Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072Q466 + (09:34:27, 15 December 2024)
- 05000366/LER-1983-006, Forwards LER 83-006/03L-0 + (09:34:28, 15 December 2024)
- ML20072Q442 + (09:34:34, 15 December 2024)
- ML20072Q435 + (09:34:37, 15 December 2024)
- ML20072Q417 + (09:34:38, 15 December 2024)
- ML20072Q425 + (09:34:38, 15 December 2024)
- 1CAN089402, Application for Amend to License DPR-51,revising TS 3.7.1.D, 3.7.2.E & 4.6.2.4 Re Auxiliary Electrical Sys + (09:34:39, 15 December 2024)
- 0CAN089409, ANO Units 1 & 2 Seminannual Radioactive Effluent Release Rept Jan-June 1994 + (09:34:40, 15 December 2024)
- 05000482/LER-1994-007, :on 940124,surveillance Test Procedure STS KJ-005A Incorrectly Marked Step 5.2.10.2 as Not Applicable. Caused by Cognitive Personnel Error.Revised Procedures STS KJ-005A & STS KJ-005B + (09:34:42, 15 December 2024)
- ML20072Q390 + (09:34:46, 15 December 2024)
- ML20072Q392 + (09:34:46, 15 December 2024)
- ML20072Q388 + (09:34:47, 15 December 2024)
- ML20072Q387 + (09:34:47, 15 December 2024)
- ML20072Q382 + (09:34:48, 15 December 2024)
- 05000255/LER-1983-016-03, /03L-0:on 830224,sample from D Safety Injection Tank T-82D Showed Boron Concentration Below Tech Spec Limit. Caused by Minor Leakage Past Loop Check Valve & Tank Check Valve or Fill & Drain Valve.Concentration Restored + (09:34:49, 15 December 2024)
- 05000416/LER-1993-019, :on 931122,during Preparation to Perform Static Diagnostic Testing of PCS Sys Globe Valve,Yoke Failed Catastrophically.Caused by Disc & Disc Nut Separating from Stem.Valve Parts Replaced + (09:34:51, 15 December 2024)
- 05000255/LER-1983-016, Forwards LER 83-016/03L-0 + (09:34:52, 15 December 2024)
- ML20072Q356 + (09:34:56, 15 December 2024)
- LD-90-005, Design Certification Licensing Review Basis Document + (09:34:58, 15 December 2024)
- ML20072Q340 + (09:34:59, 15 December 2024)
- ML20072Q338 + (09:35:00, 15 December 2024)
- ML20072Q329 + (09:35:01, 15 December 2024)
- ML20072Q337 + (09:35:01, 15 December 2024)
- 1CAN089401, Application for Amend to License DPR-51,relocating Addl Cycle Specific Parameter Limits to Colr,Per GL 88-16 + (09:35:02, 15 December 2024)
- ML20072Q322 + (09:35:03, 15 December 2024)
- 05000237/LER-1983-018-01, /01T-0:on 830315,during Local Leak Rate Testing, 763 Std Cubic Ft Per Hour Leakage Measured Through Valve A0-1601-24.Caused by Valve Seat Surface Aging.Valve Replaced & Vol Retested + (09:35:04, 15 December 2024)
- ML20072Q314 + (09:35:05, 15 December 2024)
- 05000237/LER-1983-018, Forwards LER 83-018/01T-0.Detailed Event Analysis Encl + (09:35:06, 15 December 2024)
- ML20072Q309 + (09:35:06, 15 December 2024)
- 05000255/LER-1983-017-03, /03L-0:on 830305,B Safety Injection Tank T-82B Level Reached Tech Spec Limit.Caused by Minor Leakage Past Loop Check Valve & Safety Injection Tank Valves.Primary Coolant Leak Rate Monitored + (09:35:08, 15 December 2024)
- ST-HL-AE-4870, Forwards Semiannual Fitness for Duty Program Performance Rept for Jan-June 1994 + (09:35:09, 15 December 2024)
- 05000255/LER-1983-017, Forwards LER 83-017/03L-0 + (09:35:10, 15 December 2024)
- 05000254/LER-1983-012, Forwards LER 83-012/01T-0 + (09:35:11, 15 December 2024)
- ML20072Q281 + (09:35:11, 15 December 2024)
- 05000237/LER-1983-015-03, /03L-0:on 830225,leak Detected in 30-inch Suction Pipe 2223-6 of Connector Recirculation Pump a Due to Fine Edged Hole in Top Weld.Hole Caused by Stress Corrosion Cracking.Concentrator Taken Out of Svc & Pipe Repaired + (09:35:13, 15 December 2024)
- ML20072Q273 + (09:35:14, 15 December 2024)
- 05000249/LER-1983-011-01, /01T-0:on 830314,LPCI Pump Suction Valve MO3-1501-5A Failed to Close.Caused by Mechanical Overload Which Broke Manual Operator Housing.Cause of Overload Undetermined.Valve Motor & Manual Operator Housing Replaced + (09:35:15, 15 December 2024)
- 05000237/LER-1983-015, Forwards LER 83-015/03L-0 + (09:35:16, 15 December 2024)
- 05000249/LER-1983-011, Forwards LER 83-011/01T-0 + (09:35:17, 15 December 2024)
- ML20072Q249 + (09:35:18, 15 December 2024)
- ML20072Q247 + (09:35:18, 15 December 2024)
- ML20072Q244 + (09:35:19, 15 December 2024)
- 05000316/LER-1983-027-03, /03L-0:on 830222,W Component Cooling Water HX Discharge Isolation Valve CMO-416 Would Not Close Completely & Trip Torque Switch.Caused by Limitorque Valve Operator Torque Switch Being Adjusted to Min Setting + (09:35:21, 15 December 2024)
- ML20072Q226 + (09:35:22, 15 December 2024)
- ML20072Q231 + (09:35:22, 15 December 2024)
- ML20072Q204 + (09:35:23, 15 December 2024)
- ML20072Q223 + (09:35:23, 15 December 2024)
- NG-83-0723, Forwards Correct Attachment to 830203 Response to NRC Re Violations Noted in IE Insp Rept 50-331/82-11 Re Diesel Oil Transfer Pump + (09:35:24, 15 December 2024)
- ML20072Q197 + (09:35:26, 15 December 2024)
- 0CAN088201, Submits Initial Responses to 820602 IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants. Action Items Re Plant Shielding & post-accident Sampling Addressed + (09:35:27, 15 December 2024)
- ML20072Q186 + (09:35:27, 15 December 2024)