Text
,s' f
P.O. BOX 5000 - CLEVELAND, OHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG - 55 PUBLICSQUARE n
c p
- n s
11 s
(
a
.. t, Serving The Best Location in the Nation MURRAY R. EDELMAN VICE NtESl0ENT NUCLE A R March 25, 1983 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Piping Supports Supplied by Transamerica Delaval, Inc.
[RDC 67(83)]
Dear Mr. Keppler:
This letter is an interim report pursuant to 10CFR50.55(e) concerning ASME Code Section III, Class 3, piping supports supplied to the Perry Nuclear Power Plant by Transamerica Delaval, Inc.
Mr. P. R. Pelke of your office was first notified on February 23, 1983, by Mr. E. Riley of The Cleveland Electric Illuminating Company (CEI) that this problem was being evaluated.
This report contains a description of the deficiency, of the method planned for completion of the evaluation, and the date for submittal of our next report on this subject.
Description of Deficiency Specification 562-4549-00, Section 2:05 Item 3a and Section 2:16 Item 1, require that most piping components are to be built to the ASME Code Section III, Class 3.
Transamerica Delaval, contracted under specification 562-4549-00, supplied skid mounted piping supports without material certification and identification as outlined in ASME NF-2130 and NF-2150.
Completion of Evaluation The Cleveland Electric Illuminating Company is currently obtaining design information from Transamerica Delaval to determine whether modifications will be necessary to meet the requirements of Section III of the ASME Boiler and Pressure Vessel Code. The vendor is marking the assembly drawings to indicate MAR 2 81983 8304040533 030325 PDR ADOCK 05000440 S
$U?
Mr. J:mes G. Kzppler March 25, 1983 o-code breaks. CEI and Gilbert Associates, the Architect / Engineer, will review the drawings for compliance with the Code and Specification 562-4549-00, and determine whether modifications are needed.
Completion of this action is expected by April 30, 1983, and we are planning to submit our next report at that time.
Please call if there are additional questions.
Since ly, T/1-l 1Ava Murray R.
Edelman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
- = -
9 w--
--my e
r m
e ews M
w t--