Rev 1 to Interim Deficiency Rept DER 82-46 Re Failure of ITT-Barton Pressure Transmitters to Meet Overpressure Requirements.Initially Reported on 820824.Final Rept Will Be Submitted by 830608.Also Reportable Per Part 21
ML20072Q226
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/17/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, ANPP-23274-RQT, DER-82-46, NUDOCS 8304040500
Download: ML20072Q226 (3)


Text

-

Docket Nos. 50-528/529/530 50.55(e)geport e

g..opy.

' Arizona Public Service Company j *. ((G P.O. box 21666. PHOENIX, ARIZONA 85036 N ff!I?: n

~"

1.

March 17, 1983 ANPP-23274-1EQ'IfBSK

<Q3 U. S. Nuclear Regulatory Commission-

Region V

-Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch'1

Subject:

Interim Report - Revision 1 - DER 82-46 A 50.55(e) Potentially Reportable Deficiency Relating to ITT-Barton Pressure Transmitters Supplied By C-E Do Not Meet Overpressure Requirements File: 83-019-026 D.4.33.2 i

Reference:

-(A) Telephone Conversation between J. Eckhardt and G. Duckworth on August 24, 1982 (B) ANPP-21837, dated September 15, 1982 (Interim Report)

(C) ANPP-22279, dated November 15, 1982 (Time Extension)

(D) ANFP-22731 dated January 14, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), a Time Extension was requested by Reference'(C), and a Time-Extension was requested by Reference (D). At that time, it was estimated that a Final Report would be available by March 22, 1983.

Due to the extensive investigation and evaluation required, a revised-Interim Report is attached. It is now expected that this information will be finalized by June 8, 1983, at which time a complete report will be submitted.

Very truly yours, CLLL.

A1-E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects IIanagement ANPP Project Director EEVBJr/RQT:db I

f]

Enclosure I

cc: See Attached Page 2 L

8304040500 830317 PDR ADOCK 05000528 S

PDR

'h

f s

U. S. Nuclear Regulatory Commission March.17, 1983

' Attention:

Mr.'D. H. Sternberg, Chief' ANPP-23274-RQT/BSK Page 2-cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

. Washington,-D. C.'20555 T. G. Woods,'Jr.

J. A. Roedel D. B. Fasnacht G. C.~Andognini J. R. Bynum A. C. Rogers B.-S. Kaplan

- W. E. Ide J. Vorees P. P. Klute/D. D. Green A. C. Gehr

-W. J. Stubblefield W. G. Bingham

.R.'L. Patterson R. W. Welcher R. H. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli

3

-~.

e

. ss 4

1*

o 1

-INTERIM REPORT - REVISION DER 82-46 POTENTIAL REPORTABLE DEFICIENCY.

7

^

ARIZONA.PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT l-

,I.

POTENTIAL PROBLEM 1

+

.As documented by Combustion Engineering'(C-E) letter _V-CE-20050~

dated 4/29/82, two (2) ITT Barton Model 763~ pressure transmitters.

l have been installed in-Unit 1-which do not' meet the required-overpressure. range. -The transmitter's range is 0-735 psig and-the C-E overpressure requirement is 2235-2485 psig. The condition is applicable to Pressurizer Restricted Range transmitters tag numbers LPT-103 and PT-104.. An additional four (4) ITT Barton Model 763 transmitters have been delivered to the'jobsite but the disposition for these has not been established.

A

'ITT Barton has also filed a 10CFR'Part 21 report concerning the

,c Models 763'and 764 Electronic Transmitters based on thermal non-repeatability at nominal in-containment ambient temperatures (reference-letter V-CE-17362 dated 11/11/83.

II. APPROACH TO AND STATUS OF PROPOSED RESOLUTION ITT Barton has presented a. remedial plan to C-E regarding the r

[_

transmitters (Models 763 and 764).. ThisJand other related items are currently being reviewed by C-E for developing a corrective action

. plan.

C-E will notify-Bechtel'of the review results upon completion.-

4 F

III. PROJECTED COMPLETION'0F CORRECTIVE ACTION

'AND SUBHITTAL OF THE FINAL REPORT

~

Evaluation offthis condition and submittal of the Final Report is forecast 'to be completed by June 8,1983.