Revised Monthly Operating Repts for April 1994 for San Onofre Nuclear Generating Station,Unit 2
ML20069M145
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/30/1994
From: Kaplan R
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20069M109 List:
References
NUDOCS 9406210183
Download: ML20069M145 (1)


Text

.

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE:

REVISION COMPLETED BY: R. L. Kaplan TELEPHONE: (714) 368-6834 QPJRATING STAIUS

1. Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2
2. Reporting Period: April 1994
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rat-ing (Net MWe): 1Q70
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1070
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 71R10Q 2,8791QQ 93.816 10Q_
12. Number Of Hours Reactor Was Critical 719100 2.879.00 70.333139_
13. Reactor Reserve Shutdown Hours 0_100 Q10D 0.00 14 Hours Generator On-Line 719.00 2.879100 69.7501 34_
15. Unit Reserve Shutdown Hours Q100 0100 0.00
16. Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14
17. Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_
18. Net Electrical Energy Generated (MWH) 777.113 Q0_ 3.1051051.00 _l32359.749188_
19. Unit Service Factor 1DQ100% 100 QD% 74.31%
20. Unit Availability Factor 10Q10Q% 1QQ100% 74.33%
21. Unit Capacity Factor (Using MDC Net) 101.01% 1Q0180% 73.Q3%
22. Unit Capacity Factor (Using DER Net) 1Q1tQ1% 10018Q% 7310R%
23. Unit Forced Outage Rate Q.00% 0.00% 5.94%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1

2 9406210163 940615 I PDR ADOCK 05000361 R PDR l