ML20072Q338

From kanterella
Jump to navigation Jump to search
Forwards Fitness for Duty Program Performance Data for Period Jan-June 1994
ML20072Q338
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/30/1994
From: Peevy J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
ULNRC-3058, NUDOCS 9409090242
Download: ML20072Q338 (6)


Text

_

s.

Caliaway Plant Post Ofhce Bat 620 funen. Macun 65251 August 30,1994 ULNRC - 3058 Union

. Euzcnuc 53 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attention: Document Control Desk

)

Mail Stop P1-137 Washington, DC 20555 Gentlemen:

In complying with the Fitness For Duty Rule, 10CFR26.71(d), Recordkeeping Requirements, please find enclosed Union Electric's Callaway Nuclear Plant Fitness For Duty Program Performance Data for the six (6) month period beginning January 1,1994 and ending on June 30,1994.

Enclosures include:

Attachment A Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (2 pages)

Attachment B Fitness For Duty (additional statistical data)

Attachment C Fitness For Duty Management Action (1 page)in regards to:

  • Initiatives Taken
  • Lessons Leamed
  • Reportable Fitness For Duty Events Under 10CFR26.73 If you have any questions in regards to the Performance Data Reported, please contact me at (314) 676-8246.

Sincerely, j

\\

Q 4A Ja

'es R. Peevy l

Manager, Emergency Preparedness Organizational Support Fitness For Duty Manager JRP/RGR/bb Enclosures

[

,1 r-9409090242 940830 1

PDR ADOCK 0S0004B3 p

PDR I

w/ attachments cc:

J. B. Martin, Regional Administrator U. S. Nuclear Regulatory Commissien Region 111 801 Warrenville Road Lisle, IL 60532-4351 M. J Farber Chief, Reactor Projects Section !!! A U. S. Nuclear Regulatory Commission Region lil 801 Warrenville Road Lisle, IL 60532-4351 B. L. Bartlett /D. R. Calhoun Resident NRC Inspector, Callaway Plant Callaway Resident Office U. S. Nuclear Regulatorv Commission 8201 NRC Road Steedman, MO 65077-1302 L R. Wharton (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13-E-21 Washington, DC 20555 Missouri Public Service Commission Manager, Electric Department P. O. Box 360 Jefferson City, MO 65102 Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street, N.W.

Washington, DC 20037 l

l

Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92) 1 Union Electric January - June 1994 Company 6 Months Callaway PJia_nt Location i

Patricia Davisl N.

t'314) 676-4300

)

Contact Name Phone (include Area Code)

CuttofTs:

Screen / Confirmation (ng/ml)

O Appendix A to 10CFR26 Marijuana 20/ 15 Amphetamines 1000 / 250 Barbiturates 300/ 150 Cocaine 300/ 150 Phencyclidine 25/ 25 Benzodiazepines 300/150 Opiates 300/ 150 Alcohol (.04% BAC) i 1

Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel i

Average Number with Unesconed Access 943 164 19 i

Categories Tested Positive Tested Positive Tested Positive Pre-Access 32 0

0 0

55 0

i Post Accident 0

0 0

0 0

0 Observed Behavior 0

0 0

0 0

0 Random 286 0

53 0

6 0

Follow-up 2

0 0

0 0

0 Other 0

0 0

0 0

0 I

Thtal 320 0

53 0

61 0

4 ATTACHMENT A Page 1 of 2

4 i

Breakdown of Confirmed Positive Tests for Specific Substances e

u E

e E

e i

e a

e E

N E

s m

o a

w E

8 E

=

r 8

a e

.E 8

s e

e

=2 o

O a.

R tr m

m m

o

,e m

l Licensee Employees l

Long-Term Contractors Short-Term Contractors TOTAL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0

  • Left Side - Record of test results that would have been Positive at the NRC cutoff level.

Right Side - Record of MRO Confirmed Positives based on Union Electric's more stringent cutoff level.

There were no confirmed positive tests for this time frame.

NO Eh

~ rn ZH>

e FITNESS FOR DUTY Below is a summary of Fitness for Duty statistical information for:

UNION CONTRACT /

ELECTRIC CONSULTANT TOTALS Pre-Employment 7

0 7

Pre-Badge 25 55 80 Random 286 59 345 Follow-Up 2

0 2

Post Accident 0

0 0

Test-for-Cause 0

0 0

Appeal /Other 0

0 0

l TOTALS l

320 l

114 l

434 l

l Cumulative Average Population l 943 l

183 l

1126 l

i l

l Individuals Randomly Screened:

UNION CONTRACT /

ELECTRIC CONSULTANT TOTALS i

l Screened Zero 702 131 833 Screened Once 203 46 249 l

Screened Twice 33 5

38 l

Screened Three Times 4

1 5

Screened Four Times 0

0 0

Screened Five Times 1

0 1

l 1

l l

l ATTACHMENTB l

_=

InitiativesILessons Learned l

It was learned during this reporting period, that 10CFR26 as currently written does not require periodic audit of HHS labs after the pre-award audit.

l Reportable Fitness For Duty Events Under 10CFR26.73 No events requiring reporting occurred during the reporting period.

l l

l ATTACHMENT C

.