of Hours Reactor Was Critical 719100 2.879.00 70.333139_

13.

Reactor Reserve Shutdown Hours 0_100 Q10D 0.00 14 Hours Generator On-Line 719.00 2.879100 69.750 34_

1 15.

Unit Reserve Shutdown Hours Q100 0100 0.00 16.

Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14 17.

Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_

18.

Net Electrical Energy Generated (MWH) 777.113 Q0_ 3.1051051.00 _l32359.749188_

19.

Unit Service Factor 1DQ100%

100 QD%

74.31%

20.

Unit Availability Factor 10Q10Q%

1QQ100%

74.33%

21.

Unit Capacity Factor (Using MDC Net) 101.01%

1Q0 80%

73.Q3%

1 22.

Unit Capacity Factor (Using DER Net) 1Q1 Q1%

10018Q%

73 0R%

t 1

23.

Unit Forced Outage Rate Q.00%

0.00%

5.94%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 25.

If Shutdown At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1