Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072F325 + (10:26:57, 15 December 2024)
- ML20072F309 + (10:26:58, 15 December 2024)
- ML20072F305 + (10:27:01, 15 December 2024)
- ML20072F302 + (10:27:05, 15 December 2024)
- ML20072F299 + (10:27:05, 15 December 2024)
- ML20072F294 + (10:27:06, 15 December 2024)
- 05000366/LER-1983-031-01, /01T-0:on 830530,while Performing Fuel Movement Operation Procedure (HNP-2-9302),11 Fuel Assemblies Discovered Loaded Out of Proper Core Orientation.Caused by Personnel Error.Individual Counseled + (10:27:07, 15 December 2024)
- ML20072F290 + (10:27:19, 15 December 2024)
- ML20072F286 + (10:27:23, 15 December 2024)
- ML20072F285 + (10:27:24, 15 December 2024)
- ML20072F280 + (10:27:25, 15 December 2024)
- ML20072F284 + (10:27:25, 15 December 2024)
- ML20072F279 + (10:27:26, 15 December 2024)
- ML20072F278 + (10:27:33, 15 December 2024)
- ML20072F271 + (10:27:37, 15 December 2024)
- ML20072F275 + (10:27:37, 15 December 2024)
- ML20072F266 + (10:27:39, 15 December 2024)
- ML20072F269 + (10:27:39, 15 December 2024)
- ML20072F265 + (10:27:40, 15 December 2024)
- 05000339/LER-1983-042-03, /03L-0:on 830522,w/unit in Mode 4,RCS Unidentified Leakage Exceeded Tech Spec 4.6.2 Limit.Caused by Shaft Sleeve Gasket Failure on RHR Pump A.No Cause Determined. Mechanical Seal & Gasket Replaced + (10:27:42, 15 December 2024)
- ML20072F263 + (10:27:46, 15 December 2024)
- ML20072F262 + (10:27:50, 15 December 2024)
- ML20072F261 + (10:27:54, 15 December 2024)
- ML20072F257 + (10:27:58, 15 December 2024)
- ML20072F256 + (10:27:59, 15 December 2024)
- ML20072F253 + (10:28:00, 15 December 2024)
- ML20072F251 + (10:28:01, 15 December 2024)
- ML20072F248 + (10:28:02, 15 December 2024)
- ML20072F250 + (10:28:02, 15 December 2024)
- BSEP-94-0316, Forwards Reactor Vessel Matl Surveillance Specimen Test Results,Per 10CFR50,App H + (10:28:03, 15 December 2024)
- ML20072F246 + (10:28:03, 15 December 2024)
- ML20072F240 + (10:28:04, 15 December 2024)
- ML20072F237 + (10:28:05, 15 December 2024)
- ML20072F234 + (10:28:05, 15 December 2024)
- ML20072F228 + (10:28:06, 15 December 2024)
- ML20072F224 + (10:28:06, 15 December 2024)
- 05000373/LER-1983-049-03, /03L-0:on 830520,during Evaluation of Turbine Bypass Valve Sys Response Time Requirements,Data from LIS-EH-03 Improperly Evaluated.Caused by Incorrect Wiring of Control Circuitry for Valves 2 & 5 + (10:28:08, 15 December 2024)
- TAC:49540 + (10:28:09, 15 December 2024)
- ML20072F221 + (10:28:10, 15 December 2024)
- 05000369/LER-1983-034-03, /03L-0:on 830515,cold Leg Injection Accumulator (Cla) a Declared Inoperable Due to Vol Exceeding Tech Spec Limits.Caused by Leakage Through Valve Seats of Valves 1NI-55,1NI-56 & 1NI-57.Valves Replaced + (10:28:11, 15 December 2024)
- ML20072F217 + (10:28:12, 15 December 2024)
- ML20072F215 + (10:28:13, 15 December 2024)
- ML20072F216 + (10:28:13, 15 December 2024)
- ML20072F213 + (10:28:19, 15 December 2024)
- ML20072F212 + (10:28:20, 15 December 2024)
- ML20072F207 + (10:28:21, 15 December 2024)
- ML20072F209 + (10:28:21, 15 December 2024)
- ML20072F206 + (10:28:22, 15 December 2024)
- ML20072F200 + (10:28:22, 15 December 2024)
- ML20072F199 + (10:28:23, 15 December 2024)
- ML20072F195 + (10:28:24, 15 December 2024)