Forwards Onsite Emergency Planning Contentions,In Response to ASLB 830516 Memorandum of Order
ML20072F207
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/17/1983
From: Dorsey J
DORSEY, J.A.
To: Brenner L, Cole R, Morris P
Atomic Safety and Licensing Board Panel
Shared Package
ML20072F210 List:
References
NUDOCS 8306270297
Download: ML20072F207 (35)


Text

_ _ _ _ _ _ _ _ _ _.

JUDITH A. DORSEY LAW OFFICES 1315 WALNUT ST SUITE 1632 PIHLADELPHIA. PA.19107 215 735 7200 June 17, 1983 Lawrence Brenner, Chair

,C" lEss

\\

Administrative Judge b

U.S. Nuclear Regulatory Commission j

g,,

Washington, DC 20555 f,

L..,

P 2

DON 2 g T.

Dr. Richard F.

Cole

~

3>

~

Administrative Judge II U.S. Nuclear Regulatory Commission

[6f# men;

'"_0Lha Washington, DC 20555 q,

Dr. Peter A. Morris N

Administrative Judge U.S. Nuclear Regulatory Commission Washington, DC 20555 Re:

Limerick Generating Station, Units 1 and 2 Philadelphia Electric Company Docket Nos. 50-352, 50-353 Gentlemen, Please find enclosed on-site emergency planning contentions for Limerick Ecology Action, in response to the Board's May 16, 1983 Memorandum and Order.

LEA, as lead intervenor for emergency planning, did not receive contentions from any other parties for joint submission to the Board.

The scope of the contentions is contained in the attached document.

LEA notes that the distinction between on-site and

~

off-site emergency planning is a somewhat superficial distinction, as noted also by the Board at the May 9-11, 1983 prehearing conference.

Off-site and on-site issues may indeed merge at various points as litigation of these matters progresses.

LEA also notes for'the Board's consideration that LEA was put in the position of filing many on-site emergency planning contentions that allege a lack of information, realizing that the Board would prefer not to have such contentions before it.

Since it was the Applicant's position that very few changes would be necessary for its on-site plan, the Board set June 21 for the submission of contentions related to on-site planning.

8306270297 830617 PDR ADOCK 05000352 Q

PDR

r s

o )

Brenner, page 2.

Since LEA does not wish to prejudice itself by failing to allege informational deficiencies in the plan,it does so, recognizing that such contentions may again be denied without prejudice to a later filing.

Finally, LEA notes for the. Board's information that it has not attempted in this filing to maintain the numbering system for emergency planning contentions that was used in its first filing, other than to retain the prefix "VIII."

That is, contentions that are very similar to or the same as original contentions, do not necessarily retain their original numbers, since intervenors are essentially " starting over," as discussed at the May 9-11 conference.

Respectfully subm'tt d, l

J ith A. Dorsey C arles W. Elliott Counsel for Limerick Ecology Action O