Text
my we g Q,3, pr %w smen
,=
j et T% 15077-0D04 -
February 28, 1991 D,$$E. %
emw U.
S. Nuclear' Regulatory Commission
/ ' Attn:- Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 185 (TAC No. 79703)
Enclosed are the following' items:
1.
An application for amendment to the operating license to modify-Technical Specification Surveillance Requicement 4.7.1.5 for the main steam.line isolation valves (MSIV's) to reflect the Standard Technical Specification requirements.
2.-
Documents designated Attachments A,B,C,D and E which set forth, respectively, the_ change in technical specifications, _ safety analysis and no significant hazard evaluation, typed replacement technical specification
- page, applicable UFSAR changes, and an information copy of the revised inservice test (IST) program cold shutdown justification for the MSIV's.
Approval :of_ this amendment is requested by May 1, 1991, to allow the: elimination of -certainidesign change work scheduled for the 8th refueling outage.
This = proposed change was reviewed by the Onsite Safety Committee
-and --Offsite. Review Committee and was determined to be safe and does
- not? involve an-unreviewed safety question ~.
Sincerely, h.
J.
D. -- Sieber-Vice President Nuclear Group cc:
Mr. J.
Beall, Sr. Resident Inspector
-Mr. T.
T._ Martin, NRC' Region I Administrator Mr. A. W.
DeAgazio, Project Manager Mr. T.
M. Gerusky, Director BRP/ DER Mr; P,. Janati, BRP/ DER Mr. R.-Saunders (VEPCO) 9103080171 910228 hDR ADOCK 05000334