Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000395/LER-1982-043-03, /03L-0:on 821113,nuclear Instrumentation Power Range Channel (N42) low-range Trip Setpoint Found Set at 50% Instead of 25% of Rated Thermal Power.Caused by Personnel error.Low-range Trip Setpoint Reset + (14:46:05, 16 December 2024)
- ML20070F196 + (14:46:06, 16 December 2024)
- ML20070F190 + (14:46:06, 16 December 2024)
- 05000395/LER-1982-043, Forwards LER 82-043/03L-0.Detailed Event Analysis Encl + (14:46:07, 16 December 2024)
- ML20070F163 + (14:46:08, 16 December 2024)
- ML20070F166 + (14:46:08, 16 December 2024)
- AECM-82-597, Forwards Monthly Operating Rept for Nov 1982 + (14:46:09, 16 December 2024)
- ML20070F161 + (14:46:09, 16 December 2024)
- 3F0291-12, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1990 + (14:46:10, 16 December 2024)
- ML20070F147 + (14:46:11, 16 December 2024)
- ML20070F148 + (14:46:11, 16 December 2024)
- ML20070F142 + (14:46:12, 16 December 2024)
- ML20070F139 + (14:46:13, 16 December 2024)
- ML20070F135 + (14:46:13, 16 December 2024)
- ML20070F128 + (14:46:14, 16 December 2024)
- ML20070F126 + (14:46:14, 16 December 2024)
- ML20070F125 + (14:46:15, 16 December 2024)
- ML20070F122 + (14:46:18, 16 December 2024)
- ML20070F118 + (14:46:18, 16 December 2024)
- ML20070F114 + (14:46:25, 16 December 2024)
- ML20070F112 + (14:46:29, 16 December 2024)
- ML20070F106 + (14:46:30, 16 December 2024)
- ML20070F109 + (14:46:30, 16 December 2024)
- B14892, Forwards Rev 0 to Calculation 0024-00099-MOT-01, Selection of Motion for A-46 Evaluation, Per GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 + (14:46:31, 16 December 2024)
- ML20070F096 + (14:46:34, 16 December 2024)
- ML20070F092 + (14:46:35, 16 December 2024)
- ML20070F090 + (14:46:36, 16 December 2024)
- ML20070F084 + (14:46:36, 16 December 2024)
- NPL-94-0264, Provides Addendum to TS Change Request 166 Re Mod to TSs 15.3.1, LCO, 15.3.14, Fire Protection Sys, 15.3.7, Auxiliary Electrical Sys & 15.4.6, Emergency Power Sys Periodic Tests, Per 940607 Meeting W/Nrc + (14:46:37, 16 December 2024)
- HL-4643, Forwards Owner Data Rept for ISI Ei Hatch Nuclear Plant Unit 2,Mar-Apr 1994 + (14:46:38, 16 December 2024)
- ML20070F079 + (14:46:38, 16 December 2024)
- ML20070F074 + (14:46:39, 16 December 2024)
- ML20070F072 + (14:46:40, 16 December 2024)
- NRC-94-4174, Forwards Rev 0 to PCS-GSR-001, AP600 Passive Containment Cooling Sys Design Basis Analysis Model & Margin Assessment + (14:46:41, 16 December 2024)
- U-601801, Annual Operating Rept 1990 + (14:46:42, 16 December 2024)
- ML20070F059 + (14:46:43, 16 December 2024)
- ML20070F054 + (14:46:44, 16 December 2024)
- ML20070F050 + (14:46:45, 16 December 2024)
- ML20070F046 + (14:46:46, 16 December 2024)
- 05000346/LER-1994-001, :on 940608,discovered That TS Safety Features Actuation Sys Setpoint Required in Mode 6,refueling Calibr at Greater than Required Setpoint.Caused by Incorrect Evaluation.Trip Setpoints Will Be Adjusted + (14:46:48, 16 December 2024)
- ML20070F042 + (14:46:50, 16 December 2024)
- ML20070F037 + (14:46:50, 16 December 2024)
- ML20070F036 + (14:46:51, 16 December 2024)
- ML20070F030 + (14:46:52, 16 December 2024)
- ML20070F018 + (14:46:52, 16 December 2024)
- ML20070F017 + (14:46:53, 16 December 2024)
- ML20070F012 + (14:46:53, 16 December 2024)
- ML20070F009 + (14:46:54, 16 December 2024)
- ML20070F006 + (14:46:55, 16 December 2024)
- ML20070F003 + (14:46:55, 16 December 2024)
- ML20070E998 + (14:46:56, 16 December 2024)
- ML20070E996 + (14:46:56, 16 December 2024)